Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

920 Roselawn Ave

The City of Toronto has 5 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Demolition

    Proposal to demolish existing control building at Fairbank Transformer Station

    Applied Sep 18, 2024 · issued Jul 14, 2025 · completed Oct 8, 2025 · Permit 24 214563 DEM

    Closed
  • Drains and site services · Site service

    Proposed: new water and sewage connections (drain permit) at fairbank transformer station.

    Applied Sep 15, 2023 · Permit 23 202535 STS

    Refusal notice
  • Plumbing

    Plumbing - Proposed construction of a new 1-storey Medium Voltage Gas Insulated Switchgear (MVGIS) and Protection, Control and Telecom (PCT) non-comcombination building for electrical infrastructure and utility use. (F2 post-disaster building.) No occupants except occasional maintenance and servicing.

    Applied Mar 16, 2020 · issued Apr 21, 2020 · Permit 19 253163 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed construction of a new 1-storey Medium Voltage Gas Insulated Switchgear (MVGIS) and Protection, Control and Telecom (PCT) non-comcombination building for electrical infrastructure and utility use. (F2 post-disaster building.) No occupants except occasional maintenance and servicing.

    Applied Mar 16, 2020 · issued May 11, 2020 · completed Sep 10, 2026 · Permit 19 253163 HVA

    Closed
  • New building

    Proposed construction of a new 1-storey Medium Voltage Gas Insulated Switchgear (MVGIS) and Protection, Control and Telecom (PCT) non-comcombination building for electrical infrastructure and utility use. (F2 post-disaster building.) No occupants except occasional maintenance and servicing.

    Applied Nov 25, 2019 · issued Mar 5, 2020 · Permit 19 253163 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 416 Ridelle Ave · Minor variance

    To construct a new detached house with a rear terrace.

    170 m away · filed Jul 7, 2026 · Refused

  • 425 Ridelle Ave · Minor variance

    To construct a new detached dwelling and an ancillary building (garden suite) in the rear yard of the property.

    130 m away · filed Feb 23, 2026 · Approved on condition

  • 30 Danesbury Ave · Minor variance

    To convert the existing one-storey detached dwelling into a fourplex by constructing a second and third storey additions and three-storey rear addition.

    150 m away · filed Jul 11, 2025 · Approved

  • 892 Castlefield Ave · Minor variance

    To construct a 3 storey fourplex dwelling.

    120 m away · filed Apr 10, 2025 · Approved

  • 59 Danesbury Ave · Minor variance

    To construct a new 2 storey dwelling, and demolish the garage in the rear yard.

    210 m away · filed Jan 4, 2024 · Approved

  • 933 Briar Hill Ave · Minor variance

    Proposal to extend the deck at the rear of existing detached dwelling.

    230 m away · filed Nov 26, 2021 · Approved

  • 909 Castlefield Ave · Minor variance

    To construct a new dwelling.

    80 m away · filed Aug 31, 2021 · Approved

  • 855 Roselawn Ave · Minor variance

    To add two new apartments on second floor that are currently occupied by unused storage / staff space to create a total of 255 units.

    120 m away · filed Jan 14, 2021 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.