Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

93 Cavell Ave

The City of Toronto has 2 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Party wall admin permits

    Party wall admin permit for construction at 91 Cavell Ave - 18-195061 BLD.

    Applied Jul 17, 2018 · issued Aug 2, 2018 · completed Mar 12, 2024 · Permit 18 195072 BLD

    Closed
  • Drains and site services

    Drain - Proposed basement walkout and deck.

    Applied Feb 10, 2011 · issued Feb 10, 2011 · Permit 10 321459 DRN

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 654-668 Danforth Avenue

    49 storeys · 496 homes · Mixed use

    360 m away · Site plan · Under review · filed Aug 3, 2022

    Under review
  • 975 Danforth Avenue

    10 storeys · 57 homes · Mixed use

    480 m away · Site plan · Under review · filed May 12, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 133 Hazelwood Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition (including a basement extension below), a new covered front porch with stairs, and a rear ground floor deck with stairs. Also, to construct a new one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.

    210 m away · filed Mar 3, 2026 · Approved

  • 562 Jones Ave · Minor variance

    To legalize and to maintain the interior alterations and conversion of the existing two-storey non-residential (Place of Worship) detached building [with an existing front porch with stairs, rear two-car integral garage, side (south) ground floor deck with stairs, side (south) second floor balcony and a rear rooftop patio] into a residential dwelling. There will be one residential dwelling unit on this lot.

    240 m away · filed Aug 12, 2025 · Refused

  • 68 Wroxeter Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a complete third storey addition.

    150 m away · filed Sep 12, 2024 · Approved

  • 80 Wroxeter Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition, and a front third storey dormer.

    130 m away · filed Sep 20, 2023 · Approved

  • 121 Harcourt Ave · Minor variance

    To construct a new 3-storey detached dwelling with a front porch, a front below-grade terrace with a walkout basement entrance for a secondary suite, a rear deck, a rear second storey balcony, and a rear third storey terrace. Also, to maintain the existing one-storey ancillary building in the rear yard of this property.

    150 m away · filed May 3, 2022 · Approved

  • 42 Hazelwood Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a ground floor deck along the west side and north rear walls, a rear second storey cantilevered addition, and a third storey addition with a rear balcony. Also, to construct a two-storey ancillary building (detached garage with a laneway suite) at the rear of the property, abutting the laneway.

    210 m away · filed Apr 21, 2022 · Approved

  • 55 Wroxeter Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear second storey addition and to permit a front yard parking space.

    210 m away · filed Mar 19, 2022 · Approved

  • 124 Harcourt Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a third storey addition. The existing one-storey rear siding addition will be maintained.

    200 m away · filed Jan 14, 2022 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.