Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 20, Scarborough Southwest

93 Cree Ave

The City of Toronto has 5 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Demolition

    Proposal to demolish the existing detached dwelling to construct a new dwelling.

    Applied Aug 25, 2021 · issued Nov 24, 2021 · 1 home removed · Permit 21 204239 DEM

    Permit issued
  • Drains and site services

    Drain - Proposal to construct a new two storey single family dwelling with an integral garage

    Applied Aug 25, 2021 · issued Nov 23, 2021 · Permit 21 204227 DRN

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct a new two storey single family dwelling with an integral garage

    Applied Aug 25, 2021 · issued Nov 23, 2021 · completed Nov 17, 2022 · Permit 21 204227 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to construct a new two storey single family dwelling with an integral garage

    Applied Aug 25, 2021 · issued Nov 23, 2021 · completed Nov 17, 2022 · Permit 21 204227 PLB

    Closed
  • New house · New building

    Proposal to construct a new two storey single family dwelling with an integral garage

    Applied Aug 25, 2021 · issued Nov 23, 2021 · completed Nov 30, 2022 · 1 home added · Permit 21 204227 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new two-storey detached dwelling with finished basement and integral garage.

    Decision: Approved (hearing Jun 23, 2021)

    Filed Mar 17, 2021 · File A0121/21SC

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 194 Phyllis Ave · Minor variance

    To construct a rear yard two-storey Garden Suite. The main dwelling will remain unaltered. This application was deferred at the June 3, 2026 hearing.

    200 m away · filed Apr 9, 2026 · Approved

  • 115 Cree Ave · Minor variance

    To construct a new two-storey detached building (triplex) with a front porch, front second storey balcony, side (south) basement walkout, rear deck, rear second storey balcony and a rooftop balcony. Also, to construct a new driveway on the south side of the lot. The existing one-storey detached dwelling and driveway will be demolished.

    160 m away · filed Jun 18, 2025 · Approved

  • 233 Oakridge Dr · Minor variance

    To demolish existing dwelling and to construct a new two-storey dwelling.

    220 m away · filed Aug 28, 2022 · Deferred

  • 234 Oakridge Dr · Minor variance

    To construct a new two-storey detached dwelling with integral two car garage.

    240 m away · filed Nov 26, 2021 · Refused

  • 188 Phyllis Ave · Minor variance

    To construct a new two-storey detached dwelling with integral two car garage.

    230 m away · filed May 31, 2021 · Approved

  • 217 Oakridge Dr · Minor variance

    To construct a new three-storey detached dwelling. A previous committee of adjustment application (A0236/20SC) refused variances. The applicant has submitted a cover letter and revised previous variances.

    120 m away · filed Feb 8, 2021 · Refused

  • 217 Oakridge Dr · Minor variance

    To construct a new three-storey detached dwelling.

    120 m away · filed Sep 10, 2020 · Refused

  • 222 Oakridge Dr · Minor variance

    To construct a new two-storey detached dwelling with a basement second suite.

    190 m away · filed Jul 7, 2020 · Approved

Everything planned in Scarborough Southwest

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.