Toronto address · Ward 19, Beaches-East York
93 Rainsford Rd
The City of Toronto has 5 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Plumbing
REVISION 01- Revised plumbing fixtures.Plumbing - Proposal to reconstruct the 1 storey addition at the rear of an existing 2 unit semi dwelling.
Applied Jun 16, 2017 · issued Jun 22, 2017 · Permit 17 104027 PLB (revision 01)
- Inspections under way
Drains and site services
Drain - Proposal to reconstruct the 1 storey addition at the rear of an existing 2 unit semi dwelling.
Applied May 17, 2017 · issued May 17, 2017 · Permit 17 104027 DRN
- Inspections under way
Plumbing
Plumbing - Proposal to reconstruct the 1 storey addition at the rear of an existing 2 unit semi dwelling.
Applied May 17, 2017 · issued May 17, 2017 · Permit 17 104027 PLB
- Revision issued
Small residential project · Addition(s)
Revision 1: Existing north party wall to remain, exisitng second floor east exterior wall to remain and add 1hr fire rated basement floor ceiling & 1 hr fire rated south wall in the existing rear additionProposal to reconstruct the 1 storey addition at the rear of an existing 2 unit semi dwelling.
Applied Feb 28, 2017 · issued Mar 1, 2017 · Permit 17 104027 BLD (revision 01)
- Inspections under way
Small residential project · Addition(s)
Proposal to reconstruct the 1 storey addition at the rear of an existing 2 unit semi dwelling.
Applied Jan 13, 2017 · issued Jan 19, 2017 · Permit 17 104027 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
11 storeys · 123 homes · Mixed use
170 m away · Rezoning · Under review · filed Mar 18, 2025
Neighbours’ Committee of Adjustment files within 250 m
52 Herbert Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a front covered basement walkout, a front ground floor covered deck with stairs, and a front second storey deck.
230 m away · filed Aug 26, 2026 · Hearing scheduled
30 Norway Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition.
180 m away · filed Jun 10, 2026 · Approved
28 Hartford Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition.
190 m away · filed Apr 1, 2026 · Approved
390 Woodbine Ave · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a rear two-storey addition. Also, the existing rear two-storey partial addition on the dwelling and the ancillary building (shed), in the rear yard, will be demolished. The existing rear parking pad, abutting the laneway will be maintained and unaltered.
70 m away · filed Oct 14, 2025 · Approved
40 Norway Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition.
210 m away · filed Jun 27, 2025 · Approved
62 Columbine Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by enclosing the front porch and constructing a new front landing with stairs.
50 m away · filed Jun 19, 2025 · Approved
75 Herbert Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing rear first and second storey additions.
200 m away · filed Feb 11, 2025 · Approved
110 Dixon Ave · Minor variance
To alter the existing one-storey ancillary building (detached garage in the rear yard, abutting Woodbine Avenue) by constructing a one-storey addition (along the north wall), and a complete second storey cantilevered addition. This ancillary building will be converted into a garden suite with one residential dwelling unit.
200 m away · filed Nov 12, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.