Toronto address · Ward 14, Toronto-Danforth
943 Greenwood Ave
The City of Toronto has 4 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct a two storey rear addition, interior alteratons, and a new basement walkout and deck at the rear
Applied Oct 12, 2016 · issued Oct 17, 2016 · Permit 16 156212 HVA
- Closed
Plumbing
Plumbing - Proposal to construct a two storey rear addition, interior alteratons, and a new basement walkout and deck at the rear
Applied May 16, 2016 · issued May 24, 2016 · completed Apr 18, 2017 · Permit 16 156212 PLB
- Closed
Small residential project · Multiple projects
Proposal to construct a two storey rear addition, interior alteratons, and a new basement walkout and deck at the rear
Applied May 16, 2016 · issued May 24, 2016 · completed Jul 20, 2020 · Permit 16 156212 BLD
- Closed
Small residential project · Party wall admin permits
Adminstrative permit for the construction of an extension of the rear shared party wall to faciliate the construction of a partial second storey addition at rear as descibed in related permit application15 162965.
Applied May 27, 2015 · issued Jun 2, 2015 · completed Apr 16, 2021 · Permit 15 163831 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
84 Linnsmore Cres · Minor variance
To alter the existing two-storey semi-detached dwelling by enclosing the front covered porch into habitable space (mudroom), with a new landing and staircase.
220 m away · filed Sep 10, 2026 · Hearing scheduled
111 Linsmore Cres · Minor variance
210 m away · filed Aug 20, 2026 · Accepted
99 Linnsmore Cres · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, and complete third storey addition with a rear rooftop deck (above the second storey).
230 m away · filed Jun 2, 2026 · Approved
48 Queensdale Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with rear exterior stairs. The existing rear deck will be demolished.
180 m away · filed May 25, 2026 · Approved
385 Sammon Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a front one-storey addition (porch enclosure).
210 m away · filed Feb 27, 2026 · Approved
6 Kimbourne Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition (the existing rear one-storey will be demolished) with a ground floor deck and stairs. Also, to construct a new one-storey ancillary building (detached shed), in the rear yard of the property. The existing rear ancillary building (semi-detached garage) will be demolished.
230 m away · filed Sep 23, 2025 · Approved
2 Frankdale Ave · Minor variance
To construct a new three-storey detached dwelling (basement level is considered the first storey) with an integral garage, a front covered porch with stairs, a front second and third floor extended roof, and a rear second floor deck with stairs.
140 m away · filed May 12, 2025 · Approved
2 Frankdale Ave · Minor variance
To construct a new three-storey detached dwelling (basement level is considered the first storey) with an integral garage, a front covered porch with stairs, a front second and third floor extended roof, and a rear second floor deck with stairs.
140 m away · filed May 12, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.