Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

945 Pape Ave

The City of Toronto has 11 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Rev 01: Rough in 2 washroom on ground floor for future tenant use and third washroom added to basementPlumbing - Proposal to underpin and extend the front portion of the basement by 10' in the existing multiple unit building.

    Applied Mar 22, 2021 · issued Apr 15, 2021 · completed Apr 19, 2021 · Permit 17 135790 PLB (revision 01)

    Closed
  • Heating and ventilation · Other

    Revised ground floor and 2nd floor duct layout as per as built.

    Applied Feb 8, 2020 · issued Feb 13, 2020 · completed Aug 7, 2020 · Permit 16 229996 MSA (revision 02)

    Closed
  • Addition or alteration · Interior alterations

    Proposal to convert the existing third floor into a separate dwelling unit.

    Applied Feb 8, 2020 · issued May 20, 2020 · completed Feb 1, 2021 · 1 home added · Permit 20 113794 BLD

    Closed
  • Addition or alteration · Other

    Proposal to construct a fire escape at rear of mixed use building.

    Applied Sep 6, 2018 · issued Jan 25, 2019 · completed Aug 7, 2020 · Permit 18 221220 BLD

    Closed
  • Heating and ventilation · Other

    Revise HVAC layout.

    Applied Apr 4, 2018 · issued May 9, 2018 · completed Aug 7, 2020 · Permit 16 229996 MSA (revision 01)

    Closed
  • Plumbing

    Plumbing - Proposal to underpin and extend the front portion of the basement by 10' in the existing multiple unit building.

    Applied Sep 7, 2017 · issued Sep 26, 2017 · completed Apr 19, 2021 · Permit 17 135790 PLB

    Closed
  • Drains and site services

    Drain - Proposal to underpin and extend the front portion of the basement by 10' in the existing multiple unit building.

    Applied Sep 7, 2017 · issued Sep 27, 2017 · completed Aug 7, 2020 · Permit 17 135790 DRN

    Closed
  • Addition or alteration · Multiple projects

    Revision 1: Structural revision based on site conditions and removal of load bearing wall on ground floor.Applicant propose to replace the existing windows and upgrade the exterior facade

    Applied Apr 24, 2017 · issued May 16, 2017 · completed Aug 7, 2020 · Permit 16 208701 BLD (revision 01)

    Closed
  • Addition or alteration · Underpinning

    Proposal to underpin and extend the front portion of the basement by 10' in the existing multiple unit building.

    Applied Mar 29, 2017 · issued Apr 20, 2017 · completed Aug 7, 2020 · Permit 17 135790 BLD

    Closed
  • Heating and ventilation · Other

    Proposal to replace the heating system in the residential portion of the existing mixed use building

    Applied Sep 28, 2016 · issued Oct 20, 2016 · completed Aug 7, 2020 · Permit 16 229996 MSA

    Closed
  • Addition or alteration · Multiple projects

    Applicant propose to replace the existing windows and upgrade the exterior facade

    Applied Aug 17, 2016 · issued Sep 16, 2016 · completed Aug 7, 2020 · Permit 16 208701 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To convert the third floor of the existing mixed-use building into a second dwelling unit.

    Decision: Approved (hearing Jun 12, 2019)

    Filed Feb 7, 2019 · File A0115/19TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 28 East York Ave · Minor variance

    To alter the existing three-storey townhouse dwelling by constructing an extension to the rear first floor deck (cantilevered over the existing driveway and parking space, which will be maintained and unaltered).

    170 m away · filed Sep 2, 2026 · Hearing scheduled

  • 157 Westwood Ave · Minor variance

    To construct a new one-storey detached ancillary building (one-car garage), in the rear yard, abutting Carlaw Avenue. The existing detached garage will be demolished.

    210 m away · filed Jun 17, 2026 · Hearing scheduled

  • 139 Floyd Ave · Consent

    To obtain consent to sever the property into three undersized residential lots.

    190 m away · filed Feb 23, 2026 · Hearing scheduled

  • 139 Floyd Ave · Minor variance

    To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).

    190 m away · filed Feb 23, 2026 · Hearing scheduled

  • 139 Floyd Ave · Minor variance

    To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).

    190 m away · filed Feb 23, 2026 · Hearing scheduled

  • 139 Floyd Ave · Minor variance

    To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, as well as front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).

    190 m away · filed Feb 23, 2026 · Hearing scheduled

  • 193 Mortimer Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by enclosing the existing front porch into habitable space.

    200 m away · filed Feb 19, 2025 · Approved

  • 185 Gowan Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a detached ancillary building (gazebo) in the rear yard.

    200 m away · filed Oct 11, 2022 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.