Toronto address · Ward 22, Scarborough-Agincourt
95 Belinda Sq
The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Examiner's notice sent
Small residential project · Interior alterations
Proposal for removing load bearing wall in the main floor
Applied Jul 29, 2026 · Permit 26 211148 BLD
- Permit issued
Heating and ventilation
HVAC - Proposal for a 2nd floor adddition (above garage), interior alterations and a rear accessory structure to an existing SFD-detached dwelling. See also 24 235058 ZAP.
Applied Jul 21, 2025 · issued Nov 10, 2025 · Permit 25 196970 HVA
- Permit issued
Small residential project · Multiple projects
Proposal for a 2nd floor adddition (above garage), interior alterations and a rear accessory structure to an existing SFD-detached dwelling. See also 24 235058 ZAP.
Applied Jul 21, 2025 · issued Nov 10, 2025 · Permit 25 196970 BLD
- Permit issued
Plumbing
Plumbing - Proposal for a 2nd floor adddition (above garage), interior alterations and a rear accessory structure to an existing SFD-detached dwelling. See also 24 235058 ZAP.
Applied Jul 21, 2025 · issued Nov 10, 2025 · Permit 25 196970 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
138 Sandyhook Sq · Minor variance
To permit a garden suite in the rear yard.
210 m away · filed Sep 20, 2023 · Approved
62 Belinda Sq · Minor variance
To construct a two-storey rear and north-side addition to the existing dwelling.
120 m away · filed Jan 20, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.