Toronto address · Ward 12, Toronto-St. Paul's

95 College View Ave

The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Interior alterations

    Removal of walls main floor and replacement with steel beams / lintels for windows

    Applied May 24, 2021 · issued Jul 26, 2021 · Permit 21 159852 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 222 Chaplin Cres · Minor variance

    To alter the existing one-storey detached by constructing a complete second storey addition, and a front and side (east) one-storey addition (with a basement addition below). A portion of the existing driveway at the southeast corner of the lot will be reconstructed.

    230 m away · filed Sep 14, 2026 · Postponed

  • 490 Eglinton Ave W · Minor variance

    Proposed change of use of the existing gymnasium to a retail store, together with interior alterations to combine with the existing retail space at 484 Eglinton Avenue West.

    250 m away · filed Jul 24, 2026 · Approved

  • 77 College View Ave · Minor variance

    To construct a new rear one-storey ancillary building (one-car detached garage, abutting College View Avenue).

    190 m away · filed May 15, 2026 · Approved

  • 453 Eglinton Ave W · Minor variance

    To alter the existing two-storey mixed-use building by converting a portion of the basement-level storage space into two hotel units by converting the ground-level garage into one hotel unit and adding six hotel units to the second level. Also, the remaining storage space/boiler room/walk-in freezer within the basement level, as well as the existing non-residential uses (restaurant and clothing store) on the ground level, will be maintained and unaltered.

    190 m away · filed Aug 6, 2025 · Deferred

  • 221 Chaplin Cres · Minor variance

    To construct a new three-storey detached dwelling with an integral garage, a covered front porch with stairs, a rear second floor deck with stairs, and a rear basement (ground floor) walkout with a patio.

    180 m away · filed Aug 27, 2024 · Refused

  • 91 Elmsthorpe Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front two-storey addition along the north side of the attached garage, a second storey partially above the existing garage, a front covered porch, a rear one-storey addition, and front and rear second storey balconies.

    200 m away · filed Jul 26, 2024 · Approved

  • 263 Forest Hill Rd · Minor variance

    To construct a new three-storey detached dwelling with an integral garage on the upper basement level (accessed by a car lift), an indoor pool on the lower basement level, rear basement walkouts on the upper and lower basement levels, and a rear ground floor deck.

    220 m away · filed Jul 24, 2024 · Approved

  • 326 Warren Rd · Minor variance

    To construct a new three-storey detached dwelling with an above grade basement, a front porch, a front two-car integral garage, and a rear second storey deck with stairs.

    240 m away · filed Feb 6, 2024 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.