95 Grandville Ave
The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
Revision 01: second floor setback at the south side to be 0.63 meters as per committee of adjustment decisionProposal to construct a two storey rear addition, second storey addition over existing dwelling and interior alterations
Applied Nov 15, 2017 · issued Nov 23, 2017 · completed Jan 19, 2018 · Permit 17 132838 BLD (revision 01)
- Closed
Plumbing
Plumbing - Proposal to construct a two storey rear addition, second storey addition over existing dwelling and interior alterations
Applied Oct 5, 2017 · issued Oct 5, 2017 · completed Jan 19, 2018 · Permit 17 132838 PLB
- Closed
Drains and site services
Drain - Proposal to construct a two storey rear addition, second storey addition over existing dwelling and interior alterations
Applied Oct 5, 2017 · issued Oct 5, 2017 · completed Jan 22, 2018 · Permit 17 132838 DRN
- Closed
Heating and ventilation
HVAC - Proposal to construct a two storey rear addition, second storey addition over existing dwelling and interior alterations
Applied Mar 22, 2017 · issued Jun 23, 2017 · completed Jan 19, 2018 · Permit 17 132838 HVA
- Closed
Small residential project · Multiple projects
Proposal to construct a two storey rear addition, second storey addition over existing dwelling and interior alterations
Applied Mar 22, 2017 · issued Jun 23, 2017 · completed Jan 19, 2018 · Permit 17 132838 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a second storey addition above the existing dwelling, a two-storey rear addition and a new covered front porch.
Decision: Approved (hearing Aug 10, 2017)
Filed Jun 9, 2017 · File A0542/17EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
36 Chryessa Ave · Minor variance
To legalize and to maintain the existing front porch.
90 m away · filed Feb 21, 2025 · Approved
25 Beechwood Ave · Minor variance
To construct a new detached fourplex.
160 m away · filed Nov 15, 2024 · Approved
36 Gray Ave · Minor variance
To construct a new detached dwelling with an attached garage.
190 m away · filed Jul 6, 2024 · Approved
53 Chryessa Ave · Minor variance
To construct a second storey addition above the existing dwelling and a new roof over the existing front porch.
180 m away · filed Jan 13, 2021 · Approved
29 Chryessa Ave · Minor variance
To construct a new semi-detached dwelling with an attached garage.
90 m away · filed Dec 3, 2020 · Approved
29 Chryessa Ave · Consent
To obtain consent to sever the property into two residential lots.
90 m away · filed Dec 3, 2020 · Approved
29 Chryessa Ave · Minor variance
To construct a new semi-detached dwelling with an attached garage.
90 m away · filed Dec 3, 2020 · Approved
9 Beechwood Ave · Minor variance
To construct a new duplex with an attached garage.
160 m away · filed Oct 20, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.