Toronto address · Ward 9, Davenport
95 Pauline Ave
The City of Toronto has 8 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Heating and ventilation
Revision to relocate 2nd furnace to 2nd floor and layout changes.
Applied Mar 17, 2017 · issued Mar 23, 2017 · Permit 15 257560 HVA (revision 01)
- Closed
Drains and site services
Drain - Proposal for a rear/side 2 storey addition, 3rd floor addition, 2 front decks + 2 rear decks at the 2nd and 3rd floors, & interior alterations to all floors. Scope of work includes converting to 2 dwelling units.
Applied Jun 29, 2016 · issued Jul 4, 2016 · completed Dec 20, 2022 · Permit 15 257560 DRN
- Revision issued
Small residential project · Multiple projects
REVISION - changes to the foundation wall due to field conditionsProposal for a rear/side 2 storey addition, 3rd floor addition, 2 front decks + 2 rear decks at the 2nd and 3rd floors, & interior alterations to all floors. Scope of work includes converting to 2 dwelling units.
Applied May 12, 2016 · issued Jun 15, 2016 · Permit 15 257560 BLD (revision 01)
- Inspections under way
Heating and ventilation
HVAC - Proposal for a rear/side 2 storey addition, 3rd floor addition, 2 front decks + 2 rear decks at the 2nd and 3rd floors, & interior alterations to all floors. Scope of work includes converting to 2 dwelling units.
Applied Dec 4, 2015 · issued Jan 8, 2016 · Permit 15 257560 HVA
- Closed
Plumbing
Plumbing - Proposal for a rear/side 2 storey addition, 3rd floor addition, 2 front decks + 2 rear decks at the 2nd and 3rd floors, & interior alterations to all floors. Scope of work includes converting to 2 dwelling units.
Applied Nov 27, 2015 · issued Jan 14, 2016 · completed Nov 12, 2025 · Permit 15 257560 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal for a rear/side 2 storey addition, 3rd floor addition, 2 front decks + 2 rear decks at the 2nd and 3rd floors, & interior alterations to all floors. Scope of work includes converting to 2 dwelling units.
Applied Nov 27, 2015 · issued Jan 8, 2016 · 1 home added · Permit 15 257560 BLD
- Closed
Plumbing
Plumbing - demolish existing rear addition, underpinning in basement
Applied May 25, 2015 · issued Jun 5, 2015 · completed Nov 12, 2025 · Permit 15 139115 PLB
- Closed
Small residential project · Multiple projects
demolish existing rear addition, underpinning in basement
Applied Apr 10, 2015 · issued Jun 5, 2015 · completed Apr 16, 2026 · Permit 15 139115 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
1141 Bloor Street West, 90 Croatia Street and 980 Dufferin Street
22 storeys · 264 homes · Mixed use
350 m away · Site plan · Under review · filed Feb 27, 2026
- Approved
1167-1175 Bloor Street West, 34-42 Brock Crescent and 90 Croatia Street
14 storeys · 52 homes · Mixed use
370 m away · Rezoning · Approved · filed Feb 9, 2026
Neighbours’ Committee of Adjustment files within 250 m
45 Armstrong Ave · Minor variance
To alter the existing two-storey townhouse dwelling by constructing extensions to the upper and lower ground floor decks, and a new rooftop access staircase (within the attic space). Also, to permit the existing rooftop deck which was constructed without an authorized building permit. The existing rear one-storey addition (vestibule leading to the basement level) and rooftop access stairs will be demolished.
220 m away · filed May 15, 2026 · Approved
750 Brock Ave · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a complete third storey addition.
150 m away · filed Sep 12, 2025 · Approved
1081 Dufferin St · Minor variance
To construct a new one-storey detached ancillary building (two-car garage), in the rear yard of the existing two-storey detached dwelling.
220 m away · filed May 20, 2025 · Approved
428 Margueretta St · Minor variance
To convert the existing two-and-one-half-storey detached dwelling into a fourplex by constructing a front basement walkout, and new rear ground floor stairs (the existing rear ground floor deck and stairs will be demolished). There will be a total of five dwelling units on this lot (four units within the main dwelling, and one dwelling unit within the rear detached ancillary building (garden suite, approved under an authorized building permit)).
220 m away · filed Sep 25, 2024 · Approved
1064 Dufferin St · Minor variance
To alter the existing two-and-one-half-storey detached dwelling (duplex) by converting the existing rear one-storey ancillary building (detached garage) into one garden suite. There will be a total of three residential dwelling units on this lot (two units within the dwelling and one unit within the ancillary building).
220 m away · filed Jul 19, 2024 · Approved
41 Wallace Ave · Minor variance
To convert the existing three-storey detached dwelling into a fourplex by constructing a rear three-storey addition, front and rear third storey balconies, a rear second storey balcony, and a rear ground floor deck. The existing front second storey balcony will be maintained. There will be a total of four residential dwelling units on this lot.
110 m away · filed Jun 3, 2024 · Approved
1119 Dufferin St · Minor variance
To construct a new three-storey detached dwelling (triplex) with rear decks on the ground, second, and third levels, a front third storey rooftop terrace above the front cantilevered second storey portion of the dwelling, and a front landing with stairs.
200 m away · filed Mar 4, 2024 · Approved
119 Pauline Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition. The existing rear one-storey addition will be demolished.
80 m away · filed Feb 15, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.