Toronto address · Ward 1, Etobicoke North

95 Vulcan St

The City of Toronto has 13 building permits since 2017 (12 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Drain - Proposal for interior alterations to construct a raised penthouse to accomodate new equipment.

    Applied Feb 10, 2022 · issued Apr 6, 2022 · completed Jul 13, 2026 · Permit 22 113064 DRN

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to construct a raised penthouse to accomodate new equipment.

    Applied Feb 10, 2022 · issued Mar 31, 2022 · Permit 22 113064 BLD

    Inspections under way
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to replace 2 existing backflow preventers in an existing industrial processing plant.

    Applied Jun 12, 2019 · issued Nov 28, 2019 · Permit 19 170265 PSA

    Inspections under way
  • Plumbing

    Plumbing - Proposal to create new interior silo room. Scope includes removing and rebuilding part of building envelope, new interior partitions, new reinforced floor slab, roof reinforcement, sprinkler modification, new floor drains and installation of silos with service platform.

    Applied Feb 29, 2016 · issued Apr 13, 2016 · Permit 16 122039 PLB

    Inspections under way
  • Addition or alteration · Multiple projects

    Proposal to create new interior silo room. Scope includes removing and rebuilding part of building envelope, new interior partitions, new reinforced floor slab, roof reinforcement, sprinkler modification, new floor drains and installation of silos with service platform.

    Applied Feb 29, 2016 · issued Apr 13, 2016 · Permit 16 122039 BLD

    Inspections under way
  • Drains and site services · Inside and outside drains

    Drain - To remove, raise, and re-construct a section of the roof to accommodate new production equipment

    Applied Sep 23, 2015 · issued Sep 29, 2015 · Permit 15 143822 STS

    Inspections under way
  • Plumbing

    Revision 01: Revision 01: proposal to construct new garbage room enclosure (under existing roof shadow), including new floor drains connected to existing process sanitary sewer system.Plumbing is tor slab re-instatement + new floor drains rwalted to permit work. To remove, raise, and re-construct a section of the roof to accommodate new production equipment

    Applied Aug 4, 2015 · issued Aug 28, 2015 · Permit 15 143822 PLB (revision 01)

    Revision issued
  • Addition or alteration · Other

    Revision 01: proposal to construct new garbage room enclosure (under existing roof shadow), including new floor drains connected to existing process sanitary sewer system.To remove, raise, and re-construct a section of the roof to accommodate new production equipment

    Applied Aug 4, 2015 · issued Aug 14, 2015 · Permit 15 143822 BLD (revision 01)

    Revision issued
  • Plumbing

    Plumbing is tor slab re-instatement + new floor drains rwalted to permit work. To remove, raise, and re-construct a section of the roof to accommodate new production equipment

    Applied Jun 19, 2015 · issued Jul 3, 2015 · Permit 15 143822 PLB

    Inspections under way
  • Addition or alteration · Other

    To remove, raise, and re-construct a section of the roof to accommodate new production equipment

    Applied Apr 20, 2015 · issued Apr 28, 2015 · Permit 15 143822 BLD

    Inspections under way
  • Addition or alteration · Other

    Proposal to install a raised structural steel curb on existing roof sturcture to support a proposed A/H unit

    Applied May 7, 2013 · issued Jun 6, 2013 · Permit 13 164255 BLD

    Permit issued
  • Plumbing

    plumbing - Installation of a new production line and interior alterations.Sept. 11/07-revise drawings sumbitted in installation of floor drains

    Applied Sep 12, 2007 · issued Sep 14, 2007 · Permit 07 148141 PLB (revision 01)

    Revision issued
Show 1 more permit
  • Plumbing

    Plumbing - Installation of a new production line and interior alterations.

    Applied Apr 11, 2007 · issued May 25, 2007 · Permit 07 148141 PLB

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

None on file since 2017.

Everything planned in Etobicoke North

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.