Toronto address · Ward 14, Toronto-Danforth
952 Pape Ave
The City of Toronto has 1 building permit since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Garage
Proposal to construct a new rear yard private detached garage.
Applied Nov 18, 2021 · issued May 6, 2022 · completed Nov 24, 2022 · Permit 21 239279 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a one-storey ancillary structure (detached garage) in the rear yard, abutting the laneway.
Decision: Approved (hearing Apr 13, 2022)
Filed Jan 11, 2022 · File A0044/22TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
28 East York Ave · Minor variance
To alter the existing three-storey townhouse dwelling by constructing an extension to the rear first floor deck (cantilevered over the existing driveway and parking space, which will be maintained and unaltered).
210 m away · filed Sep 2, 2026 · Hearing scheduled
157 Westwood Ave · Minor variance
To construct a new one-storey detached ancillary building (one-car garage), in the rear yard, abutting Carlaw Avenue. The existing detached garage will be demolished.
180 m away · filed Jun 17, 2026 · Hearing scheduled
139 Floyd Ave · Consent
To obtain consent to sever the property into three undersized residential lots.
130 m away · filed Feb 23, 2026 · Hearing scheduled
139 Floyd Ave · Minor variance
To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).
130 m away · filed Feb 23, 2026 · Hearing scheduled
139 Floyd Ave · Minor variance
To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).
130 m away · filed Feb 23, 2026 · Hearing scheduled
139 Floyd Ave · Minor variance
To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, as well as front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).
130 m away · filed Feb 23, 2026 · Hearing scheduled
185 Gowan Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a detached ancillary building (gazebo) in the rear yard.
160 m away · filed Oct 11, 2022 · Approved
22 East York Ave · Minor variance
To construct a rear carport.
230 m away · filed Nov 8, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.