Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

96 Gough Ave

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Other

    After a structural inspection, the front wall condition requires that it be replaced in order to maintain the structural integrity of the front wall. It will require temporary shoring of the front wall

    Applied Jul 20, 2017 · issued Oct 16, 2017 · completed Oct 19, 2018 · Permit 17 201960 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 654-668 Danforth Avenue

    49 storeys · 496 homes · Mixed use

    170 m away · Site plan · Under review · filed Aug 3, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 111 Gough Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (with basement below), a third storey addition, a side (south) basement walkout, a rear ground floor covered deck with stairs, and front and rear third storey balconies There will be a total of two dwelling units on the lot (one secondary suite in the basement).

    70 m away · filed Jul 25, 2025 · Deferred

  • 23 Gough Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third storey addition with a north side balcony.

    230 m away · filed Apr 8, 2025 · Approved

  • 13 Cruikshank Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing an east side three-storey addition, a front covered porch, and a rear deck with stairs. Also, to permit a front yard parking pad and to construct a rear one-storey ancillary building (shed). The existing rear one-storey ancillary building (three-car garage) will be demolished.

    120 m away · filed Mar 10, 2025 · Approved

  • 909 Logan Ave · Minor variance

    To maintain the existing two-storey semi-detached dwelling, as well as the rear one-storey detached ancillary building (containing a one-car garage, abutting Thomas McClintock Lane).

    240 m away · filed Aug 15, 2024 · Approved

  • 911 Logan Ave · Minor variance

    To maintain the existing two-storey semi-detached dwelling, as well as the rear one-storey detached ancillary building (containing a one-car garage, abutting Thomas McClintock Lane).

    240 m away · filed Aug 15, 2024 · Approved

  • 22 Gough Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third storey addition (habitable space within the attic).

    240 m away · filed Aug 7, 2024 · Approved

  • 878 Carlaw Ave · Consent

    Section 57(1) of the Planning Act allows the assignment of authority to the Secretary-Treasurer, Committee of Adjustment or his/her designate to approve a Validation of Title.

    210 m away · filed Jun 12, 2024 · Approved

  • 643 Danforth Ave · Minor variance

    To alter the existing three-storey mixed-use building by constructing a rear one-storey addition (for additional ground floor commercial space) with a rear exit and landing. The existing dental office use will occupy the entire ground floor of this building as well as the adjacent building to the west (municipally known as 641 Danforth Avenue). The two existing residential dwelling units on the second and third storeys will be maintained and unaltered.

    190 m away · filed Mar 26, 2024 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.