Toronto address · Ward 20, Scarborough Southwest
96 Pinegrove Ave
The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposed construction of a new two storey single family dwelling with integrated garage and finished basement.
Applied Apr 29, 2019 · issued Aug 27, 2019 · completed Jul 24, 2020 · Permit 19 145360 HVA
- Closed
Drains and site services
Drain - Proposed construction of a new two storey single family dwelling with integrated garage and finished basement.
Applied Apr 26, 2019 · issued May 29, 2019 · completed Jul 31, 2020 · Permit 19 145360 DRN
- Closed
Plumbing
Plumbing - Proposed construction of a new two storey single family dwelling with integrated garage and finished basement.
Applied Apr 26, 2019 · issued May 29, 2019 · completed Jul 29, 2020 · Permit 19 145360 PLB
- Closed
New house · New building
Proposed construction of a new two storey single family dwelling with integrated garage and finished basement.
Applied Apr 26, 2019 · issued May 29, 2019 · completed Apr 10, 2025 · 1 home added · Permit 19 145360 BLD
- Closed
Demolition
Proposed demolition of a 1 1/2 storey single family dwelling.
Applied Apr 26, 2019 · issued May 29, 2019 · completed Dec 5, 2019 · 1 home removed · Permit 19 145432 DEM
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new two-storey detached dwelling.
Decision: Approved (hearing Jan 30, 2019)
Filed Dec 6, 2018 · File A0369/18SC
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
103 Pinegrove Ave · Minor variance
To construct a new three-storey dwelling with a front porch, rear deck and rear balcony. The existing garage on the lot will be demolished.
50 m away · filed Apr 24, 2025 · Deferred
103 Pinegrove Ave · Minor variance
To construct a new three-storey dwelling with a front porch, rear deck and rear balcony. The existing one-storey dwelling on the lot will be demolished.
50 m away · filed Apr 24, 2025 · Deferred
103 Pinegrove Ave · Consent
50 m away · filed Apr 24, 2025 · Application withdrawn
58 South Woodrow Blvd · Minor variance
To permit a parking space in the front yard.
70 m away · filed May 13, 2024 · Approved
17 South Edgely Ave · Minor variance
To demolish the existing dwelling and to construct a new 2-storey dwelling. This item was previously deferred at the May 1, 2024 hearing. Cross-Reference Consent Application B0043/23SC and Minor Variance Application A0242/23SC. NOTE: The consent application and the minor variance applications will be jointly considered by the Committee of Adjustment.
40 m away · filed Oct 27, 2023 · Approved
17 South Edgely Ave · Consent
To sever the property into two residential lots. This item was previously deferred at the May 1, 2024 hearing. Cross-Reference Minor Variance Applications: A0248/23SC and A0242/23SC. NOTE: The consent application and the minor variance applications will be jointly considered by the Committee of Adjustment.
40 m away · filed Oct 27, 2023 · Approved
17 South Edgely Ave · Minor variance
To demolish the existing dwelling and to construct a new 2-storey dwelling. This item was previously deferred at the May 1, 2024 hearing. Cross-Reference Consent Application B0043/23SC and Minor Variance Application A0248/23SC. NOTE: The consent application and the minor variance applications will be jointly considered by the Committee of Adjustment.
40 m away · filed Oct 27, 2023 · Approved
50 South Woodrow Blvd · Minor variance
To construct a rear addition to existing dwelling.
50 m away · filed Apr 16, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.