Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

96 St Hubert Ave

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Porch

    Proposal to replace the existing front porch with new in the existing detached single family dwelling.

    Applied Aug 30, 2022 · issued Sep 23, 2022 · completed Jan 23, 2026 · Permit 22 197792 BLD

    Closed
  • Drains and site services · Back water valve (Sewer only)

    bwv installation

    Applied Jul 6, 2022 · issued Jul 13, 2022 · completed Jul 19, 2022 · Permit 22 173022 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 63 St Hubert Ave · Minor variance

    To construct a new three-storey detached dwelling (basement level is considered the first level) with an integral garage, a front porch, a rear second storey covered deck, and a rear basement walkout. There will be a total of two residential dwelling units on this lot (one unit within the basement (first) level and one unit occupying the second and third levels).

    180 m away · filed Feb 12, 2026 · Approved

  • 1128 Greenwood Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition (which will be cantilevered on the south side), a front ground floor porch with stairs, and a rear basement walkout. There will be one parking space along the south side of the dwelling.

    190 m away · filed Sep 18, 2025 · Approved

  • 346 O'Connor Dr · Minor variance

    To construct a new one-storey ancillary building (two-car garage), in the rear yard, abutting Cadorna Avenue.

    120 m away · filed Sep 17, 2025 · Hearing scheduled

  • 364 O'Connor Dr · Minor variance

    To permit a vehicle washing establishment use (other than using automatic, coin-operated or ride-through car washing establishments or facilities) within the one-storey detached building containing the existing Automotive Service Centre.

    150 m away · filed Jul 23, 2025 · Approved

  • 105 St Hubert Ave · Minor variance

    To construct a new two-storey detached dwelling with an integral garage, a front mezzanine living area above integral garage, a front covered porch with stairs and canopy, a rear first floor deck with stairs, a rear basement walkout and a front and rear second floor balcony. The existing rear detached garage will be demolished.

    60 m away · filed Jun 23, 2025 · Approved

  • 10 Plains Rd · Minor variance

    To construct a new two-storey detached dwelling (duplex) with a basement walkout. Also, to construct a one-storey ancillary building (garage) in the rear yard. There will be a total of two residential dwelling units on this lot.

    170 m away · filed Aug 23, 2024 · Approved

  • 104 Cadorna Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a rear first storey addition with a deck, a complete second storey addition, and a front porch.

    90 m away · filed May 22, 2024 · Approved

  • 19 Davies Cres · Minor variance

    To construct a new two-storey detached dwelling with an integral garage, a front porch with stairs, a rear ground floor covered deck with stairs, and a rear basement walkout with a patio.

    220 m away · filed Feb 13, 2024 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.