Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

963 Dufferin St

The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Garage

    Proposed renovation and addition to the existing detached garage.

    Applied Apr 22, 2026 · completed Apr 28, 2026 · Permit 26 148055 BLD

    Cancelled
  • Plumbing

    Plumbing - Proposed load bearing wall removal and Interior alterations

    Applied Jun 19, 2025 · issued Jun 26, 2025 · completed Jan 13, 2026 · Permit 25 180449 PLB

    Closed
  • Small residential project · Interior alterations

    Proposed load bearing wall removal and Interior alterations

    Applied Jun 19, 2025 · issued Jun 26, 2025 · completed Jan 13, 2026 · Permit 25 180449 BLD

    Closed
  • Small residential project · Party wall admin permits

    Party wall admin permits for construction work at 965 Dufferin Street

    Applied Nov 4, 2020 · issued Nov 4, 2020 · completed May 26, 2023 · Permit 20 214788 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a new one-storey detached ancillary building (two-car garage with two undersized parking spaces with a storage/workshop space) in the rear yard, abutting the laneway. The existing rear one-storey detached ancillary building (one-car garage) in the rear yard will be demolished.

    Decision: Approved (hearing Jul 15, 2026)

    Filed Jun 3, 2026 · File A0416/26TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 529 Gladstone Ave · Minor variance

    To construct a new three-storey detached building (houseplex) with a front basement walkout, a front porch with stairs, three side (south) covered entrances with stairs, a rear entrance with stairs, and front and rear third storey balconies. Also, to construct a new rear two-storey detached ancillary building (containing one garden suite) with a corner (northeast) patio. There will be a total of seven residential dwelling units on this lot (six dwelling units within the main building, and one dwelling unit within the ancillary building).

    160 m away · filed Jun 29, 2026 · Approved

  • 991 Dufferin St · Minor variance

    To construct a new rear one-storey detached ancillary building (garage containing one parking space and storage) and driveway in the rear yard, abutting the laneway.

    60 m away · filed Jun 3, 2026 · Approved

  • 999 Dufferin St · Minor variance

    To construct a new three-storey detached residential building containing six dwelling units (sixplex), with front and rear basement walkouts, front and rear ground floor porches with stairs, front second and third storey balconies, a rear second storey balcony, and a rooftop patio accessed by two rooftop stair enclosures. The existing rear detached garage, abutting the lane, will be demolished.

    100 m away · filed Dec 16, 2025 · Approved

  • 991 Dufferin St · Minor variance

    To construct a new three-storey detached dwelling with a front porch, a front third level balcony, a rear ground level deck, a rear basement walkout, and a rear third level deck.

    60 m away · filed Jul 22, 2025 · Approved

  • 1141 Bloor St W · Consent

    To obtain consent to sever portions of the land (above and below-grade strata) and to create new easements/rights-of-way.

    180 m away · filed Oct 22, 2024 · Approved

  • 1141 Bloor St W · Minor variance

    To alter the development standards for Block A and Block B (containing Buildings A, B1, & B2, approved for 11, 34 and 37 storeys respectively) of the mixed-use redevelopment approved under Site Specific Zoning By-Law 700-2021 (OLT) by increasing the building height and number of dwelling units provided within mixed-use buildings A, B1 and B2. Also, to permit the reduction of parking spaces provided. There will be a total of 284 residential dwelling units within Block A and 859 residential dwelling units within Block B provided. This is currently under review by Site Plan Control Applications…

    180 m away · filed May 16, 2024 · Approved

  • 977 Dufferin St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear three-storey addition, a rear basement walkout, and a rear ground floor deck. Also, to construct a new two-storey detached ancillary building (containing an integral garage and one laneway suite on the cantilevered second storey) in the rear yard, abutting the laneway. There will be a total of six residential dwelling units on this lot (five dwelling units within the main house and one dwelling unit (laneway suite) within the ancillary building).

    20 m away · filed Mar 1, 2024 · Approved

  • 977 Dufferin St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a three-storey rear addition with a rear ground floor concrete deck and stairs, a rear basement walkout, as well as a new cold room underneath the existing front porch. Also, to construct a new two-storey detached ancillary building (containing a garage and one laneway suite), in the rear yard, abutting the laneway. The existing garage in the rear yard will be demolished. There will be a total of 6 residential units (one primary and four secondary suites within the main building, and one laneway suite within the a…

    20 m away · filed Nov 21, 2023 · Refused

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.