Toronto address · Ward 9, Davenport
967 College St
The City of Toronto has 15 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Addition or alteration · Interior alterations
Proposal for Interior Alterations to second floor to create a Yoga Studio to the existing Fitness Centre.
Applied Aug 20, 2021 · issued Aug 27, 2021 · completed May 16, 2022 · Permit 21 201777 BLD
- Closed
Heating and ventilation
HVAC - Proposal for Interior Alterations to second floor to create a Yoga Studio to the existing Fitness Centre.
Applied Aug 20, 2021 · issued Aug 27, 2021 · completed Jan 4, 2022 · Permit 21 201777 HVA
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to the basement and ground floors of an existing commercial building.
Applied Aug 16, 2021 · issued Sep 14, 2021 · completed Nov 10, 2025 · Permit 21 199109 BLD
- Closed
Addition or alteration · Interior alterations
Rev 1: Enterance door swing reversed and vestibule removedProposal for existing lounge space on the first floor to be converted to a small cafe serving beverages and baked goods.
Applied Nov 2, 2020 · issued Nov 13, 2020 · completed May 13, 2022 · Permit 19 229135 BLD (revision 01)
- Closed
Addition or alteration · Interior alterations
Proposal for existing lounge space on the first floor to be converted to a small cafe serving beverages and baked goods.
Applied Sep 30, 2019 · issued Oct 8, 2019 · completed May 13, 2022 · Permit 19 229135 BLD
- Inspections under way
Plumbing
Plumbing - Proposal for interior alterations to create a yoga studio in an existing lobby on the ground floor.
Applied Dec 19, 2017 · issued Mar 23, 2018 · Permit 17 277184 PLB
- Inspections under way
Heating and ventilation
HVAC - Proposal for interior alterations to create a yoga studio in an existing lobby on the ground floor.
Applied Dec 19, 2017 · issued Mar 23, 2018 · Permit 17 277184 HVA
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to create a yoga studio in an existing lobby on the ground floor.
Applied Dec 19, 2017 · issued Mar 23, 2018 · completed Nov 6, 2025 · Permit 17 277184 BLD
- Closed
Heating and ventilation
REVISION 1 - to add rooms and alter interior partition wallsHVAC - Permit to convert rear portin of ground floor and full second floor of existing plumbing store to new Yoga Studio. - YOST.
Applied Dec 21, 2016 · issued Jan 16, 2017 · completed Sep 7, 2017 · Permit 10 226791 HVA (revision 01)
- Closed
Addition or alteration · Interior alterations
REVISION 2 - to add rooms and alter interior partition wallsRevision to convert the front portion of ground floor unit to a restaurant/cafe greater than 30 seats.Ground floor and second floor Yoga Studio - YOST under original permit .Sprinkler System permit must be applied for.
Applied Dec 21, 2016 · issued Feb 10, 2017 · completed Sep 11, 2017 · Permit 10 226791 BLD (revision 02)
- Closed
Plumbing
REVISION 1 - to add rooms and alter interior partition wallsPlumbing - Permit to convert the ground floor and second floor to new a Yoga Studio - YOST.Sprinkler System permit must be applied for.
Applied Dec 21, 2016 · issued Feb 7, 2017 · completed Jul 11, 2017 · Permit 10 226791 PLB (revision 01)
- Closed
Addition or alteration · Interior alterations
Revision to convert the front portion of ground floor unit to a restaurant/cafe greater than 30 seats.Ground floor and second floor Yoga Studio - YOST under original permit .Sprinkler System permit must be applied for.
Applied Nov 15, 2010 · issued Dec 23, 2010 · completed Sep 11, 2017 · Permit 10 226791 BLD (revision 01)
Show 3 more permits
- Closed
Plumbing
Plumbing - Permit to convert the ground floor and second floor to new a Yoga Studio - YOST.Sprinkler System permit must be applied for.
Applied Sep 22, 2010 · issued Sep 22, 2010 · completed Jul 11, 2017 · Permit 10 226791 PLB
- Closed
Heating and ventilation
HVAC - Permit to convert rear portin of ground floor and full second floor of existing plumbing store to new Yoga Studio. - YOST.
Applied Jul 22, 2010 · issued Sep 22, 2010 · completed Sep 7, 2017 · Permit 10 226791 HVA
- Closed
Addition or alteration · Interior alterations
Permit to convert the ground floor and second floor to new a Yoga Studio - YOST.Sprinkler System permit must be applied for.
Applied Jul 22, 2010 · issued Sep 22, 2010 · completed Sep 11, 2017 · Permit 10 226791 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
6 storeys · 19 homes · Residential
90 m away · Site plan · Approved · filed Jul 10, 2025
- Under review
- Under appeal
Neighbours’ Committee of Adjustment files within 250 m
894 College St · Minor variance
To alter the existing three-storey mixed-used builiding by constructing a rear three-storey addition. Also, to construct a mechanical room and stairwells on the roof.
160 m away · filed Sep 4, 2026 · Postponed
353 Dovercourt Rd · Minor variance
To construct a new rear one-storey ancillary building (attached garage connecting to the two-storey semi-detached dwelling (houseplex)) with an existing driveway, abutting Churchill Avenue. There will be a total of two residential dwelling units on this lot (one unit occupying the basement level, and one unit occupying the first and second levels).
250 m away · filed Jul 16, 2026 · Tentatively scheduled
155 Rusholme Rd · Minor variance
To construct a new two-storey detached ancillary building (containing a ground floor garage with one parking space, two bicycle parking spaces and a second storey laneway suite) cantilevered on the west side with a rear second storey balcony in the rear yard, abutting the laneway. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling, and one unit within the ancillary building).
250 m away · filed Jul 8, 2026 · Approved
976 College St · Minor variance
To construct a new six-storey apartment building with a rooftop terrace (a portion to be covered) on the sixth level, and a mechanical penthouse. There will be a total of 19 affordable housing units, and an office space for on-site staff to support tenants. No vehicle parking spaces will be provided on-site. A Site Plan Control application (File Number 20 25 191902 STE 09 SA) is currently under review by City staff.
80 m away · filed Jul 3, 2025 · Approved
63 Shannon St · Minor variance
To alter the existing two-storey detached dwelling by constructing a front second storey addition (above the existing one-storey) with a balcony, a complete third storey addition with a rear balcony, and a rear ground floor deck. Also, there will be a total of two residential dwelling units on this lot (one primary unit, and one secondary suite (located within the basement)).
180 m away · filed Sep 26, 2024 · Approved
30 Delaware Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling (duplex) by constructing one-storey additions to the south side and rear, and a rear third storey partial addition with a basement walkout, a patio, a second storey deck with staircase, and a third storey roof deck.
220 m away · filed Mar 22, 2024 · Approved
466 Dovercourt Rd · Minor variance
To alter the development standards (as approved by Site Specific Zoning By-law 31-2021), for a seven-storey mixed-use building that has varying heights by increasing the residential gross floor area and the height of the building. Also, to reduce the mechanical penthouse area setback, the number of vehicular parking spaces, and the number of loading spaces. There will be a total of 40 dwelling units on the lot.
90 m away · filed Nov 16, 2023 · Approved
30 Delaware Ave · Consent
To obtain consent to sever a portion of land for the purpose of a lot addition.
220 m away · filed Aug 3, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.