Toronto address · Ward 4, Parkdale-High Park
97 Ritchie Ave
The City of Toronto has 3 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Multiple projects
Proposed interior alterations for basement interior partitions demolition, main floor josits sistering, and 2nd floor bathroom re-modelling (5.0 sq.m)
Applied Feb 10, 2025 · issued Feb 13, 2025 · Permit 25 115179 BLD
- Closed
Plumbing
Plumbing - Proposed interior alterations for basement interior partitions demolition, main floor josits sistering, and 2nd floor bathroom re-modelling (5.0 sq.m)
Applied Feb 10, 2025 · issued Feb 13, 2025 · completed Jul 10, 2025 · Permit 25 115179 PLB
- Inspections under way
Small residential project · Party wall admin permits
Party Wall Admin permit in conjunction with permit at 95 Ritchie Ave #16-157946
Applied Jul 4, 2016 · issued Jul 13, 2016 · Permit 16 184323 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
11 storeys · Non-residential
180 m away · Site plan · Under review · filed Aug 15, 2022
- Under review
31 storeys · 388 homes · Mixed use
210 m away · Site plan · Under review · filed May 30, 2024
- Approved
18 storeys · 262 homes · Residential
210 m away · Site plan · Approved · filed Oct 15, 2021
- Under review
11 storeys · 130 homes · Mixed use
230 m away · Condominium · Under review · filed Nov 8, 2021
- Under review
13 storeys · Mixed use
240 m away · Site plan · Under review · filed Apr 22, 2022
- Under review
2252-2290 Dundas Street West and 105 Ritchie Avenue
2,312 homes · Mixed use
280 m away · Site plan · Under review · filed Aug 9, 2022
Neighbours’ Committee of Adjustment files within 250 m
2280 Dundas St W · Minor variance
Addition and change to the design of the transformer vault, as per Toronto Hydro's request.
160 m away · filed Sep 18, 2026 · Postponed
2112 Dundas St W · Minor variance
To alter the existing three-storey mixed-use building (containing three commercial units at grade and four residential dwelling units above) by constructing rear second and third storey additions (with three second storey rooftop terraces and three third storey balconies) above the rear one-storey portion of the building to accommodate an additional nine residential dwelling units. One existing commercial unit will be converted into two commercial units, and one existing residential dwelling unit (located on the third storey) will be converted into three residential dwelling units. There will…
170 m away · filed Oct 31, 2025 · Approved
2135 Dundas St W · Minor variance
To permit a Beverage Manufacturing Use (brew on premises) on this site. Also, to alter the existing one-storey building by constructing a basement cave structure, a walk-in fridge, and storage areas, as well as a ground floor bar, and a dine-in restaurant. There will be an access door between the buildings municipally known as 2135 Dundas Street West and 2125 Dundas Street West (Bandit Brewery).
200 m away · filed Aug 27, 2025 · Approved
230 Sterling Rd · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a rear two-storey addition. The existing rear basement walkout stairs, rear ground floor concrete pad, and a portion of the rear ground floor deck will be demolished.
230 m away · filed Aug 1, 2024 · Approved
72 Perth Ave · Minor variance
To alter the development standards for a new rental building (approved under Site Specific Zoning By-law 182-2022, as amended by City Wide By-law 569-2013, and Minor Variance Decision A0892/22TEY) by increasing the building height from 11 to 16 storeys, reducing the ground floor height, increasing the residential density, increasing the number of residential units from 128 to 211 units, amending the building setbacks/stepbacks and reducing the loading space provisions on site. The existing vacant two-story building (previously used as a place of worship) will be demolished.
200 m away · filed Feb 23, 2024 · Approved
59 Perth Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a partial third storey addition (within the attic), a rear two-storey addition with a second storey balcony and a rooftop deck (accessed from the third storey). There will be two residential dwelling units on this lot.
220 m away · filed Jan 8, 2024 · Approved
150 Sterling Rd · Minor variance
To facilitate the redevelopment of this site for a new 14-storey mixed-use building with 181 residential dwelling units, ground level retail space, a child care facility, and underground parking.
210 m away · filed Jan 31, 2023 · Approved
2210 Dundas St W · Minor variance
To permit the rear second storey addition with a rear raised deck to the existing two-storey mixed-use building (with one commercial unit and one residential unit on the ground floor, and two residential units on the second level), that were constructed without an authorized building permit.
220 m away · filed Dec 9, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.