Toronto address · Ward 12, Toronto-St. Paul's
98 Alcina Ave
The City of Toronto has 6 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Application acceptable
New house · New building
REVISION 01: Remove the existing garage and replace with parking surface. Proposed a New Single Family Dwelling Three Storey Detached House. with rear patio and covered front porch. Proposal also includes a detached garage at the rear yard. Existing house will be demolished.
Applied Jul 31, 2026 · Permit 23 211767 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposed a New Single Family Dwelling Three Storey Detached House. with rear patio and covered front porch. Proposal also includes a detached garage at the rear yard. Existing house will be demolished.
Applied Feb 13, 2024 · issued Feb 16, 2024 · completed Sep 22, 2025 · Permit 23 211767 HVA
- Inspections under way
New house · New building
Proposed a New Single Family Dwelling Three Storey Detached House. with rear patio and covered front porch. Proposal also includes a detached garage at the rear yard. Existing house will be demolished.
Applied Oct 6, 2023 · issued Nov 7, 2023 · 1 home added · Permit 23 211767 BLD
- Closed
Plumbing
Plumbing - Proposed a New Single Family Dwelling Three Storey Detached House. with rear patio and covered front porch. Proposal also includes a detached garage at the rear yard. Existing house will be demolished.
Applied Oct 6, 2023 · issued Nov 7, 2023 · completed Sep 22, 2025 · Permit 23 211767 PLB
- Closed
Demolition
Existing house will be demolished.
Applied Oct 6, 2023 · issued Nov 13, 2023 · completed Sep 22, 2025 · 1 home removed · Permit 23 211790 DEM
- Closed
Drains and site services
Drain - Proposed a New Single Family Dwelling Three Storey Detached House. with rear patio and covered front porch. Proposal also includes a detached garage at the rear yard. Existing house will be demolished.
Applied Oct 6, 2023 · issued Nov 7, 2023 · completed Sep 22, 2025 · Permit 23 211767 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new three-storey detached dwelling with a front covered porch and a rear third storey deck. Also, to construct a one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.
Decision: Approved (hearing Aug 30, 2023)
Filed Jun 29, 2023 · File A0583/23TEY
What’s planned nearby
Development sites within 500 m
- Under review
3 storeys · Residential
250 m away · Site plan · Under review · filed Dec 6, 2021
- Under review
35 storeys · 380 homes · Mixed use
420 m away · Site plan · Under review · filed Aug 23, 2022
- Approved
34 storeys · 440 homes · Mixed use
480 m away · Site plan · Approved · filed Apr 11, 2022
- Under review
28 storeys · 210 homes · Residential
490 m away · Condominium · Under review · filed Nov 1, 2021
Neighbours’ Committee of Adjustment files within 250 m
43 Hocken Ave · Minor variance
230 m away · filed Aug 7, 2026 · Postponed
18 Wychwood Pk · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition at the southwest portion of the dwelling. The existing rear ground floor concrete patio with stairs will be maintained and unaltered.
220 m away · filed May 25, 2026 · Approved
97 Alcina Ave · Minor variance
To construct a new two-storey detached ancillary building (two-car garage with one garden suite above) in the front yard, abutting Alcina Avenue. The existing two-storey detached dwelling will be maintained and unaltered. There will be a total of two residential dwelling units on this lot (one unit within the main building and one unit within the ancillary building).
50 m away · filed Aug 29, 2025 · Approved
569 Christie St · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-Law 1104-2023) for a 12-unit stacked-townhouse development which is currently being proposed for a new three-storey apartment building (16-unit stacked townhouse development) with an underground parking garage level, a rear exterior basement (underground garage) staircase with railings, ground level staircases and walkways on all sides of the building, rooftop terraces accessed by staircase enclosures with green roofs, as well as increasing the maximum gross floor area, reducing the required landscape areas, number…
230 m away · filed Jun 4, 2025 · Approved
62 Hocken Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a partial third storey addition with a rooftop deck (above the existing second storey), a front porch with stairs, and a rear two-storey addition with a ground floor deck and patio. The existing rear ground floor deck will be demolished.
210 m away · filed May 8, 2025 · Approved
14 Wychwood Pk · Minor variance
To alter the existing two-storey detached dwelling by installing a rear bay window with canopy, and to reconstruct the rear deck.
220 m away · filed Apr 7, 2025 · Approved
48 Alcina Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing second and third storey additions.
160 m away · filed Oct 24, 2024 · Approved
90 Alcina Ave · Minor variance
To construct a one-storey ancillary building (two-car garage) at the rear of the existing two-and-one-half-storey semi-detached dwelling, abutting a laneway.
30 m away · filed Aug 29, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.