Toronto address · Ward 20, Scarborough Southwest
98 Huntington Ave
The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation · Boiler/Furnace: SFD/Semi/TH
new furnace
Applied Sep 30, 2009 · issued Nov 16, 2010 · Permit 09 174424 MSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
80 Huntington Ave · Minor variance
To construct a new two-storey duplex. The existing one-storey dwelling will be demolished.
130 m away · filed Aug 13, 2026 · Hearing scheduled
70 Commonwealth Ave · Minor variance
To construct a new two-storey detached dwelling. The existing one-storey dwelling will be demolished.
220 m away · filed May 1, 2026 · Approved
79 Winter Ave · Minor variance
To permit a new vehicle dealership use within the existing building by converting a portion of the existing vehicle service shop area. There will be no exterior alterations.
210 m away · filed Aug 19, 2025 · Approved
64 Commonwealth Ave · Minor variance
To permit rear and side yard hard landscaping. There will be no alterations to the existing two-storey dwelling.
250 m away · filed Aug 15, 2025 · Approved
91 Commonwealth Ave · Minor variance
To permit and maintain the existing detached shed in the rear yard of the lot containing the existing one-storey detached dwelling. Cross-reference previous Minor Variance Application A0280/23SC.
100 m away · filed Jun 24, 2025 · Approved
56 Falmouth Ave · Minor variance
To permit and maintain the existing undersized tandem parking space in the side yard of the lot (abutting Brussels Road) containing a proposed Multi-tenant House. NOTE: This item was previously rescheduled from the Committee of Adjustment hearing on December 4, 2024 hearing, and deferred at the Committee of Adjustment hearing on January 16, 2025.
210 m away · filed Oct 16, 2024 · Approved
799 Midland Ave · Minor variance
To demolish the existing single detached dwelling and construct a two-storey fourplex.
170 m away · filed Mar 4, 2024 · Deferred
91 Commonwealth Ave · Minor variance
To construct a single-storey rear yard addition to the existing single-storey detached dwelling.
100 m away · filed Dec 21, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.