Toronto address · Ward 11, University-Rosedale
98 Sussex Ave
The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Small residential project · Party wall admin permits
Proposal for party wall admin permit related to 23 202256 BLD 00 SR, 100 Sussex Ave
Applied Sep 22, 2023 · issued Sep 27, 2023 · Permit 23 205946 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
30 storeys · 472 homes · Mixed use
300 m away · Site plan · Under review · filed Oct 12, 2022
- Under review
334-350 Bloor Street West and 2-6 Spadina Road
36 storeys · 431 homes · Mixed use
370 m away · Site plan · Under review · filed Apr 27, 2022
- Under review
37 storeys · 366 homes · Mixed use
440 m away · Site plan · Under review · filed Dec 7, 2021
- Under appeal
Not stated in the file
460 m away · Rezoning · Under appeal · filed Dec 2, 2025
- Under review
11 storeys · 64 homes · Residential
460 m away · Site plan · Under review · filed Oct 17, 2025
Neighbours’ Committee of Adjustment files within 250 m
250 Robert St · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a new covered front porch, a rear one and two storey addition (with a basement addition below) at the northwest corner of the dwelling, and a rear third storey addition. Also to construct a rear one-storey ancillary building (shed). The existing rear parking space abutting Barbara Godard Lane will be reduced in length.
200 m away · filed Aug 28, 2026 · Postponed
511 Bloor St W · Minor variance
To permit the existing partially covered outdoor patio (abutting Borden Street), for the use of the eating establishment within the existing two-and-one-half-storey mixed-use building.
210 m away · filed Jul 16, 2026 · Hearing scheduled
225 1/2 Borden St · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a front covered porch with stairs.
50 m away · filed Jan 12, 2026 · Approved
240 Major St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear second storey addition with a balcony above the existing rear one-storey portion of the dwelling. Also, to permit the existing habitable space within the attic, which was converted without an authorized building permit.
130 m away · filed Jan 7, 2026 · Approved
256 Major St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a new covered front porch, a second storey addition with a ground floor deck, and a third storey addition with a rear balcony (above the second floor). The existing front porch and front second floor balcony will be demolished.
130 m away · filed Sep 16, 2024 · Application withdrawn
374 Lippincott St · Minor variance
To construct a new two-storey ancillary building (containing a one car garage on the ground level, storage use on the second level, and a front cantilevered green roof) in the rear yard, abutting the laneway. There will be a total of one residential dwelling unit (within the main house) on this lot.
240 m away · filed May 30, 2024 · Approved
269 Brunswick Ave · Minor variance
To construct a new three-storey detached dwelling (fourplex) with a front ground floor porch, as well as front and rear third storey balconies. Also, to construct a new two-storey ancillary building (containing one laneway suite on both levels), in the rear yard, abutting the laneway. There will be a total of 5 residential dwelling units on this lot.
130 m away · filed Mar 25, 2024 · Approved
273 Major St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a side (south) ground floor addition.
220 m away · filed Dec 11, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.