Toronto address · Ward 7, Humber River-Black Creek
98 Wallasey Ave
The City of Toronto has 5 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
New house · New building
Proposal to demolish and construct a new two storey single family dwelling with integral garage and finished basement
Applied Feb 5, 2020 · issued Feb 27, 2020 · 1 home added · Permit 20 112395 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposal to demolish and construct a new two storey single family dwelling with integral garage and finished basement
Applied Feb 5, 2020 · issued Feb 28, 2020 · Permit 20 112395 HVA
- Inspections under way
Plumbing
Plumbing - Proposal to demolish and construct a new two storey single family dwelling with integral garage and finished basement
Applied Feb 5, 2020 · issued Feb 27, 2020 · Permit 20 112395 PLB
- Inspections under way
Drains and site services
Drain - Proposal to demolish and construct a new two storey single family dwelling with integral garage and finished basement
Applied Feb 5, 2020 · issued Feb 27, 2020 · Permit 20 112395 DRN
- Closed
Demolition
Proposal to demolish and construct a new two storey single family dwelling with integral garage and finished basement
Applied Feb 5, 2020 · issued Mar 2, 2020 · completed May 22, 2020 · 1 home removed · Permit 20 112405 DEM
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new detached dwelling with an attached garage.
Decision: Approved (hearing Dec 5, 2019)
Filed Oct 30, 2019 · File A0559/19EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
19 Melody Rd · Minor variance
To maintain the existing detached dwelling.
180 m away · filed Dec 17, 2025 · Approved
19 Melody Rd · Consent
To obtain consent to sever the lot into two undersized residential lots and to construct a new detached dwelling with an attached garage on Part 2 and to maintain the existing dwelling on Part 1.
180 m away · filed Dec 17, 2025 · Approved
19 Melody Rd · Minor variance
To construct a new detached dwelling with an attached garage.
180 m away · filed Dec 17, 2025 · Approved
79 Wallasey Ave · Minor variance
To legalize and to maintain the ancillary structure (shed and cabana) in the rear yard.
140 m away · filed Sep 29, 2025 · Approved
96 Wallasey Ave · Minor variance
To construct a second storey addition above the existing dwelling, two-storey rear and west side additions, an attached garage at the front, a covered front porch, and a covered deck in the rear yard. The existing detached garage in the rear yard will be attached to the main dwelling and will be converted to living space. This will be considered a new dwelling.
10 m away · filed Oct 31, 2024 · Approved
17 Melody Rd · Minor variance
To construct a two-storey rear addition which will include an attached garage along the west side of the dwelling and a new covered front porch. The existing detached garage located at the rear of the dwelling will be demolished.
170 m away · filed May 12, 2022 · Approved
79 Wallasey Ave · Minor variance
To construct a second storey addition above the existing dwelling, an attached garage and a new front porch.
140 m away · filed Nov 22, 2018 · Approved
103 Gaydon Ave · Minor variance
To construct a second storey front addition, a two-storey rear addition and a new rear deck
100 m away · filed Sep 18, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.