Toronto address · Ward 12, Toronto-St. Paul's
98 Walmsley Blvd
The City of Toronto has 3 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Interior alterations
Proposed demolition of ground floor load bearing walls and install new framing
Applied Jun 18, 2026 · issued Jun 19, 2026 · Permit 26 187101 BLD
- Closed
Plumbing
Plumbing - Proposal for basement finishing and underpinning in existing detached single family dwelling.
Applied Mar 29, 2017 · issued Mar 29, 2017 · completed May 23, 2018 · Permit 17 105116 PLB
- Closed
Small residential project · Multiple projects
Proposal for basement finishing and underpinning in existing detached single family dwelling.
Applied Jan 16, 2017 · issued Jan 18, 2017 · completed May 23, 2018 · Permit 17 105116 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
43 storeys · 706 homes · Residential
350 m away · Site plan · Under review · filed Feb 25, 2025
- Approved
10 homes · Residential
370 m away · Condominium · Approved · filed Oct 8, 2021
Neighbours’ Committee of Adjustment files within 250 m
57 Gormley Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a new front porch and a partial rear two-storey addition (with a rear second storey balcony). Also, to demolish a portion of the partial third storey.
180 m away · filed Sep 15, 2026 · Postponed
85 Gormley Ave · Consent
150 m away · filed Feb 18, 2026 · Application withdrawn
85 Gormley Ave · Minor variance
To alter the existing three-storey detached dwelling (basement level is considered the first storey) by constructing a three-storey east side addition with a seven-car integral garage (four spaces on the basement level, and three spaces on the main level), a rear widened ground floor deck with stairs, a rear second floor covered balcony, and a new widened driveway. The existing driveway will be replaced with sod.
150 m away · filed Feb 18, 2026 · Refused
63 Walmsley Blvd · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing side (east and west) third storey additions, a rear two-storey addition (including a basement extension) with a rear covered ground level deck and stairs, a rear basement walkout, and a rear third storey rooftop deck.
110 m away · filed Dec 4, 2025 · Approved
53 Oriole Pkwy · Minor variance
To construct a new three-storey detached dwelling with a rear (east) yard ground floor deck with stairs and accessible lift, a side (north) yard porch with stairs, a side (north) yard basement walkout, and an integral garage with a new driveway, abutting Wilberton Road. The existing driveway and detached garage, abutting Wilberton Road will be maintained and unaltered.
250 m away · filed Aug 8, 2025 · Approved
12 Walmsley Blvd · Minor variance
To construct a new two-storey detached dwelling with an integral garage, a front porch and stairs, a rear ground floor deck and staircase, and a rear basement walkout.
230 m away · filed Sep 17, 2024 · Approved
200 Lonsdale Rd · Minor variance
To construct a new two-storey building (private academic institution) fronting Forest Hill Road, with an enclosed pedestrian walkway connecting to the south-abutting building (private academic institution) fronting Lonsdale Road, and an underground parking garage with 13 undersized parking spaces.
160 m away · filed Aug 7, 2024 · Approved
33 Wilberton Rd · Minor variance
To construct a new one-storey detached ancillary building (to contain a one-car garage and a pool cabana), and a new in-ground swimming pool. The existing ancillary structures (detached shed and pergola) will be demolished.
240 m away · filed Feb 22, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.