Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

99 Baycrest Ave

The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Revision to a two unit system --- HVAC - Proposed second storey addition (144.55) to existing one storey single family deatched dwelling with interior alterations to existing main floor (116.44)

    Applied Jul 5, 2016 · issued Jul 14, 2016 · Permit 15 124921 HVA (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Proposed second storey addition (144.55) to existing one storey single family deatched dwelling with interior alterations to existing main floor (116.44)

    Applied Mar 24, 2015 · issued Apr 27, 2015 · Permit 15 124921 HVA

    Inspections under way
  • Small residential project · Addition(s)

    Proposed second storey addition (144.55) to existing one storey single family deatched dwelling with interior alterations to existing main floor (116.44)

    Applied Mar 6, 2015 · issued Apr 9, 2015 · Permit 15 124921 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposed second storey addition () to existing one storey single family deatched dwelling with interior alterations to existing main floor (140m2)

    Applied Mar 6, 2015 · issued Apr 9, 2015 · Permit 15 124921 PLB

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 105 Regina Ave · Minor variance

    Proposal to construct a new dwelling.

    210 m away · filed Mar 21, 2025 · Approved

  • 80 Sultana Ave · Minor variance

    To construct a new fourplex dwelling. Note: This application was previously deferred at the Committee of Adjustment hearing on May 1, 2025.

    230 m away · filed Mar 4, 2025 · Approved

  • 75 Baycrest Ave · Minor variance

    Proposal to construct a new dwelling.

    220 m away · filed Oct 6, 2022 · Approved

  • 140 Regina Ave · Minor variance

    Proposal to construct a new dwelling.

    240 m away · filed Jun 17, 2022 · Approved

  • 141 Sultana Ave · Minor variance

    To construct a new one (1) storey side yard addition to the existing dwelling along with interior and exterior alterations.

    200 m away · filed Jun 27, 2021 · Approved

  • 121 Regina Ave · Minor variance

    To construct a new dwelling.

    210 m away · filed Feb 24, 2021 · Approved

  • 125 Regina Ave · Minor variance

    To construct a new dwelling.

    220 m away · filed Sep 14, 2020 · Approved

  • 94 Regina Ave · Minor variance

    To construct a two storey and a one storey rear addition.

    200 m away · filed Aug 13, 2020 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.