Toronto address · Ward 14, Toronto-Danforth
99 Hazelwood Ave
The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Small residential project · Interior alterations
Renovations to second-floor bathroom; new skylight
Applied May 15, 2006 · issued May 15, 2006 · Permit 06 135434 BLD
- Permit issued
Plumbing
Plumbing - Renovations to second-floor bathroom; new skylight
Applied May 15, 2006 · issued May 15, 2006 · Permit 06 135434 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
49 storeys · 496 homes · Mixed use
260 m away · Site plan · Under review · filed Aug 3, 2022
- Under review
10 storeys · 57 homes · Mixed use
390 m away · Site plan · Under review · filed May 12, 2022
Neighbours’ Committee of Adjustment files within 250 m
133 Hazelwood Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition (including a basement extension below), a new covered front porch with stairs, and a rear ground floor deck with stairs. Also, to construct a new one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.
80 m away · filed Mar 3, 2026 · Approved
562 Jones Ave · Minor variance
To legalize and to maintain the interior alterations and conversion of the existing two-storey non-residential (Place of Worship) detached building [with an existing front porch with stairs, rear two-car integral garage, side (south) ground floor deck with stairs, side (south) second floor balcony and a rear rooftop patio] into a residential dwelling. There will be one residential dwelling unit on this lot.
170 m away · filed Aug 12, 2025 · Refused
755 Danforth Ave · Consent
To obtain consent to a long-term lease in excess of 21 years.
80 m away · filed Jan 9, 2024 · Approved
676 Pape Ave · Minor variance
To alter the interior of the existing two-storey mixed-use building to accommodate restaurant uses at the ground floor and accessory uses at the basement level. The two dwelling units on the second floor will be maintained.
240 m away · filed Aug 12, 2022 · Approved
8 Woodycrest Ave · Consent
To obtain consent to sever an existing residential lot into two undersized residential lots and to create a new easement/right-of-way.
180 m away · filed Jun 22, 2022 · Approved
8 Woodycrest Ave · Minor variance
To construct a new three-storey detached dwelling with a front ground floor covered porch, second and third storey front and rear balconies, and a rear deck with a basement walkout. Also, to construct a new two-storey ancillary building (laneway suite) in the rear yard, abutting the laneway.
180 m away · filed Jun 10, 2022 · Approved
8 Woodycrest Ave · Minor variance
To construct a new three-storey detached dwelling with a front ground floor covered porch, second and third storey front and rear balconies, and a rear deck with a basement walkout. Also, to construct a new two-storey ancillary building (laneway suite) in the rear yard, abutting the laneway.
180 m away · filed Jun 10, 2022 · Approved
121 Harcourt Ave · Minor variance
To construct a new 3-storey detached dwelling with a front porch, a front below-grade terrace with a walkout basement entrance for a secondary suite, a rear deck, a rear second storey balcony, and a rear third storey terrace. Also, to maintain the existing one-storey ancillary building in the rear yard of this property.
140 m away · filed May 3, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.