Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

99 Woolner Ave

Toronto Runnymede Transformer Station

The City of Toronto has 8 building permits since 2017 (8 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal to construct a new medium voltage gas insulated switchgear building

    Applied Dec 13, 2019 · issued Jan 16, 2020 · Permit 18 244703 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct a new medium voltage gas insulated switchgear building

    Applied Dec 13, 2019 · issued Mar 12, 2020 · Permit 18 244703 PLB

    Inspections under way
  • New building

    REV #1-fire alarm, electricallayout, exterior wall facadeProposal to construct a new medium voltage gas insulated switchgear building

    Applied Sep 19, 2019 · Permit 18 244703 BLD (revision 01)

    Response received
  • Demolition

    Proposal to demolish existing one storey control building.

    Applied Nov 1, 2018 · issued May 10, 2019 · Permit 18 250891 DEM

    Inspections under way
  • New building

    Proposal to construct a new medium voltage gas insulated switchgear building

    Applied Oct 18, 2018 · issued Jul 31, 2019 · Permit 18 244703 BLD

    Inspections under way
  • Demolition

    demolish existing maintenance building (12.3 x 20.3 ft sheet metal building on concrete slab)

    Applied Jun 5, 2017 · issued Jul 4, 2017 · Permit 17 173194 DEM

    Inspections under way
  • New building

    Proposal to construct a pre-manufactured Protection, Control & Telecom (PCT) at Hydro One's, "Runnymede TS."

    Applied Apr 27, 2017 · issued May 26, 2017 · Permit 17 150139 BLD

    Inspections under way
  • New building

    To construct foundation and to install pre-fabricated metal structure for protection,control and telecomunication equipment for Hydro One.

    Applied Apr 30, 2010 · issued Jun 16, 2010 · Permit 10 166886 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 82 Pritchard Ave · Minor variance

    To construct a laneway suite and a carport.

    220 m away · filed Nov 7, 2024 · Approved

  • 84 Corbett Ave · Minor variance

    To construct a one-storey addition along the west side of the existing detached garage.

    130 m away · filed Sep 16, 2024 · Approved

  • 58 Corbett Ave · Minor variance

    To maintain the existing second storey front platform.

    100 m away · filed Aug 27, 2024 · Approved

  • 82 Pritchard Ave · Minor variance

    To construct a new detached dwelling.

    220 m away · filed Oct 27, 2023 · Approved

  • 58 Corbett Ave · Minor variance

    To construct three-storey rear addition, a one-storey addition above the existing dwelling and a new front porch.

    100 m away · filed May 16, 2022 · Approved

  • 40 Pritchard Ave · Minor variance

    To construct a two-storey front addition. A previous Committee of Adjustment application (A0380/20EYK) approved variances related to floor space index, side yard setback, canopy encroachment, exterior stairs width and location and landscaping.

    180 m away · filed Mar 16, 2022 · Approved

  • 52 Corbett Ave · Minor variance

    To construct a detached garage in the rear yard.

    100 m away · filed Sep 9, 2021 · Deferred

  • 40 Pritchard Ave · Minor variance

    To construct a two-storey front addition.

    180 m away · filed Sep 16, 2020 · Approved

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.