Toronto address · Ward 14, Toronto-Danforth
991 Pape Ave
The City of Toronto has 7 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Designated structure · Sign building permit related
Supply and install two (2) new interior illuminated flex face sign bands, to go along the lenght of the North and West elevations. ***TD**
Applied Feb 15, 2023 · issued Mar 8, 2023 · completed Apr 24, 2024 · Permit 23 114244 DST
- Closed
Plumbing
Plumbing - Proposal to alter existing bank from constructing exterior facade alterations and interior alterations.
Applied Sep 19, 2022 · issued Oct 24, 2022 · completed Nov 21, 2023 · Permit 22 205717 PLB
- Closed
Addition or alteration · Multiple projects
Proposal to alter existing bank from constructing exterior facade alterations and interior alterations.
Applied Sep 19, 2022 · issued Oct 4, 2022 · completed Nov 17, 2023 · Permit 22 205717 BLD
- Closed
Heating and ventilation
HVAC - Proposal to alter existing bank from constructing exterior facade alterations and interior alterations.
Applied Sep 19, 2022 · issued Oct 24, 2022 · completed Nov 24, 2023 · Permit 22 205717 HVA
- Closed
Addition or alteration · Other
Exterior facade/interior bank branch renovation and structural upgrade
Applied Jul 14, 2021 · issued Sep 27, 2021 · completed Sep 16, 2022 · Permit 21 184069 BLD
- Closed
Heating and ventilation
HVAC - Exterior facade/interior bank branch renovation and structural upgrade
Applied Jul 14, 2021 · issued Sep 27, 2021 · completed Sep 23, 2022 · Permit 21 184069 HVA
- Cancelled
Heating and ventilation · Alter: Boiler/Furnace/AC replacement
Proposed replacement of 2 HVAC units on roof top of existing multiple unit building.
Applied Sep 14, 2017 · completed Oct 20, 2017 · Permit 17 232927 MSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
157 Westwood Ave · Minor variance
To construct a new one-storey detached ancillary building (one-car garage), in the rear yard, abutting Carlaw Avenue. The existing detached garage will be demolished.
240 m away · filed Jun 17, 2026 · Hearing scheduled
139 Floyd Ave · Consent
To obtain consent to sever the property into three undersized residential lots.
180 m away · filed Feb 23, 2026 · Hearing scheduled
139 Floyd Ave · Minor variance
To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).
180 m away · filed Feb 23, 2026 · Hearing scheduled
139 Floyd Ave · Minor variance
To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, as well as front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).
180 m away · filed Feb 23, 2026 · Hearing scheduled
139 Floyd Ave · Minor variance
To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).
180 m away · filed Feb 23, 2026 · Hearing scheduled
233 Gowan Ave · Minor variance
To alter the existing two-storey detached dwelling (duplex) by constructing a rear third storey addition. There will be a total of two residential dwelling units on this lot (one unit occupying the ground level, and one unit occupying the second and third levels).
210 m away · filed Sep 8, 2025 · Approved
193 Mortimer Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by enclosing the existing front porch into habitable space.
240 m away · filed Feb 19, 2025 · Approved
185 Gowan Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a detached ancillary building (gazebo) in the rear yard.
110 m away · filed Oct 11, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.