Toronto address · Ward 6, York Centre
1 Marchwood Dr
The City of Toronto has 6 building permits since 2017 (6 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Heating and ventilation
Rev 01 - HVAC - Two storey rear addition, 1-storey side additions, interior alteration, exterior canopy and rear deck.
Applied Sep 27, 2017 · issued Nov 1, 2017 · Permit 16 195006 HVA (revision 01)
- Revision issued
Small residential project · Multiple projects
Rev1: Revision to second floor layout (relocation of washrooms and bedroom).Two storey rear addition, 1-storey side additions, interior alteration, exterior canopy and rear deck.
Applied Sep 20, 2017 · issued Oct 2, 2017 · Permit 16 195006 BLD (revision 01)
- Revision issued
Plumbing
Rev1: Revision to second floor washrooms.Plumbing - Two storey rear addition coverd porch and rear deck
Applied Sep 20, 2017 · issued Sep 25, 2017 · Permit 16 195006 PLB (revision 01)
- Inspections under way
Heating and ventilation
HVAC - Two storey rear addition, 1-storey side additions, interior alteration, exterior canopy and rear deck.
Applied Nov 7, 2016 · issued Dec 21, 2016 · Permit 16 195006 HVA
- Inspections under way
Plumbing
Plumbing - Two storey rear addition coverd porch and rear deck
Applied Jul 21, 2016 · issued Oct 14, 2016 · Permit 16 195006 PLB
- Inspections under way
Small residential project · Multiple projects
Two storey rear addition, 1-storey side additions, interior alteration, exterior canopy and rear deck.
Applied Jul 21, 2016 · issued Oct 14, 2016 · Permit 16 195006 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
115 Sandringham Dr · Minor variance
To alter the existing two-storey detached dwelling by enlarging the rear covered porch. Note: This application was previously deferred at the Committee of Adjustment hearing on Novermber 20, 2025.
140 m away · filed Jul 7, 2025 · Approved
115 Sandringham Dr · Minor variance
Proposal to construct a new dwelling.
140 m away · filed Jul 12, 2024 · Approved
30 Bombay Ave · Minor variance
To construct a 2 storey addition to the rear and over garage of existing dwelling.
70 m away · filed Dec 9, 2022 · Approved
2 Marchwood Dr · Minor variance
Proposal to construct a new dwelling.
40 m away · filed Dec 5, 2022 · Approved
25 Barwick Dr · Minor variance
To construct a new garage with a second floor above containing habitable living space.
130 m away · filed Feb 11, 2022 · Approved
103 Sandringham Dr · Minor variance
To construct a rear yard cabana.
150 m away · filed Nov 26, 2021 · Approved
101 Bidewell Ave · Minor variance
To construct a two-storey rear addition, integral garage in side yard, and new cabana.
150 m away · filed Oct 14, 2021 · conditional approval
21 Armour Blvd · Minor variance
To legalize and maintain the existing rear yard deck.
230 m away · filed Jun 8, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.