Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 6, York Centre

101 Bidewell Ave

The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal for 2 storey rear addition and interior alterations

    Applied Oct 17, 2022 · issued Nov 4, 2022 · completed Feb 3, 2023 · Permit 21 191434 HVA

    Closed
  • Small residential project · Multiple projects

    REVISION 2 - to constuct a 2 storey side addition with an integral garage as per the TLAB Decision.See also 21 197655 ZZC and 21 249561 S46 06 TLAB.Proposal for 2 storey rear addition and interior alterations

    Applied Oct 17, 2022 · issued Nov 9, 2022 · completed Feb 3, 2023 · Permit 21 191434 BLD (revision 02)

    Closed
  • Small residential project · Multiple projects

    Revision 01 - to underpinning and recongigure alterations to all floorsProposal for 2 storey rear addition and interior alterations

    Applied Jan 6, 2022 · issued Mar 4, 2022 · completed Feb 3, 2023 · Permit 21 191434 BLD (revision 01)

    Closed
  • Plumbing

    Plumbing - Proposal for 2 storey rear addition and interior alterations

    Applied Jul 29, 2021 · issued Sep 7, 2021 · completed Feb 3, 2023 · Permit 21 191434 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal for 2 storey rear addition and interior alterations

    Applied Jul 29, 2021 · issued Sep 7, 2021 · completed Feb 3, 2023 · Permit 21 191434 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a two-storey rear addition, integral garage in side yard, and new cabana.

    Decision: conditional approval (hearing Dec 2, 2021)

    Filed Oct 14, 2021 · File A0705/21NY

    TLAB appeal

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 168 Sandringham Dr · Minor variance

    To construct a new two-storey detached dwelling with an integral garage, front porch, rear balconies and an ancillary structure (cabana) in the rear yard.

    250 m away · filed Feb 23, 2026 · Approved on condition

  • 115 Sandringham Dr · Minor variance

    To alter the existing two-storey detached dwelling by enlarging the rear covered porch. Note: This application was previously deferred at the Committee of Adjustment hearing on Novermber 20, 2025.

    160 m away · filed Jul 7, 2025 · Approved

  • 115 Sandringham Dr · Minor variance

    Proposal to construct a new dwelling.

    160 m away · filed Jul 12, 2024 · Approved

  • 30 Bombay Ave · Minor variance

    To construct a 2 storey addition to the rear and over garage of existing dwelling.

    120 m away · filed Dec 9, 2022 · Approved

  • 2 Marchwood Dr · Minor variance

    Proposal to construct a new dwelling.

    130 m away · filed Dec 5, 2022 · Approved

  • 25 Barwick Dr · Minor variance

    To construct a new garage with a second floor above containing habitable living space.

    250 m away · filed Feb 11, 2022 · Approved

  • 25 Tregellis Rd · Minor variance

    Proposal to construct a new two storey dwelling with attached garage, shed, and basement walk out.

    110 m away · filed Jan 5, 2022 · Approved

  • 87 Bideford Ave · Minor variance

    To construct a new dwelling with an integrated garage,basement walkout and deck at rear.

    210 m away · filed Oct 13, 2021 · Approved

Everything planned in York Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.