Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

1 Mount Pleasant Rd

The City of Toronto has 115 building permits since 2017 (48 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Other

    Replace existing Dry Sprinkler System with new Dry Sprinkler System for the 18th floor.

    Applied Nov 3, 2025 · issued Dec 8, 2025 · completed Apr 20, 2026 · Permit 25 248492 BLD

    Closed
  • Fire and security upgrade · Fire alarm

    Fire Alarm Upgrade: to add strobes in the required area to address accessibility requirement, the rest existing fire alarm to remain.

    Applied Jul 10, 2025 · issued Jul 18, 2025 · Permit 25 191826 FSU

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal to replace existing handrails/guardrail on the interior entrance ramp.

    Applied Jun 11, 2025 · issued Jun 13, 2025 · completed Oct 25, 2025 · Permit 25 175801 BLD

    Closed
  • Addition or alteration · Interior alterations

    Proposal to replace existing handrails/guardrail on the interior entrance ramp.

    Applied Jun 6, 2025 · completed Jun 6, 2025 · Permit 25 172792 BLD

    Cancelled
  • Heating and ventilation

    Rev. 1 - Revision to allow mechanical roof top units to extend beyond the max. building height of18.3 meters. See 25 103285 ZAP 00 ZR.HVAC - Proposed Interior Alterations to an area on the south end of the Isabella Tower, on the existing second floor "Rogers Communications"

    Applied May 16, 2025 · issued Jun 25, 2025 · completed May 14, 2026 · Permit 24 164879 HVA (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Rev. 1 - Revision to allow mechanical roof top units to extend beyond the max. building height of18.3 meters. See 25 103285 ZAP 00 ZR.Proposed Interior Alterations to an area on the south end of the Isabella Tower, on the existing second floor "Rogers Communications"

    Applied May 16, 2025 · issued May 23, 2025 · completed Apr 9, 2026 · Permit 24 164879 BLD (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Proposal to replace existing handrails/guardrail on the interior entrance ramp

    Applied May 15, 2025 · completed May 20, 2025 · Permit 25 159967 BLD

    Cancelled
  • Plumbing

    Plumbing - Proposal to replace existing trench drain outside entrance at 66 Huntley Street and provide proper concrete support.

    Applied Sep 13, 2024 · issued Nov 6, 2024 · completed Jan 9, 2025 · Permit 24 212490 PLB

    Closed
  • Addition or alteration · Other

    Proposal to replace existing trench drain outside entrance at 66 Huntley Street and provide proper concrete support.

    Applied Sep 13, 2024 · issued Nov 6, 2024 · completed Jan 27, 2025 · Permit 24 212490 BLD

    Closed
  • Addition or alteration · Interior alterations

    Proposed Interior Alterations to an area on the south end of the Isabella Tower, on the existing second floor "Rogers Communications"

    Applied Jun 14, 2024 · issued Sep 26, 2024 · completed Apr 9, 2026 · Permit 24 164879 BLD

    Closed
  • Plumbing

    Plumbing - Proposed Interior Alterations to an area on the south end of the Isabella Tower, on the existing second floor "Rogers Communications"

    Applied Jun 14, 2024 · issued Sep 26, 2024 · completed Apr 24, 2026 · Permit 24 164879 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposed Interior Alterations to an area on the south end of the Isabella Tower, on the existing second floor "Rogers Communications"

    Applied Jun 14, 2024 · issued Sep 26, 2024 · completed May 14, 2026 · Permit 24 164879 HVA

    Closed
Show 103 more permits
  • Addition or alteration · Other

    Resecure the exterior edge soffit aluminum cladding panels to the pedestrian bridge substructure.

    Applied Jun 23, 2023 · issued Sep 12, 2023 · completed Dec 19, 2023 · Permit 23 165161 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to back of house kitchen - "Rogers"

    Applied Mar 24, 2023 · issued Apr 26, 2023 · completed Mar 28, 2024 · Permit 23 126740 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to back of house kitchen - "Rogers"

    Applied Mar 24, 2023 · issued Apr 26, 2023 · completed Apr 11, 2024 · Permit 23 126740 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to back of house kitchen - "Rogers"

    Applied Mar 24, 2023 · issued Apr 26, 2023 · completed Mar 19, 2024 · Permit 23 126740 BLD

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to existing office spaces on portions of the 4th & 10th floor levels - 'Rogers Communications'.

    Applied Nov 1, 2022 · issued Nov 18, 2022 · Permit 22 224616 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Interior alterations to an existing office space on the 4th and 10th floors - Rogers Communications

    Applied Nov 1, 2022 · issued Dec 5, 2022 · Permit 22 224616 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Interior alterations to Unit 128 - Rogers Sportsnet

    Applied Apr 7, 2022 · issued Apr 25, 2022 · completed Oct 28, 2022 · Permit 22 131737 BLD

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to Unit 128 - Rogers Sportsnet

    Applied Apr 7, 2022 · issued May 18, 2022 · completed Sep 23, 2022 · Permit 22 131737 HVA

    Closed
  • Plumbing

    Plumbing - Interior alterations to Unit 128 - Rogers Sportsnet

    Applied Apr 7, 2022 · issued May 18, 2022 · completed Sep 26, 2022 · Permit 22 131737 PLB

    Closed
  • Addition or alteration · Interior alterations

    Renovation to an existing Tim Horton's on the second floor of the Rogers building.

    Applied Oct 6, 2021 · issued Oct 22, 2021 · Permit 21 222336 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Renovation to an existing Tim Horton's on the second floor of the Rogers building.

    Applied Oct 6, 2021 · issued Nov 8, 2021 · completed Oct 14, 2025 · Permit 21 222336 HVA

    Closed
  • Heating and ventilation

    Revision 01 - to modify existing edit suite on 8th floor HVAC - Interior demolition to existing office space on 8th floor and construction of new office space for media production, work includes alterations to mechanical and electrical ancillary spaces

    Applied Jun 29, 2021 · issued Jul 30, 2021 · completed May 26, 2023 · Permit 20 227717 HVA (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Revision 01 - to modify an exist. office space into a new space for media production (editing suite) on the 8th floor.Proposal for interior alterations to demolish a portion of an existing office space on the 8th floor and construct a new space for media production. Scope of work also includes alterations to mechanical and electrical ancillary spaces plus exterior alterations for new mechanical units on the roof level.

    Applied Jun 29, 2021 · issued Jul 21, 2021 · completed Jul 24, 2023 · Permit 20 227717 BLD (revision 01)

    Closed
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Interior demolition to existing office space on 8th floor and construction of new office space for media production, work includes alterations to mechanical and electrical ancillary spaces

    Applied Dec 15, 2020 · issued Apr 21, 2021 · completed Apr 21, 2021 · Permit 20 227717 FSU

    Closed
  • Addition or alteration · Other

    Proposal for interior alterations to demolish a portion of an existing office space on the 8th floor and construct a new space for media production. Scope of work also includes alterations to mechanical and electrical ancillary spaces plus exterior alterations for new mechanical units on the roof level.

    Applied Dec 10, 2020 · issued Feb 11, 2021 · completed Jul 24, 2023 · Permit 20 227717 BLD

    Closed
  • Heating and ventilation

    HVAC - Interior demolition to existing office space on 8th floor and construction of new office space for media production, work includes alterations to mechanical and electrical ancillary spaces

    Applied Dec 10, 2020 · issued Feb 11, 2021 · completed May 26, 2023 · Permit 20 227717 HVA

    Closed
  • Plumbing

    Plumbing - Interior demolition to existing office space on 8th floor and construction of new office space for media production, work includes alterations to mechanical and electrical ancillary spaces

    Applied Dec 10, 2020 · issued Feb 11, 2021 · completed May 8, 2023 · Permit 20 227717 PLB

    Closed
  • Addition or alteration · Other

    Proposed reconstruction of the concrete ramp and repairs to the Huntley Street ramp for entry to an existing office building.

    Applied May 9, 2019 · issued May 27, 2019 · Permit 19 151838 BLD

    Permit issued
  • Fire and security upgrade · Electromagnetic locks

    Installation of four (4) maglocks in P2 Parking level

    Applied Mar 13, 2019 · issued Mar 25, 2019 · completed Aug 6, 2019 · Permit 19 125037 FSU

    Closed
  • Addition or alteration · Other

    Proposed insallation of four new door opening devices in an existing office building.

    Applied Nov 5, 2018 · issued Nov 29, 2018 · completed Jul 5, 2019 · Permit 18 252542 BLD

    Closed
  • Plumbing

    Revision #2 - Revision including addition of DHW tanks for sinks and specification of hot water tank as per bubbled drawings.Plumbing Revision #1 - interior layout and finishes to the 4th floor of existing office - "Rogers Communications"

    Applied Aug 7, 2018 · issued Aug 31, 2018 · completed Oct 2, 2018 · Permit 17 276160 PLB (revision 02)

    Closed
  • Addition or alteration · Interior alterations

    Interior Alterations to office space on the 15th floor.

    Applied Jun 1, 2018 · issued Jun 18, 2018 · completed Feb 7, 2019 · Permit 18 170023 BLD

    Closed
  • Heating and ventilation

    HVAC - Interior Alterations to office space on the 15th floor.

    Applied Jun 1, 2018 · issued Jul 5, 2018 · completed Jul 17, 2018 · Permit 18 170023 HVA

    Closed
  • Plumbing

    Plumbing - Interior Alterations to office space on the 15th floor.

    Applied Jun 1, 2018 · issued Jul 5, 2018 · completed Jul 18, 2018 · Permit 18 170023 PLB

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Add maglocks to 4th floor south elevator lobby.

    Applied May 23, 2018 · issued May 24, 2018 · completed Oct 17, 2018 · Permit 18 163818 FSU

    Closed
  • Heating and ventilation

    HVAC Revision #1 - interior layout and finishes to the 4th floor of existing office - "Rogers Communications"

    Applied Mar 29, 2018 · issued Apr 19, 2018 · completed Oct 2, 2018 · Permit 17 276160 HVA (revision 01)

    Closed
  • Plumbing

    Plumbing Revision #1 - interior layout and finishes to the 4th floor of existing office - "Rogers Communications"

    Applied Mar 29, 2018 · issued Apr 19, 2018 · completed Oct 2, 2018 · Permit 17 276160 PLB (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Revision #1 - interior layout and finishes to the 4th floor of existing office - "Rogers Communications"

    Applied Mar 29, 2018 · issued May 2, 2018 · completed Oct 18, 2018 · Permit 17 276160 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Full floor tenant. Splitting of one room into two edit suites

    Applied Jan 2, 2018 · issued Jan 31, 2018 · Permit 18 100179 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Full floor tenant. Splitting of one room into two edit suites

    Applied Jan 2, 2018 · issued Jan 17, 2018 · Permit 18 100179 BLD

    Permit issued
  • Addition or alteration · Multiple projects

    Revision 02 - as requested by Building Inspector for the P-1 Level Pre-action room. Sprinklers were changed from Pendnat to Upright only.Interior alterations to existing office space on 3rd floor & P1 level, alterations to existing mechanical & electrical ancillary spaces, and 2 new roof top chillers. Tenant - "Rogers".

    Applied Dec 21, 2017 · issued Feb 2, 2018 · Permit 17 128410 BLD (revision 02)

    Revision issued
  • Fire and security upgrade · Electromagnetic locks

    Installation of an Electomagnetic Lock on the 6th Floor for the elevator lobby double doors

    Applied Dec 20, 2017 · issued Jan 5, 2018 · Permit 17 278005 FSU

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior alterations to the 4th floor of existing office - "Rogers Communications"

    Applied Dec 15, 2017 · issued Jan 17, 2018 · completed Oct 2, 2018 · Permit 17 276160 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to the 4th floor of existing office - "Rogers Communications"

    Applied Dec 15, 2017 · issued Jan 17, 2018 · completed Oct 2, 2018 · Permit 17 276160 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to the 4th floor of existing office - "Rogers Communications"

    Applied Dec 15, 2017 · issued Jan 17, 2018 · completed Oct 18, 2018 · Permit 17 276160 BLD

    Closed
  • Addition or alteration · Multiple projects

    Revision 01 - Addition of sprinklersInterior alterations to existing office space on 3rd floor & P1 level, alterations to existing mechanical & electrical ancillary spaces, and 2 new roof top chillers. Tenant - "Rogers".

    Applied Sep 22, 2017 · issued Oct 25, 2017 · Permit 17 128410 BLD (revision 01)

    Revision issued
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install 1 maglock on the 3rd floor of exiting office.

    Applied Aug 16, 2017 · issued Aug 21, 2017 · completed Nov 14, 2017 · Permit 17 217753 FSU

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to existing office space on the ground floor - "Rogers OMP".

    Applied Jul 31, 2017 · issued Sep 1, 2017 · completed Oct 14, 2025 · Permit 17 208529 HVA

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations to existing office space on the ground floor - "Rogers OMP".

    Applied Jul 31, 2017 · issued Jul 31, 2017 · Permit 17 208529 BLD

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alterations to existing office space on the 6h floor. Tenant - "Rogers OMP".

    Applied Jul 18, 2017 · issued Aug 18, 2017 · Permit 17 200541 BLD

    Inspections under way
  • Plumbing

    Plumbing - Interior alterations to existing office space on the 6h floor. Tenant - "Rogers OMP".

    Applied Jul 18, 2017 · issued Aug 18, 2017 · completed Mar 20, 2026 · Permit 17 200541 PLB

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to existing office space on the 6h floor. Tenant - "Rogers OMP".

    Applied Jul 18, 2017 · issued Aug 18, 2017 · Permit 17 200541 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Interior alterations to partial ground floor office space (north portion of building). Tenant - "Rogers - OMP Creative Studio".

    Applied May 2, 2017 · issued May 3, 2017 · Permit 17 152822 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Interior alterations to partial ground floor office space (north portion of building). Tenant - "Rogers - OMP Creative Studio".

    Applied May 2, 2017 · issued May 18, 2017 · Permit 17 152822 HVA

    Permit issued
  • Plumbing

    Plumbing - Interior alterations to partial ground floor office space (north portion of building). Tenant - "Rogers - OMP Creative Studio".

    Applied May 2, 2017 · issued May 18, 2017 · Permit 17 152822 PLB

    Permit issued
  • Plumbing

    Plumbing - Interior alterations to existing office space on 3rd floor & P1 level, alterations to existing mechanical & electrical ancillary spaces, and 2 new roof top chillers. Tenant - "Rogers".

    Applied Mar 13, 2017 · issued Apr 11, 2017 · completed Mar 20, 2026 · Permit 17 128410 PLB

    Closed
  • Addition or alteration · Multiple projects

    Interior alterations to existing office space on 3rd floor & P1 level, alterations to existing mechanical & electrical ancillary spaces, and 2 new roof top chillers. Tenant - "Rogers".

    Applied Mar 13, 2017 · issued Mar 22, 2017 · Permit 17 128410 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alterations to existing office space on 3rd floor & P1 level, alterations to existing mechanical & electrical ancillary spaces, and 2 new roof top chillers. Tenant - "Rogers".

    Applied Mar 13, 2017 · issued Apr 11, 2017 · Permit 17 128410 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alterations to existing office space on the 9th floor. Tenant - "Rogers".

    Applied Jan 27, 2017 · issued Feb 15, 2017 · Permit 17 109921 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alterations to existing office space on the 9th floor. Tenant - "Rogers".

    Applied Jan 27, 2017 · issued Feb 15, 2017 · Permit 17 109921 HVA

    Permit issued
  • Plumbing

    Plumbing - Interior alterations to existing office space on the 9th floor. Tenant - "Rogers".

    Applied Jan 27, 2017 · issued Feb 15, 2017 · completed Dec 13, 2017 · Permit 17 109921 PLB

    Closed
  • Plumbing

    Revision to remove washroom from the scope of workPlumbing - Proposal for interior alterations to the 5th floor - "Rogers Communications"

    Applied Sep 23, 2016 · issued Oct 11, 2016 · Permit 16 134751 PLB (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Revision to remove washroom from the scope of workProposal for interior alterations to the 5th floor - "Rogers Communications"

    Applied Sep 23, 2016 · issued May 16, 2017 · Permit 16 134751 BLD (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to gas meter room to isolate Enbridge gas meter alcove from building.

    Applied Apr 13, 2016 · issued May 12, 2016 · Permit 16 140069 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior alterations to the 2nd floor of existing office - "Rogers Communications"

    Applied Apr 6, 2016 · issued Jun 7, 2016 · Permit 16 136706 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to the 2nd floor of existing office - "Rogers Communications"

    Applied Apr 6, 2016 · issued Jun 7, 2016 · Permit 16 136706 BLD

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to the 5th floor - "Rogers Communications"

    Applied Apr 1, 2016 · issued Apr 29, 2016 · Permit 16 134751 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations to the 5th floor - "Rogers Communications"

    Applied Apr 1, 2016 · issued Apr 29, 2016 · Permit 16 134751 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to existing office space on the 15th floor - Rogers Communications Inc

    Applied Mar 22, 2016 · issued Mar 31, 2016 · Permit 16 130848 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Proposal for interior alterations to existing office space on the 15th floor - Rogers Communications Inc

    Applied Mar 22, 2016 · issued Apr 18, 2016 · Permit 16 130848 HVA

    Permit issued
  • Heating and ventilation

    HVAC - interior alterations to meeting room unit 900

    Applied Jun 24, 2014 · issued Jul 30, 2014 · Permit 14 179853 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    interior alterations to meeting room unit 900

    Applied Jun 24, 2014 · issued Jul 8, 2014 · Permit 14 179853 BLD

    Permit issued
  • Heating and ventilation

    HVAC - To complete interior alterations to Suite 300 of the existing office building.

    Applied Jun 24, 2014 · issued Jul 22, 2014 · Permit 14 179265 HVA

    Permit issued
  • Fire and security upgrade · Sprinklers

    Proposal to install a new pre-action and dry sprinkler system to existing data center on the 4th floor of existing building for "Rogers". Proposal also includes a hub drain

    Applied May 26, 2014 · issued May 27, 2014 · Permit 14 161360 FSU

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to unit #1600 in existing office building - "Rogers Communications"

    Applied Mar 4, 2014 · issued Mar 14, 2014 · Permit 14 124303 BLD

    Permit issued
  • Plumbing

    Plumbing - Proposal for interior alterations to unit #1600 in existing office building - "Rogers Communications"

    Applied Mar 4, 2014 · issued Mar 14, 2014 · Permit 14 124303 PLB

    Permit issued
  • Designated structure · Sign building permit related

    To erect and display one illuminated wall sign on the south-westerly corner on an existing structure.**Parking Lot**

    Applied Jul 12, 2013 · completed Oct 2, 2019 · Permit 13 203721 DST

    Cancelled
  • Plumbing

    Plumbing - no fixtures proposed, only piping for water cooler.Proposal for interior alterations to existing office space on the 5th floor - "Rogers".

    Applied Jun 6, 2013 · issued Jun 20, 2013 · Permit 13 182849 PLB

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to the 8th floor of existing office building "Rogers Communications" (83.8m2).

    Applied Nov 5, 2012 · issued Nov 20, 2012 · Permit 12 273964 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Proposal for interior alterations to the 8th floor of existing office building "Rogers Communications" (83.8m2).

    Applied Nov 5, 2012 · issued Nov 20, 2012 · completed Oct 14, 2025 · Permit 12 273964 HVA

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to existing office space on floors 7 and 8 - Rogers.

    Applied Oct 25, 2011 · issued Nov 1, 2011 · Permit 11 298432 HVA

    Permit issued
  • Plumbing

    Plumbing - This is to take up two existing parking spots for a new hand car wash area. This is going to be used only for employees of Rogers Communication Inc. The hand car wash area will be located at the 3rd level below grade parking area at south east portion of the parking garage. There are typical floor plan(s) and a letter indicating the area and number of parking spots for zoning purposes.

    Applied Nov 8, 2010 · issued Nov 26, 2010 · completed Jun 8, 2026 · Permit 10 293119 PLB

    Closed (dormant)
  • Plumbing

    Plumbing - permit for interior alterations to existing office space - Floors 2, 4, 5 and 13 - Elevator lobby on floors 4,5,13 and Mail room on second floor.

    Applied Jun 30, 2010 · issued Jul 21, 2010 · completed Jun 8, 2026 · Permit 10 209657 PLB

    Closed (dormant)
  • Heating and ventilation

    HVAC - permit for interior alterations to existing office space - floor 3 - Sportsnet floor.For plans see building permit file.

    Applied May 5, 2010 · issued May 13, 2010 · completed Jul 9, 2025 · Permit 10 169602 HVA

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install 2 backflow preventors.

    Applied Oct 23, 2009 · issued Nov 13, 2009 · completed May 27, 2026 · Permit 09 181792 PSA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations for a new UPS (uninterupted power supply) plant on parking level P3 of a multi unit building.

    Applied Jun 19, 2009 · issued Aug 5, 2009 · Permit 09 152194 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations for a new UPS (uninterupted power supply) plant on parking level P3 of a multi unit building.

    Applied Jun 19, 2009 · issued Aug 5, 2009 · completed Jun 8, 2026 · Permit 09 152194 PLB

    Closed (dormant)
  • Heating and ventilation

    HVAC - Proposal for interior alterations for a new UPS (uninterupted power supply) plant on parking level P3 of a multi unit building.

    Applied Jun 19, 2009 · issued Aug 14, 2009 · completed Jun 8, 2026 · Permit 09 152194 HVA

    Closed (dormant)
  • Heating and ventilation

    HVAC - Proposal for interior alterations to the 5th floor office space for existing tenant Rogers Communications Inc. (1270.9m2).

    Applied Jan 23, 2009 · issued Feb 17, 2009 · completed May 27, 2026 · Permit 09 104436 HVA

    Closed
  • Plumbing

    Plumbing - Interior alterations to a number of floors in order to install a new standby power generator plant on the roof (not life safety).

    Applied Dec 23, 2008 · issued Jan 21, 2009 · completed Jul 9, 2026 · Permit 08 231562 PLB

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to a number of floors in order to install a new standby power generator plant on the roof (not life safety).

    Applied Dec 23, 2008 · issued Jan 21, 2009 · completed Jun 8, 2026 · Permit 08 231562 HVA

    Closed (dormant)
  • Heating and ventilation

    HVAC - Proposal for interior alterations to 4th floor office for existing tenant Rogers Communication (4806m2).

    Applied Dec 17, 2008 · issued Jan 20, 2009 · completed Jun 8, 2026 · Permit 08 230189 HVA

    Closed (dormant)
  • Heating and ventilation

    HVAC - Interior alterations to existing office space - floor 7, 8, 11 - Rogers

    Applied Oct 28, 2008 · issued Dec 8, 2008 · completed Jun 8, 2026 · Permit 08 216380 HVA

    Closed (dormant)
  • Heating and ventilation

    HVAC - Interior alterations to existing office on the 10th floor. Part of Huntely Tower, OMP Tower, and Isabella Tower.

    Applied Aug 28, 2008 · issued Oct 17, 2008 · completed May 27, 2026 · Permit 08 198119 HVA

    Closed
  • Heating and ventilation

    HVAC - Make interior alterations to office.

    Applied Nov 14, 2007 · issued Nov 20, 2007 · completed May 27, 2026 · Permit 07 278560 HVA

    Closed
  • Addition or alteration · Interior alterations

    Make interior alterations to office.

    Applied Nov 14, 2007 · issued Nov 20, 2007 · completed May 27, 2026 · Permit 07 278560 BLD

    Closed
  • Addition or alteration · Interior alterations

    Make interior alterations to kitchen area of cafeteria in office building.

    Applied Nov 12, 2007 · issued Nov 20, 2007 · completed Jun 8, 2026 · Permit 07 278013 BLD

    Closed (dormant)
  • Addition or alteration · Interior alterations

    Interior alterations to existing office fitness area - floor 2.

    Applied Nov 5, 2007 · issued Nov 13, 2007 · Permit 07 276212 BLD

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alterations to existing office space - floor 3 - Rogers

    Applied Oct 11, 2007 · issued Nov 1, 2007 · Permit 07 269070 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alterations to portion of existing Suite on 5th floor. Multi Tenant Floor

    Applied Jul 16, 2007 · issued Jul 23, 2007 · completed May 27, 2026 · Permit 07 243279 HVA

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations to portion of existing Suite on 5th floor. Multi Tenant Floor

    Applied Jul 16, 2007 · issued Jul 23, 2007 · completed May 27, 2026 · Permit 07 243279 BLD

    Closed
  • Heating and ventilation

    HVAC - interior alterations to exisitng office space - interior alterations to 9th floor

    Applied Jun 11, 2007 · issued Jun 19, 2007 · Permit 07 230298 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    interior alterations to exisitng office space - interior alterations to 9th floor

    Applied Jun 11, 2007 · issued Jun 19, 2007 · Permit 07 230298 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alterations to existing office on the 3rd floor.

    Applied Jun 5, 2007 · issued Jun 13, 2007 · Permit 07 227933 HVA

    Permit issued
  • Plumbing

    Plumbing - Interior alterations to existing office on the 3rd floor.

    Applied Jun 5, 2007 · issued Jun 12, 2007 · Permit 07 227933 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alterations to the ground floor to construct a television broadcast facility, no audience

    Applied Apr 11, 2007 · issued Apr 26, 2007 · completed Sep 8, 2026 · Permit 07 148386 HVA

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to existing office on the 13th floor.

    Applied Feb 8, 2007 · issued Feb 12, 2007 · Permit 07 108093 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alterations to existing office on the 13th floor.

    Applied Feb 8, 2007 · issued Feb 12, 2007 · completed May 27, 2026 · Permit 07 108093 BLD

    Closed
  • Heating and ventilation

    HVAC - Interior alterations at the second floor office space to remove and relocate partition

    Applied Feb 5, 2007 · issued Feb 9, 2007 · completed Sep 8, 2026 · Permit 07 106806 HVA

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations to existing office on portion of ground floor.

    Applied Nov 30, 2006 · issued Dec 5, 2006 · Permit 06 195136 BLD

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    Install 1 maglock on 3rd floor

    Applied Sep 1, 2005 · issued Sep 12, 2005 · completed May 27, 2026 · Permit 05 177248 FSU

    Closed
  • Non-residential building permit · Addition/Alteration to existing building

    build ring-parapet around building. historical

    Applied Nov 23, 1999 · issued Mar 3, 2000 · Permit 99 112051 COM

    Inspections under way
  • Fire and security upgrade · Unknown

    Provide sprinkler shop drawings with respect to building permit application no. 393727. Peter au is familiar. Edc cost included in 393727

    Applied Dec 15, 1997 · issued Aug 4, 1998 · completed Sep 8, 2026 · Permit 97 025203 FSU

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To permit the replacement of 4 new mechanical units.

    Decision: Approved (hearing Apr 9, 2025)

    Filed Feb 11, 2025 · File A0116/25TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 235 Bloor St E · Minor variance

    150 m away · filed Aug 31, 2026 · Postponed

  • 10 Huntley St · Consent

    To obtain consent to sever the property into two lots to differentiate the retained lands (existing 20-storey apartment) from the development lands (proposed 45-storey residential building), and to create reciprocal access easements/rights-of-way.

    230 m away · filed Mar 24, 2025 · Postponed

  • 387 Bloor St E · Minor variance

    To reallocate residential occupants parking spaces to be used for the hotel use, increasing hotel parking to 139 spaces.

    240 m away · filed Apr 5, 2022 · Approved

  • 92 Isabella St · Minor variance

    To alter the existing three-storey office building by constructing a new elevator and a new dormer over the elevator shaft.

    210 m away · filed Feb 8, 2021 · Approved

  • 387 Bloor St E · Minor variance

    To alter the under construction 52-storey mixed-use building containing residential, retail and hotel uses by constructing five additional stories.

    240 m away · filed Apr 23, 2019 · Approved

  • 592 Sherbourne St · Minor variance

    To alter the redevelopment plan approved under Site-specific By-law 276-2015 for a 50-storey mixed-use building by increasing the maximum permitted non-residential gross floor area.

    240 m away · filed Jan 24, 2018 · Approved

  • 123 Isabella St · Minor variance

    To convert the existing three-storey hospice care facility containing 9 beds into a residential care facility for a transitional residence containing 20 rooms.

    210 m away · filed Mar 31, 2017 · Approved

  • 365 Bloor St E · Minor variance

    To alter the existing mixed-use development by installing an emergency generator on the podium roof.

    210 m away · filed Oct 26, 2016 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.