Toronto address · Ward 13, Toronto Centre
1 Mount Pleasant Rd
The City of Toronto has 115 building permits since 2017 (48 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Addition or alteration · Other
Replace existing Dry Sprinkler System with new Dry Sprinkler System for the 18th floor.
Applied Nov 3, 2025 · issued Dec 8, 2025 · completed Apr 20, 2026 · Permit 25 248492 BLD
- Inspections under way
Fire and security upgrade · Fire alarm
Fire Alarm Upgrade: to add strobes in the required area to address accessibility requirement, the rest existing fire alarm to remain.
Applied Jul 10, 2025 · issued Jul 18, 2025 · Permit 25 191826 FSU
- Closed
Addition or alteration · Interior alterations
Proposal to replace existing handrails/guardrail on the interior entrance ramp.
Applied Jun 11, 2025 · issued Jun 13, 2025 · completed Oct 25, 2025 · Permit 25 175801 BLD
- Cancelled
Addition or alteration · Interior alterations
Proposal to replace existing handrails/guardrail on the interior entrance ramp.
Applied Jun 6, 2025 · completed Jun 6, 2025 · Permit 25 172792 BLD
- Closed
Heating and ventilation
Rev. 1 - Revision to allow mechanical roof top units to extend beyond the max. building height of18.3 meters. See 25 103285 ZAP 00 ZR.HVAC - Proposed Interior Alterations to an area on the south end of the Isabella Tower, on the existing second floor "Rogers Communications"
Applied May 16, 2025 · issued Jun 25, 2025 · completed May 14, 2026 · Permit 24 164879 HVA (revision 01)
- Closed
Addition or alteration · Interior alterations
Rev. 1 - Revision to allow mechanical roof top units to extend beyond the max. building height of18.3 meters. See 25 103285 ZAP 00 ZR.Proposed Interior Alterations to an area on the south end of the Isabella Tower, on the existing second floor "Rogers Communications"
Applied May 16, 2025 · issued May 23, 2025 · completed Apr 9, 2026 · Permit 24 164879 BLD (revision 01)
- Cancelled
Addition or alteration · Interior alterations
Proposal to replace existing handrails/guardrail on the interior entrance ramp
Applied May 15, 2025 · completed May 20, 2025 · Permit 25 159967 BLD
- Closed
Plumbing
Plumbing - Proposal to replace existing trench drain outside entrance at 66 Huntley Street and provide proper concrete support.
Applied Sep 13, 2024 · issued Nov 6, 2024 · completed Jan 9, 2025 · Permit 24 212490 PLB
- Closed
Addition or alteration · Other
Proposal to replace existing trench drain outside entrance at 66 Huntley Street and provide proper concrete support.
Applied Sep 13, 2024 · issued Nov 6, 2024 · completed Jan 27, 2025 · Permit 24 212490 BLD
- Closed
Addition or alteration · Interior alterations
Proposed Interior Alterations to an area on the south end of the Isabella Tower, on the existing second floor "Rogers Communications"
Applied Jun 14, 2024 · issued Sep 26, 2024 · completed Apr 9, 2026 · Permit 24 164879 BLD
- Closed
Plumbing
Plumbing - Proposed Interior Alterations to an area on the south end of the Isabella Tower, on the existing second floor "Rogers Communications"
Applied Jun 14, 2024 · issued Sep 26, 2024 · completed Apr 24, 2026 · Permit 24 164879 PLB
- Closed
Heating and ventilation
HVAC - Proposed Interior Alterations to an area on the south end of the Isabella Tower, on the existing second floor "Rogers Communications"
Applied Jun 14, 2024 · issued Sep 26, 2024 · completed May 14, 2026 · Permit 24 164879 HVA
Show 103 more permits
- Closed
Addition or alteration · Other
Resecure the exterior edge soffit aluminum cladding panels to the pedestrian bridge substructure.
Applied Jun 23, 2023 · issued Sep 12, 2023 · completed Dec 19, 2023 · Permit 23 165161 BLD
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to back of house kitchen - "Rogers"
Applied Mar 24, 2023 · issued Apr 26, 2023 · completed Mar 28, 2024 · Permit 23 126740 HVA
- Closed
Plumbing
Plumbing - Proposal for interior alterations to back of house kitchen - "Rogers"
Applied Mar 24, 2023 · issued Apr 26, 2023 · completed Apr 11, 2024 · Permit 23 126740 PLB
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to back of house kitchen - "Rogers"
Applied Mar 24, 2023 · issued Apr 26, 2023 · completed Mar 19, 2024 · Permit 23 126740 BLD
- Permit issued
Addition or alteration · Interior alterations
Proposal for interior alterations to existing office spaces on portions of the 4th & 10th floor levels - 'Rogers Communications'.
Applied Nov 1, 2022 · issued Nov 18, 2022 · Permit 22 224616 BLD
- Permit issued
Heating and ventilation
HVAC - Interior alterations to an existing office space on the 4th and 10th floors - Rogers Communications
Applied Nov 1, 2022 · issued Dec 5, 2022 · Permit 22 224616 HVA
- Closed
Addition or alteration · Interior alterations
Interior alterations to Unit 128 - Rogers Sportsnet
Applied Apr 7, 2022 · issued Apr 25, 2022 · completed Oct 28, 2022 · Permit 22 131737 BLD
- Closed
Heating and ventilation
HVAC - Interior alterations to Unit 128 - Rogers Sportsnet
Applied Apr 7, 2022 · issued May 18, 2022 · completed Sep 23, 2022 · Permit 22 131737 HVA
- Closed
Plumbing
Plumbing - Interior alterations to Unit 128 - Rogers Sportsnet
Applied Apr 7, 2022 · issued May 18, 2022 · completed Sep 26, 2022 · Permit 22 131737 PLB
- Inspections under way
Addition or alteration · Interior alterations
Renovation to an existing Tim Horton's on the second floor of the Rogers building.
Applied Oct 6, 2021 · issued Oct 22, 2021 · Permit 21 222336 BLD
- Closed
Heating and ventilation
HVAC - Renovation to an existing Tim Horton's on the second floor of the Rogers building.
Applied Oct 6, 2021 · issued Nov 8, 2021 · completed Oct 14, 2025 · Permit 21 222336 HVA
- Closed
Heating and ventilation
Revision 01 - to modify existing edit suite on 8th floor HVAC - Interior demolition to existing office space on 8th floor and construction of new office space for media production, work includes alterations to mechanical and electrical ancillary spaces
Applied Jun 29, 2021 · issued Jul 30, 2021 · completed May 26, 2023 · Permit 20 227717 HVA (revision 01)
- Closed
Addition or alteration · Interior alterations
Revision 01 - to modify an exist. office space into a new space for media production (editing suite) on the 8th floor.Proposal for interior alterations to demolish a portion of an existing office space on the 8th floor and construct a new space for media production. Scope of work also includes alterations to mechanical and electrical ancillary spaces plus exterior alterations for new mechanical units on the roof level.
Applied Jun 29, 2021 · issued Jul 21, 2021 · completed Jul 24, 2023 · Permit 20 227717 BLD (revision 01)
- Closed
Fire and security upgrade
FS - Sprinkler Shop Drawing - Interior demolition to existing office space on 8th floor and construction of new office space for media production, work includes alterations to mechanical and electrical ancillary spaces
Applied Dec 15, 2020 · issued Apr 21, 2021 · completed Apr 21, 2021 · Permit 20 227717 FSU
- Closed
Addition or alteration · Other
Proposal for interior alterations to demolish a portion of an existing office space on the 8th floor and construct a new space for media production. Scope of work also includes alterations to mechanical and electrical ancillary spaces plus exterior alterations for new mechanical units on the roof level.
Applied Dec 10, 2020 · issued Feb 11, 2021 · completed Jul 24, 2023 · Permit 20 227717 BLD
- Closed
Heating and ventilation
HVAC - Interior demolition to existing office space on 8th floor and construction of new office space for media production, work includes alterations to mechanical and electrical ancillary spaces
Applied Dec 10, 2020 · issued Feb 11, 2021 · completed May 26, 2023 · Permit 20 227717 HVA
- Closed
Plumbing
Plumbing - Interior demolition to existing office space on 8th floor and construction of new office space for media production, work includes alterations to mechanical and electrical ancillary spaces
Applied Dec 10, 2020 · issued Feb 11, 2021 · completed May 8, 2023 · Permit 20 227717 PLB
- Permit issued
Addition or alteration · Other
Proposed reconstruction of the concrete ramp and repairs to the Huntley Street ramp for entry to an existing office building.
Applied May 9, 2019 · issued May 27, 2019 · Permit 19 151838 BLD
- Closed
Fire and security upgrade · Electromagnetic locks
Installation of four (4) maglocks in P2 Parking level
Applied Mar 13, 2019 · issued Mar 25, 2019 · completed Aug 6, 2019 · Permit 19 125037 FSU
- Closed
Addition or alteration · Other
Proposed insallation of four new door opening devices in an existing office building.
Applied Nov 5, 2018 · issued Nov 29, 2018 · completed Jul 5, 2019 · Permit 18 252542 BLD
- Closed
Plumbing
Revision #2 - Revision including addition of DHW tanks for sinks and specification of hot water tank as per bubbled drawings.Plumbing Revision #1 - interior layout and finishes to the 4th floor of existing office - "Rogers Communications"
Applied Aug 7, 2018 · issued Aug 31, 2018 · completed Oct 2, 2018 · Permit 17 276160 PLB (revision 02)
- Closed
Addition or alteration · Interior alterations
Interior Alterations to office space on the 15th floor.
Applied Jun 1, 2018 · issued Jun 18, 2018 · completed Feb 7, 2019 · Permit 18 170023 BLD
- Closed
Heating and ventilation
HVAC - Interior Alterations to office space on the 15th floor.
Applied Jun 1, 2018 · issued Jul 5, 2018 · completed Jul 17, 2018 · Permit 18 170023 HVA
- Closed
Plumbing
Plumbing - Interior Alterations to office space on the 15th floor.
Applied Jun 1, 2018 · issued Jul 5, 2018 · completed Jul 18, 2018 · Permit 18 170023 PLB
- Closed
Fire and security upgrade · Electromagnetic locks
Add maglocks to 4th floor south elevator lobby.
Applied May 23, 2018 · issued May 24, 2018 · completed Oct 17, 2018 · Permit 18 163818 FSU
- Closed
Heating and ventilation
HVAC Revision #1 - interior layout and finishes to the 4th floor of existing office - "Rogers Communications"
Applied Mar 29, 2018 · issued Apr 19, 2018 · completed Oct 2, 2018 · Permit 17 276160 HVA (revision 01)
- Closed
Plumbing
Plumbing Revision #1 - interior layout and finishes to the 4th floor of existing office - "Rogers Communications"
Applied Mar 29, 2018 · issued Apr 19, 2018 · completed Oct 2, 2018 · Permit 17 276160 PLB (revision 01)
- Closed
Addition or alteration · Interior alterations
Revision #1 - interior layout and finishes to the 4th floor of existing office - "Rogers Communications"
Applied Mar 29, 2018 · issued May 2, 2018 · completed Oct 18, 2018 · Permit 17 276160 BLD (revision 01)
- Permit issued
Heating and ventilation
HVAC - Full floor tenant. Splitting of one room into two edit suites
Applied Jan 2, 2018 · issued Jan 31, 2018 · Permit 18 100179 HVA
- Permit issued
Addition or alteration · Interior alterations
Full floor tenant. Splitting of one room into two edit suites
Applied Jan 2, 2018 · issued Jan 17, 2018 · Permit 18 100179 BLD
- Revision issued
Addition or alteration · Multiple projects
Revision 02 - as requested by Building Inspector for the P-1 Level Pre-action room. Sprinklers were changed from Pendnat to Upright only.Interior alterations to existing office space on 3rd floor & P1 level, alterations to existing mechanical & electrical ancillary spaces, and 2 new roof top chillers. Tenant - "Rogers".
Applied Dec 21, 2017 · issued Feb 2, 2018 · Permit 17 128410 BLD (revision 02)
- Inspections under way
Fire and security upgrade · Electromagnetic locks
Installation of an Electomagnetic Lock on the 6th Floor for the elevator lobby double doors
Applied Dec 20, 2017 · issued Jan 5, 2018 · Permit 17 278005 FSU
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to the 4th floor of existing office - "Rogers Communications"
Applied Dec 15, 2017 · issued Jan 17, 2018 · completed Oct 2, 2018 · Permit 17 276160 HVA
- Closed
Plumbing
Plumbing - Proposal for interior alterations to the 4th floor of existing office - "Rogers Communications"
Applied Dec 15, 2017 · issued Jan 17, 2018 · completed Oct 2, 2018 · Permit 17 276160 PLB
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to the 4th floor of existing office - "Rogers Communications"
Applied Dec 15, 2017 · issued Jan 17, 2018 · completed Oct 18, 2018 · Permit 17 276160 BLD
- Revision issued
Addition or alteration · Multiple projects
Revision 01 - Addition of sprinklersInterior alterations to existing office space on 3rd floor & P1 level, alterations to existing mechanical & electrical ancillary spaces, and 2 new roof top chillers. Tenant - "Rogers".
Applied Sep 22, 2017 · issued Oct 25, 2017 · Permit 17 128410 BLD (revision 01)
- Closed
Fire and security upgrade · Electromagnetic locks
Proposal to install 1 maglock on the 3rd floor of exiting office.
Applied Aug 16, 2017 · issued Aug 21, 2017 · completed Nov 14, 2017 · Permit 17 217753 FSU
- Closed
Heating and ventilation
HVAC - Interior alterations to existing office space on the ground floor - "Rogers OMP".
Applied Jul 31, 2017 · issued Sep 1, 2017 · completed Oct 14, 2025 · Permit 17 208529 HVA
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations to existing office space on the ground floor - "Rogers OMP".
Applied Jul 31, 2017 · issued Jul 31, 2017 · Permit 17 208529 BLD
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations to existing office space on the 6h floor. Tenant - "Rogers OMP".
Applied Jul 18, 2017 · issued Aug 18, 2017 · Permit 17 200541 BLD
- Closed
Plumbing
Plumbing - Interior alterations to existing office space on the 6h floor. Tenant - "Rogers OMP".
Applied Jul 18, 2017 · issued Aug 18, 2017 · completed Mar 20, 2026 · Permit 17 200541 PLB
- Permit issued
Heating and ventilation
HVAC - Interior alterations to existing office space on the 6h floor. Tenant - "Rogers OMP".
Applied Jul 18, 2017 · issued Aug 18, 2017 · Permit 17 200541 HVA
- Permit issued
Addition or alteration · Interior alterations
Interior alterations to partial ground floor office space (north portion of building). Tenant - "Rogers - OMP Creative Studio".
Applied May 2, 2017 · issued May 3, 2017 · Permit 17 152822 BLD
- Permit issued
Heating and ventilation
HVAC - Interior alterations to partial ground floor office space (north portion of building). Tenant - "Rogers - OMP Creative Studio".
Applied May 2, 2017 · issued May 18, 2017 · Permit 17 152822 HVA
- Permit issued
Plumbing
Plumbing - Interior alterations to partial ground floor office space (north portion of building). Tenant - "Rogers - OMP Creative Studio".
Applied May 2, 2017 · issued May 18, 2017 · Permit 17 152822 PLB
- Closed
Plumbing
Plumbing - Interior alterations to existing office space on 3rd floor & P1 level, alterations to existing mechanical & electrical ancillary spaces, and 2 new roof top chillers. Tenant - "Rogers".
Applied Mar 13, 2017 · issued Apr 11, 2017 · completed Mar 20, 2026 · Permit 17 128410 PLB
- Inspections under way
Addition or alteration · Multiple projects
Interior alterations to existing office space on 3rd floor & P1 level, alterations to existing mechanical & electrical ancillary spaces, and 2 new roof top chillers. Tenant - "Rogers".
Applied Mar 13, 2017 · issued Mar 22, 2017 · Permit 17 128410 BLD
- Inspections under way
Heating and ventilation
HVAC - Interior alterations to existing office space on 3rd floor & P1 level, alterations to existing mechanical & electrical ancillary spaces, and 2 new roof top chillers. Tenant - "Rogers".
Applied Mar 13, 2017 · issued Apr 11, 2017 · Permit 17 128410 HVA
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations to existing office space on the 9th floor. Tenant - "Rogers".
Applied Jan 27, 2017 · issued Feb 15, 2017 · Permit 17 109921 BLD
- Permit issued
Heating and ventilation
HVAC - Interior alterations to existing office space on the 9th floor. Tenant - "Rogers".
Applied Jan 27, 2017 · issued Feb 15, 2017 · Permit 17 109921 HVA
- Closed
Plumbing
Plumbing - Interior alterations to existing office space on the 9th floor. Tenant - "Rogers".
Applied Jan 27, 2017 · issued Feb 15, 2017 · completed Dec 13, 2017 · Permit 17 109921 PLB
- Revision issued
Plumbing
Revision to remove washroom from the scope of workPlumbing - Proposal for interior alterations to the 5th floor - "Rogers Communications"
Applied Sep 23, 2016 · issued Oct 11, 2016 · Permit 16 134751 PLB (revision 01)
- Revision issued
Addition or alteration · Interior alterations
Revision to remove washroom from the scope of workProposal for interior alterations to the 5th floor - "Rogers Communications"
Applied Sep 23, 2016 · issued May 16, 2017 · Permit 16 134751 BLD (revision 01)
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations to gas meter room to isolate Enbridge gas meter alcove from building.
Applied Apr 13, 2016 · issued May 12, 2016 · Permit 16 140069 BLD
- Permit issued
Heating and ventilation
HVAC - Proposal for interior alterations to the 2nd floor of existing office - "Rogers Communications"
Applied Apr 6, 2016 · issued Jun 7, 2016 · Permit 16 136706 HVA
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations to the 2nd floor of existing office - "Rogers Communications"
Applied Apr 6, 2016 · issued Jun 7, 2016 · Permit 16 136706 BLD
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations to the 5th floor - "Rogers Communications"
Applied Apr 1, 2016 · issued Apr 29, 2016 · Permit 16 134751 BLD
- Inspections under way
Plumbing
Plumbing - Proposal for interior alterations to the 5th floor - "Rogers Communications"
Applied Apr 1, 2016 · issued Apr 29, 2016 · Permit 16 134751 PLB
- Permit issued
Addition or alteration · Interior alterations
Proposal for interior alterations to existing office space on the 15th floor - Rogers Communications Inc
Applied Mar 22, 2016 · issued Mar 31, 2016 · Permit 16 130848 BLD
- Permit issued
Heating and ventilation
HVAC - Proposal for interior alterations to existing office space on the 15th floor - Rogers Communications Inc
Applied Mar 22, 2016 · issued Apr 18, 2016 · Permit 16 130848 HVA
- Permit issued
Heating and ventilation
HVAC - interior alterations to meeting room unit 900
Applied Jun 24, 2014 · issued Jul 30, 2014 · Permit 14 179853 HVA
- Permit issued
Addition or alteration · Interior alterations
interior alterations to meeting room unit 900
Applied Jun 24, 2014 · issued Jul 8, 2014 · Permit 14 179853 BLD
- Permit issued
Heating and ventilation
HVAC - To complete interior alterations to Suite 300 of the existing office building.
Applied Jun 24, 2014 · issued Jul 22, 2014 · Permit 14 179265 HVA
- Inspections under way
Fire and security upgrade · Sprinklers
Proposal to install a new pre-action and dry sprinkler system to existing data center on the 4th floor of existing building for "Rogers". Proposal also includes a hub drain
Applied May 26, 2014 · issued May 27, 2014 · Permit 14 161360 FSU
- Permit issued
Addition or alteration · Interior alterations
Proposal for interior alterations to unit #1600 in existing office building - "Rogers Communications"
Applied Mar 4, 2014 · issued Mar 14, 2014 · Permit 14 124303 BLD
- Permit issued
Plumbing
Plumbing - Proposal for interior alterations to unit #1600 in existing office building - "Rogers Communications"
Applied Mar 4, 2014 · issued Mar 14, 2014 · Permit 14 124303 PLB
- Cancelled
Designated structure · Sign building permit related
To erect and display one illuminated wall sign on the south-westerly corner on an existing structure.**Parking Lot**
Applied Jul 12, 2013 · completed Oct 2, 2019 · Permit 13 203721 DST
- Permit issued
Plumbing
Plumbing - no fixtures proposed, only piping for water cooler.Proposal for interior alterations to existing office space on the 5th floor - "Rogers".
Applied Jun 6, 2013 · issued Jun 20, 2013 · Permit 13 182849 PLB
- Permit issued
Addition or alteration · Interior alterations
Proposal for interior alterations to the 8th floor of existing office building "Rogers Communications" (83.8m2).
Applied Nov 5, 2012 · issued Nov 20, 2012 · Permit 12 273964 BLD
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to the 8th floor of existing office building "Rogers Communications" (83.8m2).
Applied Nov 5, 2012 · issued Nov 20, 2012 · completed Oct 14, 2025 · Permit 12 273964 HVA
- Permit issued
Heating and ventilation
HVAC - Proposal for interior alterations to existing office space on floors 7 and 8 - Rogers.
Applied Oct 25, 2011 · issued Nov 1, 2011 · Permit 11 298432 HVA
- Closed (dormant)
Plumbing
Plumbing - This is to take up two existing parking spots for a new hand car wash area. This is going to be used only for employees of Rogers Communication Inc. The hand car wash area will be located at the 3rd level below grade parking area at south east portion of the parking garage. There are typical floor plan(s) and a letter indicating the area and number of parking spots for zoning purposes.
Applied Nov 8, 2010 · issued Nov 26, 2010 · completed Jun 8, 2026 · Permit 10 293119 PLB
- Closed (dormant)
Plumbing
Plumbing - permit for interior alterations to existing office space - Floors 2, 4, 5 and 13 - Elevator lobby on floors 4,5,13 and Mail room on second floor.
Applied Jun 30, 2010 · issued Jul 21, 2010 · completed Jun 8, 2026 · Permit 10 209657 PLB
- Closed
Heating and ventilation
HVAC - permit for interior alterations to existing office space - floor 3 - Sportsnet floor.For plans see building permit file.
Applied May 5, 2010 · issued May 13, 2010 · completed Jul 9, 2025 · Permit 10 169602 HVA
- Closed
Plumbing · Backflow prevention devices (Water only)
Proposal to install 2 backflow preventors.
Applied Oct 23, 2009 · issued Nov 13, 2009 · completed May 27, 2026 · Permit 09 181792 PSA
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations for a new UPS (uninterupted power supply) plant on parking level P3 of a multi unit building.
Applied Jun 19, 2009 · issued Aug 5, 2009 · Permit 09 152194 BLD
- Closed (dormant)
Plumbing
Plumbing - Proposal for interior alterations for a new UPS (uninterupted power supply) plant on parking level P3 of a multi unit building.
Applied Jun 19, 2009 · issued Aug 5, 2009 · completed Jun 8, 2026 · Permit 09 152194 PLB
- Closed (dormant)
Heating and ventilation
HVAC - Proposal for interior alterations for a new UPS (uninterupted power supply) plant on parking level P3 of a multi unit building.
Applied Jun 19, 2009 · issued Aug 14, 2009 · completed Jun 8, 2026 · Permit 09 152194 HVA
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to the 5th floor office space for existing tenant Rogers Communications Inc. (1270.9m2).
Applied Jan 23, 2009 · issued Feb 17, 2009 · completed May 27, 2026 · Permit 09 104436 HVA
- Closed
Plumbing
Plumbing - Interior alterations to a number of floors in order to install a new standby power generator plant on the roof (not life safety).
Applied Dec 23, 2008 · issued Jan 21, 2009 · completed Jul 9, 2026 · Permit 08 231562 PLB
- Closed (dormant)
Heating and ventilation
HVAC - Interior alterations to a number of floors in order to install a new standby power generator plant on the roof (not life safety).
Applied Dec 23, 2008 · issued Jan 21, 2009 · completed Jun 8, 2026 · Permit 08 231562 HVA
- Closed (dormant)
Heating and ventilation
HVAC - Proposal for interior alterations to 4th floor office for existing tenant Rogers Communication (4806m2).
Applied Dec 17, 2008 · issued Jan 20, 2009 · completed Jun 8, 2026 · Permit 08 230189 HVA
- Closed (dormant)
Heating and ventilation
HVAC - Interior alterations to existing office space - floor 7, 8, 11 - Rogers
Applied Oct 28, 2008 · issued Dec 8, 2008 · completed Jun 8, 2026 · Permit 08 216380 HVA
- Closed
Heating and ventilation
HVAC - Interior alterations to existing office on the 10th floor. Part of Huntely Tower, OMP Tower, and Isabella Tower.
Applied Aug 28, 2008 · issued Oct 17, 2008 · completed May 27, 2026 · Permit 08 198119 HVA
- Closed
Heating and ventilation
HVAC - Make interior alterations to office.
Applied Nov 14, 2007 · issued Nov 20, 2007 · completed May 27, 2026 · Permit 07 278560 HVA
- Closed
Addition or alteration · Interior alterations
Make interior alterations to office.
Applied Nov 14, 2007 · issued Nov 20, 2007 · completed May 27, 2026 · Permit 07 278560 BLD
- Closed (dormant)
Addition or alteration · Interior alterations
Make interior alterations to kitchen area of cafeteria in office building.
Applied Nov 12, 2007 · issued Nov 20, 2007 · completed Jun 8, 2026 · Permit 07 278013 BLD
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations to existing office fitness area - floor 2.
Applied Nov 5, 2007 · issued Nov 13, 2007 · Permit 07 276212 BLD
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations to existing office space - floor 3 - Rogers
Applied Oct 11, 2007 · issued Nov 1, 2007 · Permit 07 269070 BLD
- Closed
Heating and ventilation
HVAC - Interior alterations to portion of existing Suite on 5th floor. Multi Tenant Floor
Applied Jul 16, 2007 · issued Jul 23, 2007 · completed May 27, 2026 · Permit 07 243279 HVA
- Closed
Addition or alteration · Interior alterations
Interior alterations to portion of existing Suite on 5th floor. Multi Tenant Floor
Applied Jul 16, 2007 · issued Jul 23, 2007 · completed May 27, 2026 · Permit 07 243279 BLD
- Inspections under way
Heating and ventilation
HVAC - interior alterations to exisitng office space - interior alterations to 9th floor
Applied Jun 11, 2007 · issued Jun 19, 2007 · Permit 07 230298 HVA
- Inspections under way
Addition or alteration · Interior alterations
interior alterations to exisitng office space - interior alterations to 9th floor
Applied Jun 11, 2007 · issued Jun 19, 2007 · Permit 07 230298 BLD
- Permit issued
Heating and ventilation
HVAC - Interior alterations to existing office on the 3rd floor.
Applied Jun 5, 2007 · issued Jun 13, 2007 · Permit 07 227933 HVA
- Inspections under way
Plumbing
Plumbing - Interior alterations to existing office on the 3rd floor.
Applied Jun 5, 2007 · issued Jun 12, 2007 · Permit 07 227933 PLB
- Closed
Heating and ventilation
HVAC - Interior alterations to the ground floor to construct a television broadcast facility, no audience
Applied Apr 11, 2007 · issued Apr 26, 2007 · completed Sep 8, 2026 · Permit 07 148386 HVA
- Inspections under way
Heating and ventilation
HVAC - Interior alterations to existing office on the 13th floor.
Applied Feb 8, 2007 · issued Feb 12, 2007 · Permit 07 108093 HVA
- Closed
Addition or alteration · Interior alterations
Interior alterations to existing office on the 13th floor.
Applied Feb 8, 2007 · issued Feb 12, 2007 · completed May 27, 2026 · Permit 07 108093 BLD
- Closed
Heating and ventilation
HVAC - Interior alterations at the second floor office space to remove and relocate partition
Applied Feb 5, 2007 · issued Feb 9, 2007 · completed Sep 8, 2026 · Permit 07 106806 HVA
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations to existing office on portion of ground floor.
Applied Nov 30, 2006 · issued Dec 5, 2006 · Permit 06 195136 BLD
- Closed
Fire and security upgrade · Electromagnetic locks
Install 1 maglock on 3rd floor
Applied Sep 1, 2005 · issued Sep 12, 2005 · completed May 27, 2026 · Permit 05 177248 FSU
- Inspections under way
Non-residential building permit · Addition/Alteration to existing building
build ring-parapet around building. historical
Applied Nov 23, 1999 · issued Mar 3, 2000 · Permit 99 112051 COM
- Closed
Fire and security upgrade · Unknown
Provide sprinkler shop drawings with respect to building permit application no. 393727. Peter au is familiar. Edc cost included in 393727
Applied Dec 15, 1997 · issued Aug 4, 1998 · completed Sep 8, 2026 · Permit 97 025203 FSU
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To permit the replacement of 4 new mechanical units.
Decision: Approved (hearing Apr 9, 2025)
Filed Feb 11, 2025 · File A0116/25TEY
What’s planned nearby
Development sites within 500 m
- Under review
47-65 Huntley Street, 8-26 Linden Street and 1-11 Selby Street
59 storeys · Mixed use
110 m away · Site plan · Under review · filed Apr 29, 2022
- Under review
112-124 Isabella Street, 30-40 Huntley Street and 1 Mount Pleasant Road
60 storeys · 1,362 homes · Residential
110 m away · Site plan · Under review · filed Dec 11, 2025
- Under review
69 storeys · 837 homes · Mixed use
210 m away · Site plan · Under review · filed May 30, 2022
- Under review
63 storeys · 675 homes · Mixed use
210 m away · Site plan · Under review · filed Jul 6, 2022
- Approved
- Under review
29 storeys · 213 homes · Residential
220 m away · Site plan · Under review · filed Aug 18, 2022
Neighbours’ Committee of Adjustment files within 250 m
235 Bloor St E · Minor variance
150 m away · filed Aug 31, 2026 · Postponed
10 Huntley St · Consent
To obtain consent to sever the property into two lots to differentiate the retained lands (existing 20-storey apartment) from the development lands (proposed 45-storey residential building), and to create reciprocal access easements/rights-of-way.
230 m away · filed Mar 24, 2025 · Postponed
387 Bloor St E · Minor variance
To reallocate residential occupants parking spaces to be used for the hotel use, increasing hotel parking to 139 spaces.
240 m away · filed Apr 5, 2022 · Approved
92 Isabella St · Minor variance
To alter the existing three-storey office building by constructing a new elevator and a new dormer over the elevator shaft.
210 m away · filed Feb 8, 2021 · Approved
387 Bloor St E · Minor variance
To alter the under construction 52-storey mixed-use building containing residential, retail and hotel uses by constructing five additional stories.
240 m away · filed Apr 23, 2019 · Approved
592 Sherbourne St · Minor variance
To alter the redevelopment plan approved under Site-specific By-law 276-2015 for a 50-storey mixed-use building by increasing the maximum permitted non-residential gross floor area.
240 m away · filed Jan 24, 2018 · Approved
123 Isabella St · Minor variance
To convert the existing three-storey hospice care facility containing 9 beds into a residential care facility for a transitional residence containing 20 rooms.
210 m away · filed Mar 31, 2017 · Approved
365 Bloor St E · Minor variance
To alter the existing mixed-use development by installing an emergency generator on the podium roof.
210 m away · filed Oct 26, 2016 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.