Toronto address · Ward 5, York South-Weston
1 Seneca Ave
The City of Toronto has 7 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · New laneway / rear yard suite
Construct a new two storey laneway suite in the rear yard of an existing one storey detached single family dwelling.
Applied Mar 7, 2022 · issued Mar 23, 2022 · 1 home added · Permit 22 120058 BLD
- Revocation pending
Plumbing
Plumbing - Construct a new two storey laneway suite in the rear yard of an existing one storey detached single family dwelling.
Applied Mar 7, 2022 · issued Mar 23, 2022 · Permit 22 120058 PLB
- Permit issued
Drains and site services
Drain - Construct a new two storey laneway suite in the rear yard of an existing one storey detached single family dwelling.
Applied Mar 7, 2022 · issued Mar 23, 2022 · Permit 22 120058 DRN
- Revocation pending
Heating and ventilation
HVAC - Construct a new two storey laneway suite in the rear yard of an existing one storey detached single family dwelling.
Applied Mar 7, 2022 · issued Mar 23, 2022 · Permit 22 120058 HVA
- Closed
Plumbing
Plumbing - Proposal to underpin and finish basement, interior alterations to ground floor, new front and rear deck.
Applied Jul 31, 2018 · issued Aug 16, 2018 · completed May 18, 2022 · Permit 18 202636 PLB
- Closed
Small residential project · Multiple projects
Proposal to underpin and finish basement, interior alterations to ground floor, new front and rear deck.
Applied Jul 31, 2018 · issued Aug 16, 2018 · completed May 18, 2022 · Permit 18 202636 BLD
- Closed
Drains and site services
Drain - Proposal to underpin and finish basement, interior alterations to ground floor, new front and rear deck.
Applied Jul 31, 2018 · issued Aug 16, 2018 · completed Aug 6, 2019 · Permit 18 202636 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
12 storeys · 263 homes · Residential
430 m away · Rezoning · Under appeal · filed Mar 17, 2022
Neighbours’ Committee of Adjustment files within 250 m
380 Weston Rd · Consent
40 m away · filed Jul 17, 2026 · Accepted
39 Seneca Ave · Minor variance
To legalize and to maintain a second and third storey addition above the existing dwelling and the conversion into a duplex dwelling. This application is being considered as a new duplex dwelling.
120 m away · filed Jul 22, 2025 · Approved
47 Lapp St · Minor variance
To construct a new laneway suite in the rear yard.
230 m away · filed May 16, 2023 · Approved
32 Avon Ave · Minor variance
To enclose the existing stairs in the rear yard. A previous Committee of Adjustment application (A0905/18EYK) approved variances related to the side yard setback, length and depth.
180 m away · filed Mar 9, 2023 · Approved
36 Cayuga Ave · Minor variance
To construct a detached garage in the rear yard.
90 m away · filed Aug 27, 2020 · Approved
346 Weston Rd · Consent
Section 57(1) of The Planning Act allows the assignment of authority to the Secretary-Treasurer, Committee of Adjustment or his/her designate to approve a Validation of Title.
100 m away · filed May 29, 2019 · Approved
32 Avon Ave · Minor variance
To construct a one-storey rear addition, a new front porch, and a rear yard deck.
180 m away · filed Dec 10, 2018 · Approved
30 Cayuga Ave · Minor variance
To construct a new detached dwelling that is currently under construction. A previous Committee of Adjustment application (A0276/18EYK) approved a new dwelling with variances relating to floor space index, side yard setback of the building, side yard setback of the eaves, and exterior stairs.
80 m away · filed Dec 5, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.