Toronto address · Ward 13, Toronto Centre
10 Parkview Ave
The City of Toronto has 4 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - Underpinning exsiting basement (42.16 lm) and finishing basement (73.5m2)
Applied Jan 26, 2017 · issued Feb 7, 2017 · completed Nov 20, 2020 · Permit 17 109608 PLB
- Closed
Small residential project · Multiple projects
Underpinning exsiting basement (42.16 lm) and finishing basement (73.5m2)
Applied Jan 26, 2017 · issued Feb 7, 2017 · completed Apr 12, 2021 · Permit 17 109608 BLD
- Closed
Drains and site services
Drain - Underpinning exsiting basement (42.16 lm) and finishing basement (73.5m2)
Applied Jan 26, 2017 · issued Feb 7, 2017 · completed Nov 20, 2020 · Permit 17 109608 DRN
- Closed
Small residential project · Addition(s)
Proposal to construct a 2nd sty rear addition. See Final & Binding - A0632/07TEY and open BLD permit for interior alterations - 07 240328.
Applied Nov 22, 2007 · issued Jul 31, 2008 · completed Apr 26, 2021 · Permit 07 281007 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
451 Wellesley St E · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear screened enclosure (replacing the ground floor deck), and rear second and third floor additions. The existing rear ground, second and third floor decks will be demolished.
90 m away · filed Sep 9, 2025 · Approved
5 Parkview Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a new rear third storey dormer addition. Also, to reconstruct the rear second storey balcony.
40 m away · filed Jul 17, 2024 · Approved
37 Hill Crest Pk · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition. Also, to reconstruct the wood deck (along the front, east side, and rear wall), and to construct a rear yard parking pad.
240 m away · filed Sep 27, 2023 · Approved
116 Amelia St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, and a third storey addition with a rooftop deck.
180 m away · filed Jan 30, 2023 · Approved
82 Salisbury Ave · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a third storey rear addition (dormer).
230 m away · filed Dec 14, 2022 · Approved
92 Amelia St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a third storey addition, a rear third storey roof deck, a new rear ground floor addition (to replace the existing addition), and a rear second storey roof deck. This dwelling will have a total of two residential units.
230 m away · filed Oct 25, 2022 · Approved
499 Sackville St · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a rear two-storey addition, as approved by Minor Variance Application A0370/22TEY. The current application is necessitated to identify a depth variance to the altered dwelling (as cited in the variance below).
220 m away · filed Aug 25, 2022 · Approved
499 Sackville St · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a rear two-storey addition.
220 m away · filed Mar 29, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.