Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

100 Glenaden Ave E

The City of Toronto has 6 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    REV 01: changes to layoutPlumbing - Proposal to construct a new two storey detached dwelling complete with a covered rear yard deck and a second floor balcony.

    Applied May 6, 2026 · Permit 25 158710 PLB (revision 01)

    Application acceptable
  • New house · New building

    Proposal to construct a new two storey detached dwelling complete with a covered rear yard deck and a second floor balcony.

    Applied May 13, 2025 · issued May 30, 2025 · 1 home added · Permit 25 158710 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct a new two storey detached dwelling complete with a covered rear yard deck and a second floor balcony.

    Applied May 13, 2025 · issued May 30, 2025 · Permit 25 158710 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct a new two storey detached dwelling complete with a covered rear yard deck and a second floor balcony.

    Applied May 13, 2025 · issued May 30, 2025 · Permit 25 158710 PLB

    Inspections under way
  • Drains and site services

    Drain - Proposal to construct a new two storey detached dwelling complete with a covered rear yard deck and a second floor balcony.

    Applied May 13, 2025 · issued May 30, 2025 · Permit 25 158710 DRN

    Inspections under way
  • Demolition

    Proposal to demolish existing one storey dwelling and construct a new two storey dwelling.

    Applied May 13, 2025 · issued May 30, 2025 · completed Feb 23, 2026 · 1 home removed · Permit 25 158736 DEM

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new detached dwelling with an attached garage.

    Decision: Approved (hearing Mar 20, 2025)

    Filed Nov 7, 2024 · File A0451/24EYK

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 107 Riverwood Pkwy · Minor variance

    To construct a second storey addition above the existing dwelling, a partial third storey addition, a rear ground floor deck and a second storey platform. A previous Committee of Adjustment application (A0139/25EYK) approved variances related to gross floor area and side yard setback.

    60 m away · filed Jun 9, 2026 · Approved

  • 67 Sunnylea Ave E · Minor variance

    To construct a new detached dwelling with an attached garage.

    230 m away · filed Jul 28, 2025 · Approved

  • 107 Riverwood Pkwy · Minor variance

    To construct a one-storey addition above the existing dwelling, and a one-storey front addition.

    60 m away · filed Apr 4, 2025 · Approved

  • 81 Glenaden Ave E · Minor variance

    To construct a new detached dwelling with an attached garage.

    130 m away · filed Nov 30, 2022 · Approved

  • 75 Sunnylea Ave E · Minor variance

    To construct a new detached dwelling with an attached garage.

    180 m away · filed Aug 30, 2021 · Approved

  • 102 Riverwood Pkwy · Minor variance

    To construct a two-storey east and south side addition.

    160 m away · filed Dec 10, 2019 · Approved

  • 85 Glenaden Ave E · Minor variance

    To construct a new detached dwelling with an attached garage.

    100 m away · filed Jul 16, 2018 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.