Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

100 Vaughan Rd

The City of Toronto has 28 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing · Fixtures/Roof Drains: other

    Proposal to install a new dishwasher in an existing residential suite - UNIT 007

    Applied Jun 23, 2021 · issued Aug 10, 2021 · Permit 21 174984 PSA

    Permit issued
  • Plumbing · Other

    repair and replacement of water risers for existing apartment building.

    Applied Jun 1, 2020 · issued Oct 15, 2020 · Permit 20 150999 PSA

    Inspections under way
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Cosmetic upgrades to unit # 17

    Applied Mar 17, 2020 · completed Jul 28, 2020 · Permit 20 119732 FSU

    Cancelled
  • Addition or alteration · Interior alterations

    Proposal for cosmetic upgrades to Unit 23 located on level 3.

    Applied Mar 14, 2020 · issued May 1, 2020 · completed Nov 1, 2022 · Permit 20 126204 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for cosmetic upgrades to Unit 23.

    Applied Mar 14, 2020 · issued May 26, 2020 · completed Dec 31, 2020 · Permit 20 126204 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for cosmetic upgrades to Unit 23.

    Applied Mar 14, 2020 · issued May 26, 2020 · completed Dec 7, 2020 · Permit 20 126204 PLB

    Closed
  • Plumbing

    Plumbing - Interior alterations to unit 16

    Applied Mar 13, 2020 · issued Apr 27, 2020 · completed Jul 27, 2020 · Permit 20 126122 PLB

    Cancelled
  • Addition or alteration · Interior alterations

    Interior alterations to unit 16

    Applied Mar 13, 2020 · issued Apr 9, 2020 · completed Jul 27, 2020 · Permit 20 126122 BLD

    Cancelled
  • Heating and ventilation

    HVAC - Interior alterations to unit 16

    Applied Mar 13, 2020 · issued Apr 27, 2020 · completed Jul 27, 2020 · Permit 20 126122 HVA

    Cancelled
  • Plumbing

    Plumbing - Cosmetic upgrades to unit # 17

    Applied Feb 27, 2020 · issued Apr 14, 2020 · completed Jul 27, 2020 · Permit 20 119732 PLB

    Cancelled
  • Addition or alteration · Interior alterations

    Cosmetic upgrades to unit # 09

    Applied Feb 27, 2020 · completed Jun 2, 2020 · Permit 20 119726 BLD

    Cancelled
  • Heating and ventilation

    HVAC - Cosmetic upgrades to unit # 09

    Applied Feb 27, 2020 · completed Jun 2, 2020 · Permit 20 119726 HVA

    Cancelled
Show 16 more permits
  • Heating and ventilation

    HVAC - Cosmetic upgrades to unit # 17

    Applied Feb 27, 2020 · issued Mar 17, 2020 · completed Jul 27, 2020 · Permit 20 119732 HVA

    Cancelled
  • Plumbing

    Plumbing - Cosmetic upgrades to unit # 09

    Applied Feb 27, 2020 · completed Jun 2, 2020 · Permit 20 119726 PLB

    Cancelled
  • Addition or alteration · Interior alterations

    Cosmetic upgrades to unit # 17

    Applied Feb 27, 2020 · issued Mar 17, 2020 · completed Jul 28, 2020 · Permit 20 119732 BLD

    Cancelled
  • Heating and ventilation

    Applied Dec 23, 2019 · completed Apr 11, 2024 · Permit 19 264354 HVA

    Cancelled
  • Addition or alteration · Other

    Proposal for interior alterations in common area of building {AS PER FEES AS AS PAID]

    Applied Dec 23, 2019 · issued Jan 9, 2020 · completed Sep 12, 2024 · Permit 19 264354 BLD

    Cancelled
  • Plumbing

    Plumbing - Proposal for interior alterations in common area of building and addition of a new concrete ramp at front of building.

    Applied Dec 23, 2019 · completed Apr 11, 2024 · Permit 19 264354 PLB

    Cancelled
  • Addition or alteration · Multiple projects

    Proposal for localized repairs to exterior brick masonry, precast concrete, window sill and lintel repairs, window perimeter joint sealant replacement to the existing Apartment Building.

    Applied Dec 4, 2019 · issued Jun 18, 2020 · completed Nov 24, 2022 · Permit 19 257199 BLD

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install a back flow preventer for the domestic water system

    Applied Sep 27, 2019 · issued Nov 15, 2019 · completed Nov 14, 2020 · Permit 19 228057 PSA

    Closed
  • Fire and security upgrade · Fire alarm

    Proposal upgrade to fire alarm system in existing apartment.

    Applied Jun 27, 2019 · issued Aug 13, 2019 · completed Jan 21, 2021 · Permit 19 179923 FSU

    Closed
  • Fire and security upgrade · Fire alarm

    Proposal to replace fire alarm system audibility upgrade.

    Applied Jun 27, 2019 · completed Jul 10, 2019 · Permit 19 179863 FSU

    Cancelled
  • Addition or alteration · Interior alterations

    Proposal for Interior Alterations to the Existing 2-Bedroom Apartment Unit (Unit #31), in an Existing Apartment Building. (No changes to the existing size of the unit & number of the bedrooms in the unit).

    Applied Jun 12, 2019 · issued Jul 31, 2019 · Permit 19 170563 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for cosmetic upgrades to the 2 bed room apartment unit 31

    Applied Jun 12, 2019 · issued Aug 9, 2019 · completed May 23, 2020 · Permit 19 170563 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for cosmetic upgrades to the 2 bed room apartment unit 31

    Applied Jun 12, 2019 · issued Aug 9, 2019 · completed May 22, 2020 · Permit 19 170563 PLB

    Closed
  • Addition or alteration · Interior alterations

    Cosmetic upgrade for unit # 02

    Applied Jun 5, 2019 · issued Aug 1, 2019 · completed Jan 21, 2020 · Permit 19 166158 BLD

    Closed
  • Plumbing

    Plumbing - Cosmetic upgrade for unit # 02

    Applied Jun 5, 2019 · issued Aug 1, 2019 · completed Jan 20, 2020 · Permit 19 166158 PLB

    Closed
  • Heating and ventilation

    HVAC - Cosmetic upgrade for unit # 02

    Applied Jun 5, 2019 · issued Aug 1, 2019 · completed Jan 20, 2020 · Permit 19 166158 HVA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 40 Raglan Avenue

    37 storeys · 355 homes · Mixed use

    90 m away · Site plan · Approved · filed Sep 16, 2022

    Approved
  • 10-32 Raglan Avenue

    34 storeys · 440 homes · Mixed use

    100 m away · Site plan · Approved · filed Apr 11, 2022

    Approved
  • 129-141 Vaughan Road

    153 homes · Residential

    120 m away · Condominium · Approved · filed Oct 14, 2025

    Approved
  • 536-538 St Clair Avenue West

    35 storeys · 380 homes · Mixed use

    140 m away · Site plan · Under review · filed Aug 23, 2022

    Under review
  • 5-15 Raglan Avenue

    28 storeys · 210 homes · Residential

    150 m away · Condominium · Under review · filed Nov 1, 2021

    Under review
  • 146-150 Vaughan Road

    17 storeys · 110 homes · Mixed use

    170 m away · Site plan · Under review · filed Jun 24, 2026

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 1500 Bathurst St · Minor variance

    To alter the existing 13-storey detached mixed-use building by converting the existing six non-residential units on the ground level into nine non-residential units. The building will contain a total of 120 rental residential dwelling units and nine non-residential units.

    200 m away · filed Sep 1, 2026 · Hearing scheduled

  • 211 Wychwood Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear second storey addition (above the existing rear one-storey addition), a canopy over the existing front porch, a rear basement walkout and a rear ground floor deck with stairs. The existing front second storey balcony will be removed. There will be a total of two residential dwelling units on this lot (one unit within the basement and one unit on the first and second storeys).

    210 m away · filed May 28, 2026 · Approved

  • 205 Wychwood Ave · Minor variance

    To construct a new three-storey detached building (houseplex), with a front covered porch, a side (south) ground floor canopy, third storey front, side (south) and rear balconies (on the roof of the second storey) serving Units A, B and C respectively, a front and side (south) rooftop deck (shared by both Unit A and B, on the roof of the third storey), a rear rooftop deck (for Unit C, on the roof of the third storey), and three rooftop staircase access enclosures. Also, to construct a rear two-storey detached ancillary building (containing one laneway suite), abutting the laneway, with an at-…

    190 m away · filed Jan 27, 2026 · Approved

  • 24 Ellsworth Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition (including basement extension) with a rear first storey deck with stairs. Also, to reconstruct the front porch with stairs.

    220 m away · filed Dec 11, 2025 · Approved

  • 26 Ellsworth Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a partial rear third storey addition above the existing rear building footprint.

    220 m away · filed Dec 11, 2025 · Approved

  • 54 Vaughan Rd · Minor variance

    To permit a residential use below a non-residential use within the existing two-storey mixed-use building by converting the existing vacantbasement into a new two-bedroom residential dwelling unit. The ground floor commercial use (hair salon) will be maintained and there will be a total of two residential dwelling units within the building on the lot (one dwelling unit in the basement and one dwelling unit on the second storey).

    230 m away · filed Sep 4, 2025 · Approved

  • 5 Raglan Ave · Minor variance

    To alter the development standards (as approved by site-specific Zoning By-law No. 531-2024(OLT)) for the 28-storey mixed-use building to increase the building height to 34 storeys, increase the gross floor area and modify building setbacks. There will be a total of 236 residential dwelling units on this lot. This is currently under the review of Site Plan Control (File No. 21 232984 STE 12 SA).

    180 m away · filed May 20, 2025 · Refused

  • 40 Raglan Ave · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-laws 1051-2022 and 1052-2022) for a 36-storey mixed-use building (including a mechanical penthouse), to permit indoor amenity space on the rooftop. There will be a total of 352 residential dwelling units (of which 62 units will be rental replacement units) on this lot. Committee of Adjustment considered and approved variances to the Zoning By-law under Minor Variance Decision A0686/24TEY, however the construction alterations necessitates further minor variances.

    110 m away · filed Apr 11, 2025 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.