1016A Pape Ave
The City of Toronto has 4 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Heating and ventilation
HVAC - CONVERT EXISTING RETIAL STORE TO SUBWAY SANDWICH SHOPSHORT-ROUTE - Change of Use
Applied Oct 15, 2003 · issued Oct 16, 2003 · Permit 03 138771 HVA (revision 02)
- Closed (dormant)
Heating and ventilation
HVAC - CONVERT EXISTING RETIAL STORE TO SUBWAY SANDWICH SHOPSHORT-ROUTE - Change of Use
Applied Aug 13, 2003 · issued Sep 17, 2003 · completed Jun 8, 2026 · Permit 03 138771 HVA
- Permit issued
Plumbing
Plumbing - CONVERT EXISTING RETIAL STORE TO SUBWAY SANDWICHE SHOP - Change of Use
Applied May 30, 2003 · issued Aug 13, 2003 · Permit 03 138771 PLB
- Inspections under way
Addition or alteration · Change of use
Convert existing retial store to subway sandwiche shopshort-route
Applied May 30, 2003 · issued Aug 13, 2003 · Permit 03 138771 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
25 storeys · 299 homes · Residential
440 m away · Site plan · Under review · filed Apr 26, 2022
- Under review
8-40 Gowan Avenue and 5-19 Cosburn Avenue
24 storeys · 424 homes · Residential
460 m away · Site plan · Under review · filed Apr 26, 2022
Neighbours’ Committee of Adjustment files within 250 m
139 Floyd Ave · Minor variance
To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).
220 m away · filed Feb 23, 2026 · Hearing scheduled
139 Floyd Ave · Consent
To obtain consent to sever the property into three undersized residential lots.
220 m away · filed Feb 23, 2026 · Hearing scheduled
139 Floyd Ave · Minor variance
To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).
220 m away · filed Feb 23, 2026 · Hearing scheduled
139 Floyd Ave · Minor variance
To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, as well as front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).
220 m away · filed Feb 23, 2026 · Hearing scheduled
185 Gowan Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a detached ancillary building (gazebo) in the rear yard.
120 m away · filed Oct 11, 2022 · Approved
952 Pape Ave · Minor variance
To construct a one-storey ancillary structure (detached garage) in the rear yard, abutting the laneway.
220 m away · filed Jan 11, 2022 · Approved
193 Gowan Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear one-storey addition and rear deck.
140 m away · filed Jun 19, 2019 · Approved
101 Cosburn Ave · Minor variance
To alter the existing nine-storey apartment building by converting a three bedroom unit and superintendent office into two one-bedroom units.
60 m away · filed Jun 3, 2019 · Withdrawn
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.