Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

1018 Pape Ave

The City of Toronto has 5 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal for residential second floor addition, first floor addition for new entrance to second floor, interior alterations in basement.

    Applied Apr 22, 2020 · completed Nov 12, 2024 · Permit 20 119877 HVA

    Cancelled
  • Addition or alteration · Multiple projects

    Proposal for residential second floor addition, first floor addition for new entrance to second floor, interior alterations in basement.

    Applied Feb 27, 2020 · completed Nov 12, 2024 · 1 home added · Permit 20 119877 BLD

    Cancelled
  • Plumbing

    Plumbing - Make interior alterations to existing retail store for Doctor's office & pharmacy. - Interior Alterations

    Applied May 4, 2004 · issued May 27, 2004 · Permit 04 130608 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Make interior alterations to existing retail store for Doctor's office & pharmacy.

    Applied May 4, 2004 · issued May 27, 2004 · Permit 04 130608 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Make interior alterations to existing retail store for Doctor's office & pharmacy. - Interior Alterations

    Applied May 4, 2004 · issued May 27, 2004 · Permit 04 130608 HVA

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To convert the existing one-storey commercial building into a mixed use building by constructing a second storey addition containing one dwelling unit, a rear one-storey addition, and converting a portion of the basement to commercial use.

    Decision: Approved (hearing Jun 26, 2019)

    Filed Dec 3, 2018 · File A1146/18TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 139 Floyd Ave · Consent

    To obtain consent to sever the property into three undersized residential lots.

    230 m away · filed Feb 23, 2026 · Hearing scheduled

  • 139 Floyd Ave · Minor variance

    To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).

    230 m away · filed Feb 23, 2026 · Hearing scheduled

  • 139 Floyd Ave · Minor variance

    To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).

    230 m away · filed Feb 23, 2026 · Hearing scheduled

  • 139 Floyd Ave · Minor variance

    To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, as well as front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).

    230 m away · filed Feb 23, 2026 · Hearing scheduled

  • 185 Gowan Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a detached ancillary building (gazebo) in the rear yard.

    130 m away · filed Oct 11, 2022 · Approved

  • 952 Pape Ave · Minor variance

    To construct a one-storey ancillary structure (detached garage) in the rear yard, abutting the laneway.

    230 m away · filed Jan 11, 2022 · Approved

  • 193 Gowan Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear one-storey addition and rear deck.

    150 m away · filed Jun 19, 2019 · Approved

  • 101 Cosburn Ave · Minor variance

    To alter the existing nine-storey apartment building by converting a three bedroom unit and superintendent office into two one-bedroom units.

    50 m away · filed Jun 3, 2019 · Withdrawn

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.