Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

102 Lake Promenade

The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Revision #01 - Changes to completely replace existing HVAC and to interior ductwork layout. HVAC - To construct side addition, interior alterations, extend existing rear deck and underpinning to existing dwelling

    Applied Sep 11, 2020 · issued Sep 21, 2020 · completed Mar 1, 2021 · Permit 19 211981 HVA (revision 01)

    Closed
  • Heating and ventilation

    HVAC - To construct side addition, interior alterations, extend existing rear deck and underpinning to existing dwelling

    Applied Aug 28, 2019 · issued Aug 18, 2020 · completed Mar 1, 2021 · Permit 19 211981 HVA

    Closed
  • Plumbing

    Plumbing - To construct side addition, interior alterations, extend existing rear deck and underpinning to existing dwelling

    Applied Aug 28, 2019 · issued Aug 18, 2020 · completed Mar 1, 2021 · Permit 19 211981 PLB

    Closed
  • Small residential project · Multiple projects

    To construct side addition, interior alterations, extend existing rear deck and underpinning to existing dwelling

    Applied Aug 26, 2019 · issued Aug 18, 2020 · completed Mar 18, 2021 · Permit 19 211981 BLD

    Closed
  • Small residential project · Porch

    Proposal to construct a new front porch and front facade upgrades

    Applied Nov 8, 2018 · issued Nov 29, 2018 · completed Mar 18, 2021 · Permit 18 253800 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · NR addition

    To construct a two-storey east side addition, a new front porch and to enlarge the existing rear deck.

    Decision: Approved (hearing Jun 25, 2020)

    Filed Jan 8, 2020 · File A0005/20EYK

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 21 Arcadian Crcl · Minor variance

    To construct a new detached dwelling with an attached garage.

    200 m away · filed Jul 7, 2026 · Tentatively scheduled

  • 31 Elton Cres · Minor variance

    To construct a new detached garage in the rear yard.

    170 m away · filed Dec 8, 2025 · Approved

  • 12 Twenty Fifth St · Minor variance

    To construct a two-storey south side addition, a partial second storey addition, a new front porch and a rear yard deck.

    230 m away · filed Nov 19, 2025 · Approved

  • 72 Arcadian Crcl · Minor variance

    To construct a partial second storey addition and an attached garage along the north side of the property.

    220 m away · filed Sep 11, 2025 · Approved

  • 25 Arcadian Crcl · Minor variance

    To construct a new detached dwelling with an attached garage.

    230 m away · filed Feb 4, 2025 · Approved

  • 155 Lake Promenade · Minor variance

    To legalize and to maintain interior and exterior alterations to the existing dwelling.

    230 m away · filed Jun 5, 2024 · Approved

  • 99 Lake Promenade · Minor variance

    To construct a new detached dwelling with an attached garage.

    70 m away · filed Nov 7, 2023 · Approved

  • 7 Elton Cres · Minor variance

    To construct a new detached dwelling with an attached garage.

    70 m away · filed Oct 6, 2023 · Deferred

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.