Toronto address · Ward 14, Toronto-Danforth
1022 Queen St E
The City of Toronto has 4 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - Proposal to convert existing electric commercial appliances to gas commercial appliances.
Applied Aug 19, 2025 · issued Sep 12, 2025 · completed May 22, 2026 · Permit 25 190121 PLB
- Closed
Addition or alteration · Other
Proposal to convert existing electric commercial appliances to gas commercial appliances.
Applied Jul 8, 2025 · issued Aug 1, 2025 · completed May 22, 2026 · Permit 25 190121 BLD
- Closed
Heating and ventilation
HVAC - Proposal to convert existing electric commercial appliances to gas commercial appliances.
Applied Jul 8, 2025 · issued Aug 19, 2025 · completed May 15, 2026 · Permit 25 190121 HVA
- Permit issued
Plumbing · Backflow prevention devices (Water only)
Intallation of a backflow prevention device to existing building
Applied Jul 19, 2022 · issued Sep 13, 2022 · Permit 22 178713 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
9 storeys · 78 homes · Mixed use
200 m away · Site plan · Approved · filed May 3, 2023
- Under appeal
- Approved
462 Eastern Avenue and 150 Logan Avenue
1 storeys · Residential
480 m away · Condominium · Approved · filed Oct 21, 2024
Neighbours’ Committee of Adjustment files within 250 m
929 Queen St E · Minor variance
To alter the development standards for the 9-storey mixed-use building (35 m in height to the top of the mechanical penthouse) containing commercial uses on the ground and mezzanine floors with side (west) second-floor terraces and a side (east) rooftop amenity terrace (approved under Site Specific Zoning By-Law 291-2024), by increasing the metric height of the first, second, sixth, and eighth storeys (by 0.7 m, 2.45 m, 0.5 m, and 0.4 m respectively), with a maximum building height of 35 m to the top of the ninth storey (excluding the mechanical penthouse). Also, to increase the total gross f…
180 m away · filed Apr 15, 2026 · Approved
14 Blong Ave · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony.
230 m away · filed Apr 22, 2025 · Approved
53 Boston Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition (with basement extension below), a rear ground floor deck with stairs (the existing rear deck and stairs will be demolished), and a rear basement walkout.
150 m away · filed Dec 3, 2024 · Approved
43 Boston Ave · Minor variance
To alter the existing two-storey rowhouse dwelling by constructing a new front basement walkout with stairs for the purposes of accommodating a secondary suite. Also, to reconstruct the rear ground level deck. There will be two dwellings on the lot (duplex).
130 m away · filed Sep 5, 2024 · Approved
174 Pape Ave · Minor variance
To construct a new two-storey ancillary building (detached garage with two parking spaces on the ground floor and laneway suite above), in the rear yard, abutting the laneway. The existing one-storey ancillary building (detached garage) will be demolished. The existing two-and-one-half-storey detached dwelling on the lot will be maintained and unaltered. There will be a total of two residential dwelling units on the lot (one unit within the main dwelling and one unit within the ancillary building).
210 m away · filed Aug 8, 2024 · Approved
972 Queen St E · Minor variance
To convert the existing three-storey mixed-use building (972 Queen Street East) (containing one commercial ground floor unit and one vacant residential unit on the second and third floors) and rear two-storey ancillary building (181A Carlaw Avenue) (containing one ground floor vacant commercial unit and one vacant residential unit on the second floor) into a commercial use. There will be no residential dwelling units on the lot and no parking spaces on-site provided.
110 m away · filed May 29, 2024 · Approved
25 Boston Ave · Minor variance
To legalize and to maintain the existing ancillary structure (carport) at the rear of the property, abutting the laneway.
80 m away · filed Nov 9, 2023 · Approved
29 Boston Ave · Minor variance
To construct a one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.
80 m away · filed Sep 27, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.