Toronto address · Ward 11, University-Rosedale
103 Beatrice St
The City of Toronto has 2 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Garage
Proposal to construct a detached garage.
Applied Jun 9, 2017 · issued Jun 16, 2017 · completed Mar 9, 2020 · Permit 17 177084 BLD
- Closed
Drains and site services · Inside and outside drains
Proposal to install one back water valve, new sanitary line and floor drains.
Applied Jan 31, 2012 · issued Jan 31, 2012 · completed Aug 5, 2025 · Permit 12 114576 STS
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a rear detached garage.
Decision: Refused (hearing Sep 22, 2016)
Filed May 27, 2016 · Appeal: OMB approved · File A0590/16TEY
What’s planned nearby
Development sites within 500 m
- Under appeal
Neighbours’ Committee of Adjustment files within 250 m
37 Henderson Ave · Minor variance
To construct a new three-storey detached building (houseplex) with front and rear first storey juliet balconies, as well as, front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).
180 m away · filed Jul 28, 2026 · Hearing scheduled
646 College St · Minor variance
To convert the existing three-storey mixed-use building into a commercial building by converting the existing second floor storage space and third floor residential dwelling unit into commercial use (office spaces). There will be no residential dwelling units on this lot.
250 m away · filed Apr 8, 2026 · Approved
644 College St · Minor variance
To convert the existing three-storey mixed-use building into a commercial building by converting the existing third floor residential dwelling unit into commercial use (office space). There will be no residential dwelling units on this lot.
250 m away · filed Apr 8, 2026 · Approved
25 Montrose Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third storey addition with a rear balcony, a rear ground floor deck with stairs, and a rear basement walkout on the south side of the dwelling. Also, to convert the basement into one residential dwelling unit. There will be a total of two residential dwelling units on this lot (one unit occupying the basement level, and one unit occupying the first, second, and third storeys). The existing rear one-storey detached ancillary building (one-car garage) will be maintained and unaltered.
190 m away · filed Apr 2, 2026 · Approved
100 Beatrice St · Consent
40 m away · filed Mar 9, 2026 · Postponed
33 Beatrice St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear one-storey addition along the north side of the existing one-storey addition (including an extension to the basement area and the second storey rooftop deck). Also, to reconstruct the rear basement walkout stairs. There will be a total of two residential dwelling units on this lot (one unit occupying the basement and one unit occupying the first, second, and third storeys).
160 m away · filed Jul 17, 2025 · Approved
81 Montrose Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition (Mezzanine), a rear first and second floor addition and a rear third floor balcony. The existing ancillary building (garage) in the rear yard will be maintained and unaltered.
90 m away · filed Apr 24, 2025 · Postponed
647 College St · Minor variance
To convert the existing three-storey mixed-use building into a residential apartment building, and to construct a rear ground floor patio. There will be a total of six residential dwelling units on this lot (one unit within the basement, one unit on the ground level, two units on the second level, and two units on the third level). Also, four long-term bicycle parking spaces will be provided.
200 m away · filed Mar 3, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.