Toronto address · Ward 11, University-Rosedale
104 Beatrice St
The City of Toronto has 3 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal for a rear addition at third floor and interior alterations in the existing semi-detached house (3 units in total).
Applied Aug 29, 2023 · issued Dec 5, 2023 · completed Jan 17, 2025 · Permit 23 114283 HVA
- Inspections under way
Small residential project · Multiple projects
Proposal for a rear addition at third floor and interior alterations in the existing semi-detached house (3 units in total).
Applied Feb 15, 2023 · issued Aug 30, 2023 · Permit 23 114283 BLD
- Closed
Plumbing
Plumbing - Proposal for a rear addition at third floor and interior alterations in the existing semi-detached house (3 units in total).
Applied Feb 15, 2023 · issued Aug 31, 2023 · completed Jan 17, 2025 · Permit 23 114283 PLB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To legalize and to maintain the third storey rear addition that was constructed without an authorized building permit.
Decision: Approved (hearing Jun 21, 2023)
Filed Mar 30, 2023 · File A0322/23TEY
What’s planned nearby
Development sites within 500 m
- Under appeal
Neighbours’ Committee of Adjustment files within 250 m
37 Henderson Ave · Minor variance
To construct a new three-storey detached building (houseplex) with front and rear first storey juliet balconies, as well as, front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).
210 m away · filed Jul 28, 2026 · Hearing scheduled
644 College St · Minor variance
To convert the existing three-storey mixed-use building into a commercial building by converting the existing third floor residential dwelling unit into commercial use (office space). There will be no residential dwelling units on this lot.
220 m away · filed Apr 8, 2026 · Approved
646 College St · Minor variance
To convert the existing three-storey mixed-use building into a commercial building by converting the existing second floor storage space and third floor residential dwelling unit into commercial use (office spaces). There will be no residential dwelling units on this lot.
220 m away · filed Apr 8, 2026 · Approved
25 Montrose Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third storey addition with a rear balcony, a rear ground floor deck with stairs, and a rear basement walkout on the south side of the dwelling. Also, to convert the basement into one residential dwelling unit. There will be a total of two residential dwelling units on this lot (one unit occupying the basement level, and one unit occupying the first, second, and third storeys). The existing rear one-storey detached ancillary building (one-car garage) will be maintained and unaltered.
210 m away · filed Apr 2, 2026 · Approved
100 Beatrice St · Consent
20 m away · filed Mar 9, 2026 · Postponed
375 Shaw St · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a south side basement and ground floor additions (mudroom on the ground level) with a green roof and skylight (above the first level addition). The existing two-storey ancillary building (coach house with garage), in the rear yard, will be maintained and unaltered. There will be two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building).
250 m away · filed Dec 23, 2025 · Approved
33 Beatrice St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear one-storey addition along the north side of the existing one-storey addition (including an extension to the basement area and the second storey rooftop deck). Also, to reconstruct the rear basement walkout stairs. There will be a total of two residential dwelling units on this lot (one unit occupying the basement and one unit occupying the first, second, and third storeys).
200 m away · filed Jul 17, 2025 · Approved
81 Montrose Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition (Mezzanine), a rear first and second floor addition and a rear third floor balcony. The existing ancillary building (garage) in the rear yard will be maintained and unaltered.
80 m away · filed Apr 24, 2025 · Postponed
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.