Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

109 Boulton Ave

The City of Toronto has 8 building permits since 2017 (5 still open) and 4 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Drain - Proposal to construct a new single family home. Structure is a semi-detached buildingthat will be built at the same time as adjoining 109A

    Applied Jul 2, 2024 · issued Sep 11, 2024 · Permit 24 172251 DRN

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct a new single family home. Structure is a semi-detached buildingthat will be built at the same time as adjoining 109B

    Applied Jul 2, 2024 · issued Nov 14, 2024 · completed Jun 10, 2026 · Permit 24 172253 PLB

    Closed
  • Plumbing

    Plumbing - Proposal to construct a new single family home. Structure is a semi-detached buildingthat will be built at the same time as adjoining 109A

    Applied Jul 2, 2024 · issued Sep 11, 2024 · completed Jun 10, 2026 · Permit 24 172251 PLB

    Closed
  • Drains and site services

    Drain - Proposal to construct a new single family home. Structure is a semi-detached buildingthat will be built at the same time as adjoining 109B

    Applied Jul 2, 2024 · issued Nov 14, 2024 · Permit 24 172253 DRN

    Inspections under way
  • New house · New building

    Proposal to construct a new three-storey semi-detached dwelling with a front third storey terrace and one parking space on the north side yard of the property.

    Applied Jun 29, 2024 · issued Sep 11, 2024 · completed Jun 10, 2026 · 1 home added · Permit 24 172251 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct a new single family home. Structure is a semi-detached buildingthat will be built at the same time as adjoining 109A

    Applied Jun 29, 2024 · issued Sep 11, 2024 · Permit 24 172251 HVA

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct a new single family home. Structure is a semi-detached buildingthat will be built at the same time as adjoining 109B

    Applied Jun 29, 2024 · issued Nov 14, 2024 · Permit 24 172253 HVA

    Inspections under way
  • New house · New building

    Proposal to construct a new single family home. Structure is a semi-detached building that will be built at the same time as adjoining 109B.

    Applied Jun 29, 2024 · issued Nov 14, 2024 · 1 home added · Permit 24 172253 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Consent · Sever lot

    To obtain consent to sever an existing residential lot into three residential lots (of which two will be undersized), and to create an easement/right-of-way.

    Decision: Approved (hearing Apr 17, 2024)

    Filed Jan 24, 2024 · 3 new lots · File B0006/24TEY

    Closed
  • Minor variance · R addition

    To alter the existing two-storey detached dwelling by constructing a new south side basement walkout. Also, to remove the on-site parking space.

    Decision: Approved (hearing Apr 17, 2024)

    Filed Jan 24, 2024 · File A0089/24TEY

    Closed
  • Minor variance · New R building

    To construct a new three-storey semi-detached dwelling.

    Decision: Approved (hearing Apr 17, 2024)

    Filed Jan 24, 2024 · File A0090/24TEY

    Closed
  • Minor variance · New R building

    To construct a new three-storey semi-detached dwelling with a front third storey terrace and one parking space on the north side yard of the property.

    Decision: Approved (hearing Apr 17, 2024)

    Filed Jan 24, 2024 · File A0091/24TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 195 De Grassi St · Minor variance

    To legalize and to maintain the existing rear ground floor L-shaped deck with stairs, and a rear third floor rooftop deck (including a hot tub and a shower). This was all constructed without an authorized building permit, to the existing three-storey semi-detached dwelling.

    240 m away · filed May 20, 2026 · Approved

  • 162 Boulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a side (south) third floor balcony.

    190 m away · filed Apr 17, 2026 · Approved

  • 1000 Dundas St E · Minor variance

    To alter the existing two-and-a-half storey townhouse by constructing a front third storey addition.

    180 m away · filed Sep 15, 2023 · Approved

  • 70 Allen Ave · Consent

    To obtain consent to sever an existing residential lot into two undersized residential lots.

    180 m away · filed May 24, 2023 · Approved

  • 70 Allen Ave · Minor variance

    To construct a new three-storey semi-detached dwelling with a front porch with stairs and a rear third storey deck.

    180 m away · filed May 24, 2023 · Approved

  • 70 Allen Ave · Minor variance

    To construct a new three-storey semi-detached dwelling with a front porch with stairs and a rear third storey deck.

    180 m away · filed May 24, 2023 · Approved

  • 176 De Grassi St · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third storey addition, a rear three-storey addition, a third storey walkout deck, and a rear ground level deck.

    190 m away · filed May 4, 2022 · Approved

  • 161 Boulton Ave · Minor variance

    To construct a rear one-storey ancillary building to contain a gym and storage area.

    130 m away · filed Nov 16, 2021 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.