Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

195 De Grassi St

The City of Toronto has 3 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Deck

    Prop. Ground & third floor rear deck

    Applied Apr 13, 2026 · issued Aug 18, 2026 · Permit 26 142390 BLD

    Inspections under way
  • Small residential project · Interior alterations

    REV01: Revision to interior alterationsProposed interior alterations to remove non-load bearing wall in kitchen and reconstruct stairs

    Applied Nov 28, 2019 · issued Dec 6, 2019 · completed Mar 10, 2020 · Permit 19 218004 BLD (revision 01)

    Closed
  • Small residential project · Interior alterations

    Proposed interior alterations to remove non-load bering wall in kitchen and reconstruct stairs

    Applied Sep 9, 2019 · issued Sep 18, 2019 · completed Mar 10, 2020 · Permit 19 218004 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To legalize and to maintain the existing rear ground floor L-shaped deck with stairs, and a rear third floor rooftop deck (including a hot tub and a shower). This was all constructed without an authorized building permit, to the existing three-storey semi-detached dwelling.

    Decision: Approved (hearing Jul 8, 2026)

    Filed May 20, 2026 · File A0373/26TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 415 Broadview Avenue

    51 homes · Residential

    480 m away · Site plan · Under review · filed Apr 24, 2024

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 162 Boulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a side (south) third floor balcony.

    120 m away · filed Apr 17, 2026 · Approved

  • 242 Boulton Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by enclosing the existing front porch (for habitable space).

    200 m away · filed Sep 8, 2025 · Approved

  • 109 Boulton Ave · Consent

    To obtain consent to sever an existing residential lot into three residential lots (of which two will be undersized), and to create an easement/right-of-way.

    240 m away · filed Jan 24, 2024 · Approved

  • 109 Boulton Ave · Minor variance

    To construct a new three-storey semi-detached dwelling with a front third storey terrace and one parking space on the north side yard of the property.

    240 m away · filed Jan 24, 2024 · Approved

  • 109 Boulton Ave · Minor variance

    To construct a new three-storey semi-detached dwelling.

    240 m away · filed Jan 24, 2024 · Approved

  • 109 Boulton Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a new south side basement walkout. Also, to remove the on-site parking space.

    240 m away · filed Jan 24, 2024 · Approved

  • 183 First Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a west side third storey addition.

    210 m away · filed Sep 18, 2023 · Approved

  • 1000 Dundas St E · Minor variance

    To alter the existing two-and-a-half storey townhouse by constructing a front third storey addition.

    80 m away · filed Sep 15, 2023 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.