Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

109 Campbell Ave

The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Drain - Proposed 2-storey rear addition (39.1sqm) with interior alterations throughout

    Applied Mar 10, 2023 · issued Mar 10, 2023 · completed Jun 7, 2023 · Permit 22 213515 DRN

    Closed
  • Plumbing

    Plumbing - Proposed 2-storey rear addition (39.1sqm) with interior alterations throughout

    Applied Oct 5, 2022 · issued Mar 9, 2023 · completed Oct 27, 2023 · Permit 22 213515 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed 2-storey rear addition (39.1sqm) with interior alterations throughout

    Applied Oct 5, 2022 · issued Mar 9, 2023 · completed Oct 27, 2023 · Permit 22 213515 BLD

    Closed
  • Small residential project · Other

    Admin Permit to 107 Campbell Ave. (10-308828)

    Applied Dec 6, 2010 · issued Feb 4, 2011 · completed Feb 21, 2017 · Permit 10 308829 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition.

    Decision: Approved (hearing Feb 15, 2023)

    Filed Nov 3, 2022 · File A1210/22TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 149 Perth Ave · Minor variance

    To legalize and to maintain the existing one-storey detached dwelling (including one and two-storey rear additions) by constructing a front ground floor covered porch with stairs, a front second storey addition, and a new rear ground floor stairs (for the existing one-storey sunroom). The existing rear two-storey ancillary building (containing a garage and storage space) will be maintained and unaltered. There will be a total of three residential dwelling units on this lot.

    220 m away · filed Feb 3, 2026 · Approved

  • 193 Rankin Cres · Minor variance

    To alter the existing three-storey semi-detached dwelling by enclosing the rear third storey rooftop deck.

    90 m away · filed May 6, 2025 · Approved

  • 105 Campbell Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor addition, rear and south side second storey additions, a complete third storey addition, a new rear basement walkout, and rear external stairs on all levels. There will be a total of three residential units in this dwelling.

    10 m away · filed Jan 17, 2024 · Refused

  • 104 Campbell Ave · Minor variance

    To legalize and to maintain the rear ground level addition (enclosed basement walkout entrance) and the above rear second floor walkout deck that were constructed without an authorized building permit.

    80 m away · filed Dec 12, 2023 · Approved

  • 89 Symington Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear third storey deck, and a rear ground floor deck. Also, to construct a one-storey ancillary building (garden suite) in the rear yard.

    90 m away · filed Oct 30, 2023 · Approved

  • 105 Campbell Ave · Minor variance

    To convert the existing two-storey semi-detached dwelling from two dwelling units into three dwelling units by constructing a third storey addition and a rear three-storey addition. Also, to construct a new rear basement walkout, as well as a rear exterior three-storey staircase.

    10 m away · filed Jun 1, 2023 · Approved

  • 166 Campbell Ave · Minor variance

    To construct a new two-storey ancillary building (garage with laneway suite) in the rear yard of the property, abutting the laneway.

    180 m away · filed Mar 2, 2023 · Refused

  • 83 Campbell Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, and a complete third storey addition. Also, to construct a rear one-storey ancillary building (office space).

    130 m away · filed Nov 3, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.