Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

166 Campbell Ave

The City of Toronto has 5 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal to construct laneway suite in rear yard of existing Single Family Dwelling

    Applied Nov 5, 2024 · issued Nov 12, 2024 · completed Feb 7, 2025 · Permit 22 186648 PLB

    Closed
  • Small residential project · Other

    Demolish existing garage at rear of house.Minimum 2.6 X 5.0 m parking to remain

    Applied Apr 4, 2023 · issued Apr 4, 2023 · Permit 23 130551 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Proposal to construct laneway suite in rear yard of existing Single Family Dwelling

    Applied Aug 5, 2022 · issued Feb 1, 2024 · completed Feb 7, 2025 · Permit 22 186648 HVA

    Closed
  • Small residential project · New laneway / rear yard suite

    Proposal to construct laneway suite in rear yard of existing Single Family Dwelling

    Applied Aug 5, 2022 · issued Mar 11, 2024 · completed Feb 7, 2025 · 1 home added · Permit 22 186648 BLD

    Closed
  • Small residential project · Porch

    To reconstruct a front porch, existing roof to remain

    Applied Aug 7, 2007 · issued Aug 7, 2007 · completed Aug 19, 2021 · Permit 07 250606 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new two-storey ancillary building (garage with laneway suite) in the rear yard of the property, abutting the laneway.

    Decision: Refused (hearing May 17, 2023)

    Filed Mar 2, 2023 · File A0210/23TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 209 Symington Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (including a basement level) with a covered deck and stairs.

    170 m away · filed Jul 28, 2026 · Approved

  • 261 Perth Ave · Minor variance

    To alter the existing semi-detached dwelling by constructing a partial rear second storey addition (that will partially be cantilevered), and a front basement walkout with stairs. There are two residential dwelling units in this dwelling.

    160 m away · filed Jul 7, 2026 · Approved

  • 193 Rankin Cres · Minor variance

    To alter the existing three-storey semi-detached dwelling by enclosing the rear third storey rooftop deck.

    160 m away · filed May 6, 2025 · Approved

  • 182 Symington Ave · Minor variance

    To construct a one-storey ancillary building (detached garage) in the rear yard, abutting Royce Lane.

    110 m away · filed Nov 7, 2024 · Approved

  • 105 Campbell Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor addition, rear and south side second storey additions, a complete third storey addition, a new rear basement walkout, and rear external stairs on all levels. There will be a total of three residential units in this dwelling.

    190 m away · filed Jan 17, 2024 · Refused

  • 89 Symington Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear third storey deck, and a rear ground floor deck. Also, to construct a one-storey ancillary building (garden suite) in the rear yard.

    210 m away · filed Oct 30, 2023 · Approved

  • 105 Campbell Ave · Minor variance

    To convert the existing two-storey semi-detached dwelling from two dwelling units into three dwelling units by constructing a third storey addition and a rear three-storey addition. Also, to construct a new rear basement walkout, as well as a rear exterior three-storey staircase.

    190 m away · filed Jun 1, 2023 · Approved

  • 109 Campbell Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition.

    180 m away · filed Nov 3, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.