Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

261 Perth Ave

The City of Toronto has 8 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    REV 01: Proposed front walkoutProposal for second storey rear addition, interior alterations and second unit.

    Applied Apr 16, 2026 · Permit 25 256960 BLD (revision 01)

    Examiner's notice sent
  • Drains and site services

    Drain - Proposal for second storey rear addition, interior alterations and second unit.

    Applied Nov 21, 2025 · issued Feb 26, 2026 · Permit 25 256960 DRN

    Permit issued
  • Small residential project · Multiple projects

    Proposal for second storey rear addition, interior alterations and second unit.

    Applied Nov 21, 2025 · issued Feb 26, 2026 · 1 home added · Permit 25 256960 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for second storey rear addition, interior alterations and second unit.

    Applied Nov 21, 2025 · issued Feb 26, 2026 · Permit 25 256960 PLB

    Permit issued
  • Heating and ventilation

    HVAC - Proposal for second storey rear addition, interior alterations and second unit.

    Applied Nov 21, 2025 · issued Feb 26, 2026 · Permit 25 256960 HVA

    Permit issued
  • Plumbing

    Plumbing - Proposed interior alterations for new bathroom on ground floor of existing single family dwelling.

    Applied Oct 4, 2023 · issued Oct 19, 2023 · completed Jun 14, 2024 · Permit 23 210877 PLB

    Closed
  • Small residential project · Interior alterations

    Proposed interior alterations for new bathroom on ground floor of existing single family dwelling.

    Applied Oct 4, 2023 · issued Oct 12, 2023 · completed Jun 14, 2024 · Permit 23 210877 BLD

    Closed
  • Small residential project · Garage

    Pres: semi-detached house Prop: sameDesc: rebuild garage at rear. (card printed)

    Applied Oct 1, 2002 · issued Oct 1, 2002 · completed Sep 26, 2025 · Permit 02 177518 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing semi-detached dwelling by constructing a partial rear second storey addition (that will partially be cantilevered), and a front basement walkout with stairs. There are two residential dwelling units in this dwelling.

    Decision: Approved (hearing Sep 2, 2026)

    Filed Jul 7, 2026 · File A0508/26TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 209 Symington Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (including a basement level) with a covered deck and stairs.

    150 m away · filed Jul 28, 2026 · Approved

  • 182 Symington Ave · Minor variance

    To construct a one-storey ancillary building (detached garage) in the rear yard, abutting Royce Lane.

    60 m away · filed Nov 7, 2024 · Approved

  • 5 Ruskin Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch, a rear two-storey addition, a partial third storey addition with a rooftop deck (located on the east side), and a rear ground floor deck.

    120 m away · filed Aug 8, 2023 · Approved

  • 166 Campbell Ave · Minor variance

    To construct a new two-storey ancillary building (garage with laneway suite) in the rear yard of the property, abutting the laneway.

    160 m away · filed Mar 2, 2023 · Refused

  • 151 Campbell Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a new basement secondary suite for a total of three residential units within this dwelling. A total of two parking spaces will be provided on-site (one within the rear detached garage and one rear yard parking pad).

    210 m away · filed Sep 9, 2022 · Approved

  • 276 Wallace Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear second storey rear addition that will be partially cantilevered above the existing rear deck.

    230 m away · filed Aug 18, 2022 · Approved

  • 130 Symington Ave · Minor variance

    To construct a two-storey rear addition, a front basement walkout and a rear yard deck,

    170 m away · filed Jul 27, 2022 · Approved

  • 371 Wallace Ave · Minor variance

    To alter the existing four-storey apartment building by constructing a one-storey addition above the three-storey portion of this building, for Unit 28. The existing rooftop deck will be maintained.

    220 m away · filed Apr 19, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.