Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

5 Ruskin Ave

The City of Toronto has 3 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposed two storey addition, third storey addition for roof deck access, interior alterations, front covered porch, east side third storey roof deck and rear ground floor deck

    Applied Dec 11, 2023 · issued Jan 5, 2024 · completed Oct 10, 2025 · Permit 23 234345 HVA

    Closed
  • Plumbing

    Plumbing - Proposed two storey addition, third storey addition for roof deck access, interior alterations, front covered porch, east side third storey roof deck and rear ground floor deck

    Applied Dec 11, 2023 · issued Dec 29, 2023 · completed Oct 10, 2025 · Permit 23 234345 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed two storey addition, third storey addition for roof deck access, interior alterations, front covered porch, east side third storey roof deck and rear ground floor deck

    Applied Dec 11, 2023 · issued Dec 29, 2023 · completed Apr 13, 2026 · Permit 23 234345 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch, a rear two-storey addition, a partial third storey addition with a rooftop deck (located on the east side), and a rear ground floor deck.

    Decision: Approved (hearing Sep 20, 2023)

    Filed Aug 8, 2023 · File A0686/23TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 209 Symington Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (including a basement level) with a covered deck and stairs.

    180 m away · filed Jul 28, 2026 · Approved

  • 261 Perth Ave · Minor variance

    To alter the existing semi-detached dwelling by constructing a partial rear second storey addition (that will partially be cantilevered), and a front basement walkout with stairs. There are two residential dwelling units in this dwelling.

    120 m away · filed Jul 7, 2026 · Approved

  • 182 Symington Ave · Minor variance

    To construct a one-storey ancillary building (detached garage) in the rear yard, abutting Royce Lane.

    170 m away · filed Nov 7, 2024 · Approved

  • 265 Symington Ave · Minor variance

    To construct a new two-storey ancillary building (containing one laneway suite), in the rear yard, abutting the laneway. There will be two dwelling units on this lot.

    250 m away · filed Apr 6, 2024 · Approved

  • 371 Wallace Ave · Minor variance

    To alter the existing four-storey apartment building by constructing a one-storey addition above the three-storey portion of this building, for Unit 28. The existing rooftop deck will be maintained.

    230 m away · filed Apr 19, 2022 · Approved

  • 315 Perth Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition.

    100 m away · filed Apr 11, 2022 · Approved

  • 317 Perth Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition.

    100 m away · filed Apr 11, 2022 · Approved

  • 234 Perth Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition.

    210 m away · filed Mar 31, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.