Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

109 Wesley St

The City of Toronto has 5 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    REVISION#1: Unfinished basement-revision for the building permit. removal of second suite in basement.Proposed second storey addition, interior alterations, new rear deck and basement walkout, and proposed secondary suite in basement of existing one-storey detached dwelling.

    Applied Jan 20, 2020 · issued Feb 21, 2020 · Permit 19 115256 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Proposed second storey addition, interior alterations, new rear deck and basement walkout, and proposed secondary suite in basement of existing one-storey detached dwelling.

    Applied Feb 14, 2019 · issued Apr 2, 2019 · Permit 19 115256 HVA

    Inspections under way
  • Small residential project · Multiple projects

    Proposed second storey addition, interior alterations, new rear deck and basement walkout, and proposed secondary suite in basement of existing one-storey detached dwelling.

    Applied Feb 14, 2019 · issued Apr 2, 2019 · 1 home added · Permit 19 115256 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposed second storey addition, interior alterations, new rear deck and basement walkout, and proposed secondary suite in basement of existing one-storey detached dwelling.

    Applied Feb 14, 2019 · issued Apr 2, 2019 · Permit 19 115256 PLB

    Inspections under way
  • Drains and site services

    Drain - Proposed second storey addition, interior alterations, new rear deck and basement walkout, and proposed secondary suite in basement of existing one-storey detached dwelling.

    Applied Feb 14, 2019 · issued Apr 2, 2019 · Permit 19 115256 DRN

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a second storey addition which will cantilever at the rear, and to permit a secondary suite.

    Decision: Approved (hearing Nov 22, 2018)

    Filed Oct 3, 2018 · File A0741/18EYK

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 135 Milton St · Minor variance

    To construct a new detached dwelling with an attached garage.

    250 m away · filed Jun 8, 2022 · Approved

  • 96 Wesley St · Consent

    To obtain consent to sever the lot into two undersized residential lots.

    80 m away · filed Jun 4, 2020 · Approved

  • 96 Wesley St · Minor variance

    To construct a new detached dwelling with an attached garage.

    80 m away · filed Jun 4, 2020 · Approved

  • 96 Wesley St · Minor variance

    To construct a new detached dwelling with an attached garage.

    80 m away · filed Jun 4, 2020 · Approved

  • 689 The Queensway · Minor variance

    To permit a temporary sales office.

    220 m away · filed Aug 23, 2019 · Approved

  • 681 The Queensway · Minor variance

    To make interior alterations to an existing spa and to permit a parking deficiency.

    210 m away · filed Jan 22, 2019 · Approved

  • 135 Milton St · Consent

    To obtain consent to sever the property into two undersized residential lots.

    250 m away · filed Jun 25, 2018 · Refused

  • 135 Milton St · Minor variance

    To construct a new detached dwelling with an integral garage.

    250 m away · filed Jun 25, 2018 · Refused

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.