Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

11 Edwin Ave

The City of Toronto has 3 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Interior alteration of ground floor and second floor. To include renovation of kitchen,addition of new exterior openings, relocation of second floor bathroom.

    Applied Oct 9, 2018 · issued Oct 25, 2018 · completed Jan 5, 2026 · Permit 18 224725 HVA

    Closed
  • Plumbing

    Plumbing - Interior alteration of ground floor and second floor. To include renovation of kitchen,addition of new exterior openings, relocation of second floor bathroom.

    Applied Sep 13, 2018 · issued Sep 14, 2018 · completed Jan 5, 2026 · Permit 18 224725 PLB

    Closed
  • Small residential project · Interior alterations

    Interior alteration of ground floor and second floor. To include renovation of kitchen,addition of new exterior openings, relocation of second floor bathroom.

    Applied Sep 13, 2018 · issued Sep 14, 2018 · completed Jan 5, 2026 · Permit 18 224725 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 96 Edwin Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front second storey dormer, and a rear one-storey addition, a second storey addition with a deck, and a ground level deck.

    210 m away · filed Mar 10, 2025 · Approved

  • 28 Jerome St · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front one-storey addition (porch enclosure).

    220 m away · filed Feb 26, 2025 · Approved

  • 2591 Dundas St W · Minor variance

    To construct a new three-storey medical office building.

    230 m away · filed Feb 7, 2025 · Application withdrawn

  • 12 Abbott Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third storey addition, a rear one and two-storey additions (with a green rooftop above the rear one-storey addition), and a rear basement window well with a rear canopy above.

    240 m away · filed May 24, 2024 · Approved

  • 5 Ruskin Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch, a rear two-storey addition, a partial third storey addition with a rooftop deck (located on the east side), and a rear ground floor deck.

    180 m away · filed Aug 8, 2023 · Approved

  • 2531 Dundas St W · Minor variance

    To construct a new one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.

    160 m away · filed Nov 14, 2022 · Approved

  • 317 Perth Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition.

    240 m away · filed Apr 11, 2022 · Approved

  • 1611 Dupont St · Minor variance

    To convert the existing two-storey mixed-use building into an eating establishment on the ground and basement levels and office space on the second storey. Also, to construct a rear basement addition, a rear ground-level outdoor patio and a rear second-storey deck. The existing ground-level commercial unit and second-storey residential unit will be removed.

    250 m away · filed Nov 22, 2021 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.