Toronto address · Ward 18, Willowdale
11 Winlock Pk
The City of Toronto has 6 building permits since 2017 (6 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
New house · New building
Construction of proposed 3-storey dwelling with attached garage and front & rear covered porches
Applied Dec 7, 2023 · issued Jan 26, 2024 · 1 home added · Permit 23 233601 BLD
- Permit issued
Demolition
Demolish existing 1 storey dwelling
Applied Dec 7, 2023 · issued Jan 26, 2024 · 1 home removed · Permit 23 233612 DEM
- Inspections under way
Heating and ventilation
HVAC - Construction of proposed 3-storey dwelling with attached garage and front & rear covered porches
Applied Dec 7, 2023 · issued Jan 26, 2024 · Permit 23 233601 HVA
- Inspections under way
Plumbing
Plumbing - Construction of proposed 3-storey dwelling with attached garage and front & rear covered porches
Applied Dec 7, 2023 · issued Jan 26, 2024 · Permit 23 233601 PLB
- Inspections under way
Drains and site services
Drain - Construction of proposed 3-storey dwelling with attached garage and front & rear covered porches
Applied Dec 7, 2023 · issued Jan 26, 2024 · Permit 23 233601 DRN
- Inspections under way
Small residential project · Addition(s)
Patio room/open deck
Applied Apr 2, 1998 · issued Apr 27, 1998 · Permit 98 251686 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Approved with conditions
Minor variance · New R building
Proposal to construct a new dwelling.
Decision: Approved (hearing Aug 10, 2023)
Filed Jul 7, 2023 · File A0359/23NY
What’s planned nearby
Development sites within 500 m
- Under review
4 storeys · Residential
170 m away · Rezoning · Under review · filed Aug 8, 2024
- Approved
8 homes · Residential
170 m away · Condominium · Approved · filed Mar 25, 2025
- Approved
7 storeys · 40 homes · Residential
440 m away · Rezoning · Approved · filed May 28, 2025
- Under review
4 storeys · Residential
440 m away · Site plan · Under review · filed Apr 26, 2022
Neighbours’ Committee of Adjustment files within 250 m
261 Finch Ave E · Minor variance
Proposal to permit a Pharmacy and Medical Walk-in Clinic.
190 m away · filed Jun 12, 2024 · Refused
241 Finch Ave E · Minor variance
Proposal to construct a three-storey townhouse with 8 residential units.
170 m away · filed Dec 8, 2023 · Refused
260 Olive Ave · Minor variance
To construct a second floor above the existing garage.
240 m away · filed Dec 17, 2020 · Closed
26 Maxome Ave · Consent
To obtain consent to sever a portion of the land for the purpose of a lot addition, to create three new lots.
140 m away · filed Nov 3, 2016 · Approved
28 Maxome Ave · Consent
To obtain consent to sever a portion of the land for the purpose of a lot addition, to create three new lots.
150 m away · filed Nov 3, 2016 · Approved
26 Maxome Ave · Minor variance
To construct a new two-storey dwelling. The existing dwelling would be demolished. Please note, file numbers B0082/16NY, B0083/16NY, A0955/16NY, A0956/16NY and A0957/16NY, will be considered jointly.
140 m away · filed Nov 3, 2016 · Approved
26 Maxome Ave · Minor variance
To construct a new two-storey dwelling. The existing dwelling would be demolished. Please note, file numbers B0082/16NY, B0083/16NY, A0955/16NY, A0956/16NY and A0957/16NY, will be considered jointly.
140 m away · filed Nov 3, 2016 · Approved
26 Maxome Ave · Minor variance
To construct a new two-storey dwelling. The existing dwelling would be demolished. Please note, file numbers B0082/16NY, B0083/16NY, A0955/16NY, A0956/16NY and A0957/16NY, will be considered jointly.
140 m away · filed Nov 3, 2016 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.