Toronto address · Ward 18, Willowdale
241 Finch Ave E
The City of Toronto has 46 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Drains and site services · Site service
Proposal to install site services for 8 townhomes.
Applied Jun 4, 2025 · issued Jul 9, 2025 · Permit 25 171593 STS
- Closed
Designated structure · Sign building permit related
Apply for permit to build a ground sign
Applied Apr 16, 2025 · issued Apr 28, 2025 · completed Oct 24, 2025 · Permit 25 145660 DST
- Closed
New house · New building
Revision 01: The building height and rear setback angel have been adjusted according to the attached TLAB decision order, to the proposed 3-storey townhouse project which received the building permit on Sep.18,2023. The ceiling height of the third floor has been revised to 9 feet. The 2nd & 3rd floor layouts of Unit 8 have been revised accordingly. LOT 8 - UNIT A8Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Aug 15, 2024 · issued Oct 11, 2024 · completed Nov 12, 2025 · Permit 22 211450 B08 (revision 01)
- Closed
New house · New building
Revision 01: The building height and rear setback angel have been adjusted according to the attached TLAB decision order, to the proposed 3-storey townhouse project which received the building permit on Sep.18,2023. The ceiling height of the third floor has been revised to 9 feet. The 2nd & 3rd floor layouts of Unit 8 have been revised accordingly. LOT 7 - UNIT A7Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Aug 15, 2024 · issued Oct 11, 2024 · completed Nov 12, 2025 · Permit 22 211450 B07 (revision 01)
- Closed
New house · New building
Revision 01: The building height and rear setback angel have been adjusted according to the attached TLAB decision order, to the proposed 3-storey townhouse project which received the building permit on Sep.18,2023. The ceiling height of the third floor has been revised to 9 feet. The 2nd & 3rd floor layouts of Unit 8 have been revised accordingly. LOT 6 - UNIT A6Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Aug 15, 2024 · issued Oct 11, 2024 · completed Nov 12, 2025 · Permit 22 211450 B06 (revision 01)
- Closed
New house · New building
Revision 01: The building height and rear setback angel have been adjusted according to the attached TLAB decision order, to the proposed 3-storey townhouse project which received the building permit on Sep.18,2023. The ceiling height of the third floor has been revised to 9 feet. The 2nd & 3rd floor layouts of Unit 8 have been revised accordingly. LOT 5 - UNIT A5Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Aug 15, 2024 · issued Oct 11, 2024 · completed Nov 12, 2025 · Permit 22 211450 B05 (revision 01)
- Closed
New house · New building
Revision 01: The building height and rear setback angel have been adjusted according to the attached TLAB decision order, to the proposed 3-storey townhouse project which received the building permit on Sep.18,2023. The ceiling height of the third floor has been revised to 9 feet. The 2nd & 3rd floor layouts of Unit 8 have been revised accordingly. LOT 4 - UNIT A4Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Aug 15, 2024 · issued Oct 11, 2024 · completed Nov 12, 2025 · Permit 22 211450 B04 (revision 01)
- Closed
New house · New building
Revision 01: The building height and rear setback angel have been adjusted according to the attached TLAB decision order, to the proposed 3-storey townhouse project which received the building permit on Sep.18,2023. The ceiling height of the third floor has been revised to 9 feet. The 2nd & 3rd floor layouts of Unit 8 have been revised accordingly. LOT 3 - UNIT A3Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Aug 15, 2024 · issued Oct 11, 2024 · completed Nov 12, 2025 · Permit 22 211450 B03 (revision 01)
- Closed
New house · New building
Revision 01: The building height and rear setback angel have been adjusted according to the attached TLAB decision order, to the proposed 3-storey townhouse project which received the building permit on Sep.18,2023. The ceiling height of the third floor has been revised to 9 feet. The 2nd & 3rd floor layouts of Unit 8 have been revised accordingly. LOT 2 - UNIT A2Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Aug 15, 2024 · issued Oct 8, 2024 · completed Nov 12, 2025 · Permit 22 211450 B02 (revision 01)
- Closed
Heating and ventilation
Revision 01: The building height and rear setback angel have been adjusted according to the attached TLAB decision order, to the proposed 3-storey townhouse project which received the building permit on Sep.18,2023. The ceiling height of the third floor has been revised to 9 feet. The 2nd & 3rd floor layouts of Unit 8 have been revised accordingly. HVAC - LOT 8 - UNIT A8Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Aug 15, 2024 · issued Nov 13, 2024 · completed Oct 7, 2025 · Permit 22 211450 H08 (revision 01)
- Closed
New house · New building - lead
Revision 01: The building height and rear setback angel have been adjusted according to the attached TLAB decision order, to the proposed 3-storey townhouse project which received the building permit on Sep.18,2023. The ceiling height of the third floor has been revised to 9 feet. The 2nd & 3rd floor layouts of Unit 8 have been revised accordingly. LOT 1 - UNIT A1Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Aug 15, 2024 · issued Oct 8, 2024 · completed Nov 12, 2025 · Permit 22 211450 B01 (revision 01)
- Closed
Heating and ventilation
HVAC - LOT 3 - UNIT A3Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Oct 5, 2023 · issued Jan 5, 2024 · completed Oct 7, 2025 · Permit 22 211450 H03
Show 34 more permits
- Closed
Heating and ventilation
HVAC - LOT 4 - UNIT A4Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Oct 5, 2023 · issued Jan 5, 2024 · completed Oct 7, 2025 · Permit 22 211450 H04
- Closed
Heating and ventilation
HVAC - LOT 5 - UNIT A5Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Oct 5, 2023 · issued Jan 5, 2024 · completed Oct 7, 2025 · Permit 22 211450 H05
- Closed
Heating and ventilation
HVAC - LOT 6 - UNIT A6Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Oct 5, 2023 · issued Jan 5, 2024 · completed Oct 7, 2025 · Permit 22 211450 H06
- Closed
Heating and ventilation
HVAC - LOT 7 - UNIT A7Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Oct 5, 2023 · issued Jan 5, 2024 · completed Oct 7, 2025 · Permit 22 211450 H07
- Closed
Heating and ventilation
HVAC - LOT 8 - UNIT A8Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Oct 5, 2023 · issued Jan 5, 2024 · completed Oct 7, 2025 · Permit 22 211450 H08
- Closed
Heating and ventilation
HVAC - LOT 1 - UNIT A1Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Oct 5, 2023 · issued Jan 5, 2024 · completed Oct 8, 2025 · Permit 22 211450 H01
- Closed
Heating and ventilation
HVAC - LOT 2 - UNIT A2Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Oct 5, 2023 · issued Jan 5, 2024 · completed Oct 7, 2025 · Permit 22 211450 H02
- Closed
Drains and site services
Drain - LOT 8 - UNIT A8Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Dec 7, 2022 · issued Sep 18, 2023 · completed Nov 12, 2025 · Permit 22 211450 D08
- Closed
Plumbing
Plumbing - LOT 6 - UNIT A6Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Dec 7, 2022 · issued Sep 18, 2023 · completed Oct 7, 2025 · Permit 22 211450 P06
- Closed
Plumbing
Plumbing - LOT 7 - UNIT A7Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Dec 7, 2022 · issued Sep 18, 2023 · completed Oct 7, 2025 · Permit 22 211450 P07
- Closed
Plumbing
Plumbing - LOT 8 - UNIT A8Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Dec 7, 2022 · issued Sep 18, 2023 · completed Oct 7, 2025 · Permit 22 211450 P08
- Closed
Plumbing
Plumbing - LOT 1 - UNIT A1Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Dec 7, 2022 · issued Sep 18, 2023 · completed Oct 8, 2025 · Permit 22 211450 P01
- Closed
Plumbing
Plumbing - LOT 2 - UNIT A2Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Dec 7, 2022 · issued Sep 18, 2023 · completed Oct 7, 2025 · Permit 22 211450 P02
- Closed
Plumbing
Plumbing - LOT 3 - UNIT A3Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Dec 7, 2022 · issued Sep 18, 2023 · completed Oct 7, 2025 · Permit 22 211450 P03
- Closed
Plumbing
Plumbing - LOT 4 - UNIT A4Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Dec 7, 2022 · issued Sep 18, 2023 · completed Oct 7, 2025 · Permit 22 211450 P04
- Closed
Plumbing
Plumbing - LOT 5 - UNIT A5Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Dec 7, 2022 · issued Sep 18, 2023 · completed Oct 7, 2025 · Permit 22 211450 P05
- Closed
Drains and site services
Drain - LOT 1 - UNIT A1Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Dec 7, 2022 · issued Sep 18, 2023 · completed Nov 12, 2025 · Permit 22 211450 D01
- Closed
Drains and site services
Drain - LOT 7 - UNIT A7Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Dec 7, 2022 · issued Sep 18, 2023 · completed Nov 12, 2025 · Permit 22 211450 D07
- Closed
Drains and site services
Drain - LOT 2 - UNIT A2Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Dec 7, 2022 · issued Sep 18, 2023 · completed Nov 12, 2025 · Permit 22 211450 D02
- Closed
Drains and site services
Drain - LOT 3 - UNIT A3Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Dec 7, 2022 · issued Sep 18, 2023 · completed Nov 12, 2025 · Permit 22 211450 D03
- Closed
Drains and site services
Drain - LOT 4 - UNIT A4Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Dec 7, 2022 · issued Sep 18, 2023 · completed Nov 12, 2025 · Permit 22 211450 D04
- Closed
Drains and site services
Drain - LOT 5 - UNIT A5Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Dec 7, 2022 · issued Sep 18, 2023 · completed Nov 12, 2025 · Permit 22 211450 D05
- Closed
Drains and site services
Drain - LOT 6 - UNIT A6Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Dec 7, 2022 · issued Sep 18, 2023 · completed Nov 12, 2025 · Permit 22 211450 D06
- Closed
New house · New building
LOT 2 - UNIT A2Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Sep 30, 2022 · issued Sep 18, 2023 · completed Nov 12, 2025 · 1 home added · Permit 22 211450 B02
- Closed
New house · New building
LOT 4 - UNIT A4Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Sep 30, 2022 · issued Sep 18, 2023 · completed Nov 12, 2025 · 1 home added · Permit 22 211450 B04
- Closed
New house · New building
LOT 3 - UNIT A3Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Sep 30, 2022 · issued Sep 18, 2023 · completed Nov 12, 2025 · 1 home added · Permit 22 211450 B03
- Closed
New house · New building - lead
LOT 1 - UNIT A1Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Sep 30, 2022 · issued Sep 18, 2023 · completed Nov 12, 2025 · 1 home added · Permit 22 211450 B01
- Closed
New house · New building
LOT 8 - UNIT A8Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Sep 30, 2022 · issued Sep 18, 2023 · completed Nov 12, 2025 · 1 home added · Permit 22 211450 B08
- Closed
New house · New building
LOT 7 - UNIT A7Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Sep 30, 2022 · issued Sep 18, 2023 · completed Nov 12, 2025 · 1 home added · Permit 22 211450 B07
- Closed
New house · New building
LOT 6 - UNIT A6Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Sep 30, 2022 · issued Sep 18, 2023 · completed Nov 12, 2025 · 1 home added · Permit 22 211450 B06
- Closed
New house · New building
LOT 5 - UNIT A5Proposal to construct a new 3 storey townhouse with an integral garage. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Sep 30, 2022 · issued Sep 18, 2023 · completed Nov 12, 2025 · 1 home added · Permit 22 211450 B05
- Cancelled
New building
Proposal to construct a new 3 storey Townhouse Block with 8 units with integral garages and a total GFA of 1,205.73 sm. See also 22 154931 DEM, 22 154937 DEM and 18 250662 NNY 23 SA.
Applied Jun 1, 2022 · completed Sep 22, 2023 · 8 homes added · Permit 22 154952 BLD
- Closed
Demolition
Proposal to demolish the existing 1 storey SFD-detached dwelling.
Applied Jun 1, 2022 · issued Sep 19, 2023 · completed Oct 9, 2025 · 1 home removed · Permit 22 154931 DEM
- Closed
Demolition
To demolish existing one storey house for redevelopment of townhouses
Applied Apr 29, 2019 · issued Sep 19, 2023 · completed Mar 21, 2025 · 1 home removed · Permit 19 146454 DEM
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- TLAB appeal
Minor variance · Other
Proposal to construct a three-storey townhouse with 8 residential units.
Decision: Refused (hearing Feb 1, 2024)
Filed Dec 8, 2023 · File A0626/23NY
What’s planned nearby
Development sites within 500 m
- Approved
8 homes · Residential
20 m away · Condominium · Approved · filed Mar 25, 2025
- Under review
4 storeys · Residential
60 m away · Rezoning · Under review · filed Aug 8, 2024
- Approved
7 storeys · 40 homes · Residential
380 m away · Rezoning · Approved · filed May 28, 2025
- Under review
4 storeys · Residential
380 m away · Site plan · Under review · filed Apr 26, 2022
Neighbours’ Committee of Adjustment files within 250 m
226 Olive Ave · Minor variance
To construct a three storey fourplex, with a garden suite in the rear yard. Please note, the application was previously deferred by the Committee of Adjustment on June 12, 2025.
150 m away · filed Apr 30, 2025 · Approved
261 Finch Ave E · Minor variance
Proposal to permit a Pharmacy and Medical Walk-in Clinic.
110 m away · filed Jun 12, 2024 · Refused
11 Winlock Pk · Minor variance
Proposal to construct a new dwelling.
170 m away · filed Jul 7, 2023 · Approved
257 Olive Ave · Minor variance
Proposal to construct a new dwelling.
140 m away · filed Apr 16, 2022 · Approved
260 Olive Ave · Minor variance
To construct a second floor above the existing garage.
120 m away · filed Dec 17, 2020 · Closed
261 Olive Ave · Minor variance
To construct a new dwelling
160 m away · filed Aug 4, 2020 · Approved
28 Maxome Ave · Consent
To obtain consent to sever a portion of the land for the purpose of a lot addition, to create three new lots.
250 m away · filed Nov 3, 2016 · Approved
26 Maxome Ave · Consent
To obtain consent to sever a portion of the land for the purpose of a lot addition, to create three new lots.
230 m away · filed Nov 3, 2016 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.